Status Report

Mir Status Report 7 March 2001

By SpaceRef Editor
March 7, 2001
Filed under ,

Mission Control Center

TsNIIMash [Central Scientific Research Machine Building Institute]

Rosaviakosmos [Russian Aviation and Space Agency]

Moscow, Russia

Press release: March 07, 2001, 09:00 (Moscow time) [06:00 UTC]

The operations scheduled on OC [Orbital Complex] “Mir” for March 6 are
complete.

The OC “Mir” onboard systems were checked out, orbit radio monitoring
performed.

The recent telemetry data received during communication sessions confirm:
the complex remains pressurized, the thermal mode is normal, the onboard
systems perform nominal, solar arrays generate enough power.

The OC “Mir” is in free drift and continues its deceleration in upper
atmosphere.

The next status report is scheduled for March 8, 2001.

Trajectory report No 48

07.03.2001

(OC “MIR”)

Date: 07.03.2001

Flight orbitÝnumber (day): 86077(01)

Orbit period (in min): 89.546

Mean orbit altitude (km): 255.1

Daily average altitude decay (km): 2.0

Beta angle, i.e. the angle of the
Sun vector to the orbital plane (in degrees): +13.4

Duration of daylight (min): 53.5

Solar and geomagnetic activity current parameters:

solar F10.7 flux: 160

geomagnetic index Ap: 8

F10.7 <= 100 -low level;

100 < F10.7 < 150 -medium level;

F10.7 >= 150 -high level

Time of altitude Hav ~ 250 km: 10.03.2001 +1 day / -1 day

Re-entry prediction with consideration of
15% deviation fromÝsolar flux activity value: 27.03.2001 +5 days / -4 days

Date of the orbit parameters calculations: 06.03.2001

Renewed information is expected on 08.03.2001 at 01.00 p.m. DMT.

SpaceRef staff editor.