All ISS systems continue to function nominally, except those noted previously or below. Sunday – crew off duty. Ahead: Week 7 of Increment 27.

Upon wake-up, CDR Kondratyev performed the regular daily check of the aerosol filters at the Russian Elektron O2 (oxygen) generator. [Maxim Suraev installed these filters on 10/19/09 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V). Dmitri inspects the filters again before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.]

FE-3 Garan, FE-5 Nespoli & FE-6 Coleman completed another post-sleep session of the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. It was the 7th for Ron, the 30th for Paolo & Cady. [RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

The six-member crew joined in conducting the regular weekly three-hour task of thorough cleaning of their home, including COL (Columbus Orbital Laboratory) and Kibo JPM (JEM Pressurized Module). [“Uborka”, usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of the uborka house cleaning, CDR, FE-1 & FE-2 completed regular maintenance inspection & cleaning of Group E fan grilles (VPkhO, FS5, FS6, VP) in the SM.

The Russian crewmembers worked in support of Progress 42P-delivered biotech research payloads:

With Andrey Borisenko taking pictures, Alex Samokutyayev removed the BTKh-26 KASKAD (Cascade) experiment from the KRIOGEM-03 cooler (+4 degC) in the SM and set it up in its bioreactor in the Russian Glavboks-S (Glovebox/GB), then serviced the bioreactor. After Dmitri Kondratyev had installed the KT thermostatic container with its BUP-06 control unit, Sasha extracted the bioreactor from the GB, mixed it in the KT container and stored it in the TBU-V (Universal Bioengineering Thermostat V) thermostatic container (+29degC) in the MRM2 module while Dima shot documentary photography. [KASKAD investigates cell cultivation of microorganisms, animals and human in microgravity to obtain concentrated biomass (emulsion) with a high content of cells, providing the increased output of target BAS (bioactive substances). The BIOEMULSIYA science hardware includes a closed-type autonomous bioreactor in a bag, the KT thermostat (temperature-controlled)-body with BUP-06 actuator control unit and the onboard KRIOGEM-03 cooler.]

Meanwhile, Borisenko used the biotech procedure BTKh-39 ASEPTIK of air & surface sampling to determine the degree of sterilization of the Glavboks during its use for KASKAD, accompanied by situational photography. Later in the day, Andrey monitored the automatic shutoff of the ASEPTIK’s pump, retrieved the sample from the GB and set it up for incubation. [ASEPTIK evaluates procedural reliability & effectiveness for methods & equipment to provide aseptic conditions for on-orbit biotechnological experiments. It supports the development of a flow chart for control checks of the sterility of the Glovebox-S hardware and other equipment.]

FE-6 Cady Coleman went on a search for missing hardware required for future FCF (Fluids Combustion Facility) operations – a kit with DuPont Krytox lubricant for the FCF, plus two kits with connector caps for MDCA (Multi-user Droplet Combustion Apparatus) and CIR (Combustion Integrated Rack) IRR. [The FCF Krytox Kit, MDCA Connector Cap Kit, and the CIR IRR Connector Cap Kit were last used during the CIR activities in on 2/9-10/11. Cady was to check two ZSRs (Zero-g Stowage Racks), one in COL, the other in Node-1.]

CDR Kondratyev conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [This includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

CDR, FE-3, FE-5 & FE-6 were scheduled for their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Dima at ~9:00am, Paolo at ~9:50am, Ron at ~11:25am, Cady at ~4:25pm EDT.

The crew worked out with their regular 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (FE-3, FE-6), ARED advanced resistive exercise device (CDR, FE-2, FE-3, FE-5, FE-6), T2/COLBERT advanced treadmill (CDR, FE-1, FE-2, FE-5) and VELO ergometer bike with load trainer (FE-1).

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 8:24am EDT [= epoch])
Mean altitude – 346.2 km
Apogee height – 348.2 km
Perigee height – 344.2 km
Period — 91.46 min.
Inclination (to Equator) — 51.65 deg
Eccentricity — 0.0002983
Solar Beta Angle — 12.2 deg (magnitude decreasing)
Orbits per 24-hr. day — 15.74
Mean altitude loss in the last 24 hours — 200 m
Revolutions since FGB/Zarya launch (Nov. 98) – 71,355

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations————-
TBD — STS-134/Endeavour launch ULF6 (ELC-3, AMS)
TBD — STS-134/Endeavour docking
TBD — STS-134/Endeavour undocking
TBD — STS-134/Endeavour landing (KSC)
05/23/11 – Soyuz TMA-20/25S undock/landing (End of Increment 27)
————–Three-crew operations————-
06/07/11 — Soyuz TMA-02M/27S launch – M. Fossum (CDR-29)/S. Furukawa/S. Volkov
06/09/11 — Soyuz TMA-02M/27S docking (MRM1)
————–Six-crew operations————-
06/xx/11 — ATV-2 “Johannes Kepler” undock (SM aft)
06/21/11 — Progress M-11M/43P launch
06/23/11 — Progress M-11M/43P docking (SM aft)
06/28/11 — STS-135/Atlantis launch ULF7 (MPLM) ~3:30pm EDT NET
06/30/11 — STS-135/Atlantis docking ULF7 (MPLM) NET
07/27/11 – Russian EVA #29
08/29/11 — Progress M-11M/43P undocking
08/30/11 — Progress M-12M/44P launch
09/01/11 — Progress M-12M/44P docking (SM aft)
09/16/11 – Soyuz TMA-21/26S undock/landing (End of Increment 28)
————–Three-crew operations————-
09/30/11 — Soyuz TMA-03M/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin
10/02/11 – Soyuz TMA-03M/28S docking (MRM2)
————–Six-crew operations————-
10/25/11 — Progress M-10M/42P undocking
10/26/11 — Progress M-13M/45P launch
10/28/11 — Progress M-13M/45P docking (DC-1)
11/16/11 — Soyuz TMA-02M/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — Soyuz TMA-04M/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/02/11 — Soyuz TMA-04M/29S docking (MRM1)
————–Six-crew operations—————-
12/26/11 — Progress M-13M/45P undock
12/27/11 — Progress M-14M/46P launch
12/29/11 — Progress M-14M/46P docking (DC-1)
02/29/12 — ATV3 launch readiness
03/05/12 — Progress M-12M/44P undock
03/16/12 — Soyuz TMA-03M/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/30/12 — Soyuz TMA-05M/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Volkov
04/01/12 — Soyuz TMA-05M/30S docking (MRM2)
————–Six-crew operations—————-
05/05/12 — 3R Multipurpose Laboratory Module (MLM) w/ERA – launch on Proton (under review)
05/06/12 — Progress M-14M/46P undock
05/07/12 — 3R Multipurpose Laboratory Module (MLM) – docking (under review)
05/16/12 — Soyuz TMA-04M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-06M/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-06M/31S docking
————–Six-crew operations—————-
09/18/12 — Soyuz TMA-05M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
10/02/12 — Soyuz TMA-07M/32S launch – K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
10/04/12 – Soyuz TMA-07M/32S docking
————–Six-crew operations————-
11/16/12 — Soyuz TMA-06M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/30/12 — Soyuz TMA-08M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/02/12 – Soyuz TMA-08M/33S docking
————–Six-crew operations————-
03/xx/13 — Soyuz TMA-07M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/13 – Soyuz TMA-09M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/xx/13 – Soyuz TMA-09M/34S docking
————–Six-crew operations————-
05/xx/13 – Soyuz TMA-08M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/xx/13 – Soyuz TMA-10M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/xx/13 – Soyuz TMA-10M/35S docking
————–Six-crew operations————-
09/xx/13 – Soyuz TMA-09M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 – Soyuz TMA-11M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 – Soyuz TMA-11M/36S docking
————–Six-crew operations————-
11/xx/13 – Soyuz TMA-10M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 – Soyuz TMA-12M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 – Soyuz TMA-12M/37S docking
————–Six-crew operations————-
03/xx/14 – Soyuz TMA-11M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-