Last week the observing schedule was resumed at 7:25am on Nov
8 after radiation levels reached acceptable levels following the
extreme activity of the last two weeks. A total of 741.7 Ks of science
time was lost between 24 Oct and 8 Nov due to 4 load halts.

Real-time procedures were completed on 8 Nov associated with restarting
the daily loads following the radiation shutdown.

The observing schedule for the next week is shown below and includes
an observation of PKS2155-304 coordinated with XMM-Newton.


------------------------------------------
AM0644-741 SW Ring ACIS-S Nov 17
MACS2214.9-1359 ACIS-I
Radiation Belts
NGC 7457 ACIS-S Nov 18
MS2137.3-2353 ACIS-S
2255-282 ACIS-S Nov 19
LBQS 2211-1915 ACIS-S
PMN J2219-2719 ACIS-S
NGC 1386 ACIS-S
PSS 2344+0342 ACIS-S
M74 X-1 ACIS-S Nov 20
51 Eri ACIS-I
Vela Remnant HRC-I
IRAS FSC 08201+2801 ACIS-S
Radiation Belts
NGC 4486B ACIS-S Nov 21
NGC 4564 ACIS-S
NGC 4419 ACIS-S
CL0853+5759 ACIS-I
NGC 1313 X-2 ACIS-S Nov 22
NGC 2787 ACIS-S
PKS2155-304 ACIS-S/LETG
------------------------------------------

All spacecraft subsystems continued to support nominal operations.