Status Report

NASA Chandra Operations CXO Status Report 7 May 2004

By SpaceRef Editor
May 10, 2004
Filed under , ,
NASA Chandra Operations CXO Status Report 7 May 2004
http://images.spaceref.com/news/chandra.jpg

During the last week Chandra completed the observing schedule as planned.

Preparations were completed to return to performing angular momentum unloads from the daily loads. A momentum dump is included in next week’s loads and will be monitored in real-time on Saturday May 8 at 8am EDT.

The schedule of targets for the next week is shown below and includes a series of observations of the bright comet C/2001 Q4 (NEAT) to be studied in conjunction with data from the CHIPS spectroscopic mission.

------------------------------------------ 
F1420-3039              ACIS-S      May 9
Abell 2670              ACIS-I
Radiation Belts                     May 10
4U 1730-22              ACIS-S      May 11
EXO 1912+097            ACIS-S
NGC 6809                ACIS-S
G26.6-0.1               ACIS-S      May 12
SDSS J130211.04+00      ACIS-S
C/2001 Q4 (NEAT)- 3 obs ACIS-S
CL1216+2633             ACIS-I
M87                     ACIS-S
Radiation Belts                     May 13
RX J0806.3+1527         ACIS-S
Extended CDF-S #2       ACIS-I
Radiation Belts                     May 15
Extended CDF-S #2       ACIS-I      May 16 

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to 2004 Status Reports

SpaceRef staff editor.