Mir Status Report 4 March 2001
Mission Control Center
TsNIIMash [Central Scientific Research Machine Building Institute]
Rosaviakosmos [Russian Aviation and Space Agency]
Moscow, Russia
Press release: March 04, 2001, 09:00 (Moscow time) [06:00 UTC]
The operations scheduled on OC [Orbital Complex] “Mir” for March 3 are
complete.
During communication sessions the OC “Mir” onboard systems were checked
out and the orbit monitoring performed.
The Station remains pressurized, the onboard systems perform norminal.
The OC “Mir” keeps in a free drift with its solar arrays generating
enough electricity.
The OC “Mir” onboard systems will be checked out and orbit monitoring
is scheduled for 5 March.