MRPO Daily Status Report 06-19-02
GMT Date: 170
Calendar Date: 06/19/02
Increment: 5
Stage: UF2
Week 2
STS Landing at KSC was waved-off today in favor of landing at Edwards Air Base in California. Landing at Edwards occurred at approximately 1:00 CDT today.
MRPO payloads returned on STS-111 were: BTR, CGBA, CPCG-H, PCG-EGN, PCS, and ZCG samples.
Payloads currently on-board ISS: ADVASC, BSTC, InSPACE, MAMS, MEPS, MSG, PFMI, SAMS, StelSys, STES-8, SUBSA and ZCG. InSpace will not operate during this increment.
Status: EXPRESS RACKS 1 and 4 (ER1 & ER4) are powered and supporting payload operations. ER2 is scheduled to be repowered June 24. ER3 is installed in the US Lab and will be checked out later. ER5 was checked out during Increment 4 and powered down.
The Medium Rate Communication Outage Recorder (MCOR) is experiencing occasional over-temperature conditions requiring it to be turned-off. When MCOR is turned-off, payload data is lost during loss of signal periods.
ADVASC is downlinking nominal health and status data and plants are now visible.
BSTC was activated yesterday to support Stelsys operations today through Friday. BSTC health and status data is nominal.
MAMS is operating nominally in the quasi-steady and HiRAP modes. MAMS data is available on the acceleration measurement web page.
MEPS is stowed in ER3. It will be transferred to ER1 during week 3 and initial operations are scheduled for week 6.
MSG checkout will be initiated in week 4.
PFMI is stowed in the US Lab and is scheduled to operate in the MSG late in the UF-2 stage.
SAMS equipment in all racks is operating nominally. SAMS data is also being posted to the acceleration measurement web page.
The first set of StelSys samples were processed in the BSTC today. Follow-on Stelsys operations will occur tomorrow and Friday.
STES-8, with all six growth chambers activated, is downlinking nominal health and status data.
SUBSA is stowed in the US Lab and will be operated in the MSG following completion of MSG checkout.
ZCG samples will be placed in the ZCG furnace during week 3 for processing. The ZCG hard-drives were replaced today in preparation for operations.
Near-term Outlook:
Week 2 (6/17-6/23) -Planning for this week was based on approximately 12 hours of crew time availability for NASA payload operations. BSTC/StelSys crew operations are scheduled for the next 2 days.
Week 3 (6/24-6/30) – Preliminary planning is being based on approximately 21 hours of crew time availability for NASA payload operations. Progress 7 will be undocked to de-orbit and Progress 8 will be launched and docked with the ISS during this week. ER2 will be activated. ZCG samples will be loaded into the furnace and activated. ADVASC sampling will be conducted, MEPS will be transferred to ER1 and MSG checkout will begin.
M. Vlasse, PhD, DSc
MRPO Increment Scientist
ACRONYMS:
ADVASC – Advanced Astroculture
ARIS–Active Rack Isolation System
ARIS-ICE — ISS Characterization Experiment
BCSS — Biotechnology Cell Science Stowage
BSTC– Biotechnology Specimen Temperature Controller (General status information on this payload will include coverage of the following items of support equipment: BTR, BCSS and GSM)
BTR — Biotechnology Refrigerator
CGBA – Commercial Generic Bioprocessing Apparatus
CPCG-H #1 – Commercial Protein Crystal Growth High Density Unit.
ER1– EXPRESS RACK 1
ER2 — EXPRESS RACK 2
ER3 – EXPRESS RACK 3
ER4 – EXPRESS RACK 4
ER5 – EXPRESS RACK 5
EVA – Extra-Vehicular Activity
GSM — Gas Supply Module
InSPACE- Investigating the Structure of Paramagnetic Aggregates
ISS – International Space Station
MAMS — Microgravity Acceleration Measurement System
MCOR -Medium Rate Communication Outage Recorder
MEPS – Microencapsulation Electrostatic Processing System
MSG – Microgravity Science Glovebox
PCG-EGN – Protein Crystal Growth-Enhanced Gaseous Nitrogen Dewar
PCS — Physics of Colloids in Space
PFMI – Pore Formation and Mobility Investigation
SAMS — Space Acceleration Measurement System II
STES – Protein Crystal Growth – Single Thermal Enclosure System
ZCG – Zeolite Crystal Growth