NASA Chandra Status Report 15 April 2005
Operations CXO Status Report Friday 15 April 2005 8.30am EDT
During the last week Chandra completed the observing schedule as planned.
Real time procedures were completed on Apr 8 to disable SCS 29 as a clean-up action to the SCS 107 run on Apr 5, and on Apr 13 to perform a routine diagnostic dump of the CPE.
The schedule of targets for the next week is shown below and includes an observation of SGR 1806-20 accepted as a Target of Opportunity.
------------------------------------------ PKS 1421-490 ACIS-S Apr 18 1WGA J1713.4-3949 ACIS-I Terzan 1 ACIS-S Radiation Belts Apr 19 MACS1311.0-0311 ACIS-I AX J1040.3+2045 ACIS-S Apr 20 NGC 6388 ACIS-S 2PIGGz0.061 J0011 ACIS-I Apr 21 RCW103 ACIS-I SDSSJ123215.81+020 ACIS-S Radiation Belts M87 ACIS-S Apr 22 SGR 1806-20 HRC-S 4U 1700+24 HRC-I W3(OH) ACIS-I ESO 351-021 ACIS-S Apr 23------------------------------------------
All spacecraft subsystems continued to support nominal operations.