TsUP [Mission Control Center]

TsNIIMash [Central Scientific Research Machine Building Institute]

Rosaviakosmos [Russian Aviation and Space Agency]

Moscow, Russia

Press release: March 16, 2001, 09:00 (Moscow time) [06:00 UTC]

During the recent communication sessions a routine check out of the “Mir”
onboard systems was performed, trajectory paramatres were registered,
analysed and processed.

The cargo ship “Progress M1-5” motion control system was given a trial
run to get the complex ready for de-orbiting.

The complex remains pressurized, the thermal mode is normal. The batteries
generate enough electric power to provide onboard systems nominal
performance .

The next status report will be issued on March 17.

Trajectory report No 57 16.03.2001 (OC “MIR”)

  • Date: 16.03.2001

  • Flight orbit number (day): 86219(01)

  • Orbit period (in min): 89.161

  • Mean orbit altitude (km): 236.0

  • Daily average altitude decay (km): 2.5

  • Beta angle, i.e. the angle of the
    Sun vector to the orbital plane (in degrees): +48.5

  • Duration of daylight (min): 57.4

  • Solar and geomagnetic activity current parameters:

    solar F10.7 flux: 140

    geomagnetic index Ap: 7

    F10.7 <= 100 -- low level;

    100 < F10.7 < 150 -- medium level;

    F10.7 >= 150 — high level

  • Time of altitude Hav ~ 220 km
    Dynamic operations are scheduled to start on: 21.03.2001 +2 days

  • Re-entry prediction with consideration of
    15% deviation from solar flux activity value: 28.03.2001 +3 days / -2 days

  • Date of the orbit parameters calculations: 16.03.2001

  • Renewed information is expected on 17.03.2001 at 01.00 p.m. DMT.