Status Report

MRPO Daily Status Report 1-30-03

By SpaceRef Editor
January 30, 2003
Filed under , ,

GMT Date: 030

Calendar Date: 01/30/03

Increment: 6

Stage: 11A

Week 9

Payloads currently on-board ISS:
BSTC, CGBA, CSLM-2, InSPACE, MAMS, MSG (facility), PFMI, SAMS, STES-10,
SUBSA and ZCG.

Status:
MRPO payloads MAMS, SAMS and STES-10 continue nominal, basically unattended,
operations. BSTC, CGBA, CSLM-2, InSpace, PFMI, SUBSA and ZCG are inactive.
MSG is inactive/failed, awaiting replacement parts. MSG replacement
parts have been stowed in Progress 10, currently scheduled for launch
on February 2nd. A plan has been developed to maximize payload operations
after MSG operational capability is restored.

EXPRESS RACKS 1, 3 and 4 (ER1, ER3 & ER4) are powered and supporting
payload operations. ER2 has been powered down since it on longer has
an active payload to support. ER5 is available to support payload operations
but is currently inactive. ER1, ER3, ER4 and ER5 software upgrades have
been accomplished. ER2 software upgrade is planned for week 11.

MAMS is operating nominally in the quasi-steady mode. HiRAP is currently
inactive. MAMS data is available on the acceleration measurement web
page.

All SAMS sensors in EXPRESS RACKS are operating nominally. The SAMS
sensor in the MSG is currently turned-off. SAMS data is also available
on the acceleration measurement web page.

STES-10 health and status data is nominal. STES-10 is configured with
diffusion-controlled chambers that require no crew operation activities.

Near-term Outlook:

Week 9 (1/27-2/2) – Planning for this week was based on approximately
12 hours of crew time availability for NASA payload operations. ARIS
3 check-out/calibration is scheduled daily during this week. The crew
is packing as many disposable items on Progress 9 as possible. Progress
9 is scheduled to undock on 2/1. Progress 10 launch is scheduled for
2/2.

Week 10 (2/3-2/9) – Preliminary planning for this week is being based
on approximately 24 hours of crew time availability for NASA payload
operations. Progress 10 is scheduled to dock with the ISS on 2/4. Transfer
operations to off-load Progress 10 will begin immediately after docking.
The MSG repair parts will be transferred as soon as possible and installed
on the MSG. PFMI hardware, and the partially processed PFMI sample, will
be recovered and stowed. MSG will be checked-out and, assuming all is
well, InSpace will be installed, checked out and test runs are to be
conducted.

M. Vlasse, PhD, DSc
MRPO Increment Scientist

ACRONYMS:

ARIS Active Rack Isolation System
BCSS Biotechnology Cell Science Stowage
BSTC Biotechnology Specimen Temperature Controller (General status information
on this payload will include coverage of the following items of support
equipment: BTR, BCSS and GSM)
BTR Biotechnology Refrigerator
CEVIS Cycle Ergometer Vibration Isolation System
CGBA Commercial Generic Bioprocessing Apparatus
ER1 EXPRESS RACK 1
ER2 EXPRESS RACK 2
ER3 EXPRESS RACK 3
ER4 EXPRESS RACK 4
ER5 EXPRESS RACK 5
GSM Gas Supply Module
HCOR High-Rate Communications Outage Recorder
InSPACE Investigating the Structure of Paramagnetic Aggregates
ISS International Space Station
MAMS Microgravity Acceleration Measurement System
MCOR Medium-Rate Communications Outage Recorder
MSG Microgravity Science Glovebox
OCR Operations Change Request
PFMI Pore Formation and Mobility Investigation
PGBA Plant Generic Bioprocessing Apparatus
SAMS Space Acceleration Measurement System II
STES Protein Crystal Growth – Single Thermal Enclosure System
SUBSA Solidification Using a Baffle in Sealed Ampoules
ZCG Zeolite Crystal Growth

SpaceRef staff editor.