Status Report

MRPO Daily Status Report 2-27-03

By SpaceRef Editor
February 27, 2003
Filed under , ,

GMT Date: 058

Calendar Date: 02/27/03

Increment: 6

Stage: 11A

Week 13

Payloads currently on-board ISS:
BSTC, CGBA, CSLM-2, InSPACE, MAMS, MSG (facility), PFMI, SAMS, STES-10,
SUBSA and ZCG.

Status:
MAMS, SAMS and STES-10 continue nominal, basically unattended, operations.
BSTC, CGBA, CSLM-2, InSpace, PFMI, SUBSA and ZCG are inactive. MSG
is in a trouble-shooting mode.

EXPRESS RACKS 1 and 4 (ER1 & ER4) are powered and supporting payload
operations. ER2, ER3 & ER5 are currently powered down.

The MSG circuit breaker problem is continuing to be evaluated and troubleshooting
procedures continued. Today’s troubleshooting activities accomplished
by the crew were to rotate the rack out, and disconnect 13 sensor power
cables. The rack was then rotated back into position, and MSG was brought
to Main Power. No circuit breaker trip occurred. Continuing troubleshooting
in the coming days will involve the reconnection of the cables that were
disconnected today, following a fault tree analysis to determine where
the problem has occurred. Time is being allocated to perform additional
MSG trouble-shooting procedures during this week.

InSpace Coil assemblies have been confirmed to be ready to begin test
operations when it is feasible to install the payload in the MSG.

MAMS is operating nominally in the quasi-steady mode. HiRAP is currently
inactive. MAMS data is available on the acceleration measurement web
page.

PFMI hardware removal from the MSG is contingent upon success of MSG
trouble-shooting.

All SAMS sensors in EXPRESS RACKS are operating nominally. The SAMS
sensor in the MSG is currently turned-off. SAMS data is also available
on the acceleration measurement web page.

STES-10 health and status data is nominal. STES-10 is configured with
diffusion-controlled chambers that require no crew operation activities.

Near-term Outlook:

Week 13 (2/24-3/2) – Planning for this week was based on approximately
14 hours of crew time for NASA payload operations. Time is allocated
for MSG trouble-shooting several times during this week.

Week 14 (3/3-3/9) – Preliminary planning for this week is being
based on approximately 7 hours of crew time for NASA payload operations.
MSG trouble-shooting may continue during this week.

M. Vlasse, PhD, DSc
PSR Increment Scientist

ACRONYMS:

BCSS Biotechnology Cell Science Stowage
BSTC Biotechnology Specimen Temperature Controller (General status information
on this payload will include coverage of the following items of support
equipment: BTR, BCSS and GSM)
BTR Biotechnology Refrigerator
CGBA Commercial Generic Bioprocessing Apparatus
ER1 EXPRESS RACK 1
ER2 EXPRESS RACK 2
ER3 EXPRESS RACK 3
ER4 EXPRESS RACK 4
ER5 EXPRESS RACK 5
GSM Gas Supply Module
InSPACE Investigating the Structure of Paramagnetic Aggregates
MAMS Microgravity Acceleration Measurement System
MSG Microgravity Science Glovebox
PAO Public Affairs Office
PFMI Pore Formation and Mobility Investigation
PGB Plant Generic Bioprocessing Apparatus
PSR NASA Code U Physical Sciences Research Division
RIC Rack Interface Controller
SAMS Space Acceleration Measurement System II
SPD NASA Code U Space Products Development Division
STES Protein Crystal Growth – Single Thermal Enclosure System
SUBSA Solidification Using a Baffle in Sealed Ampoules
ZCG Zeolite Crystal Growth

SpaceRef staff editor.