Status Report

Mir Status Report 17 Mar 2001

By SpaceRef Editor
March 17, 2001
Filed under ,

TsUP [Mission Control Center]

TsNIIMash [Central Scientific Research Machine Building Institute]

Rosaviakosmos [Russian Aviation and Space Agency]

Moscow, Russia

Press release: March 17, 2001, 09:00 (Moscow time) [06:00 UTC]

The operation with OC [Orbital Complex] “Mir” scheduled for March 16 is
complete.

The recent telemetry data confirmed the OC “Mir” remains pressurized, the
thermal condition is normal. The batteries generate enough electric power
to provide onboard systems nominal performance and register trajectory
parametres.

The next status report will be issued on March 18.

Trajectory report No 58 17.03.2001 (OC “MIR”) Date: 17.03.2001

  • Flight orbit number (day): 86235(01)

  • Orbit period (in min): 89.11

  • Mean orbit altitude (km): 233.5

  • Daily average altitude decay (km): 2.5

  • Beta angle, i.e. the angle of the
    Sun vector to the orbital plane (in degrees): +50.5

  • Duration of daylight (min): 57.8

  • Solar and geomagnetic activity current parameters:

    solar F10.7 flux: 140

    geomagnetic index Ap: 7

    F10.7 <= 100 -- low level;

    100 < F10.7 < 150 -- medium level;

    F10.7 >= 150 — high level

  • Time of altitude Hav ~ 220 km
    Dynamic operations are scheduled to start on: 21.03.2001 +2 days

  • Re-entry prediction with consideration of
    15% deviation from solar flux activity value: 28.03.2001 +3 days / -2 days

  • Date of the orbit parameters calculations: 17.03.2001

  • Renewed information is expected on 18.03.2001 at 01.00 p.m. DMT.

  • SpaceRef staff editor.