Mir Status Report 12 Mar 2001
TsUP [Mission Control Center]
TsNIIMash [Central Scientific Research Machine Building Institute]
Rosaviakosmos [Russian Aviation and Space Agency]
Moscow, Russia
Press release: March 12, 2001, 09:00 (Moscow time) [06:00 UTC]
The operations sheduled with OC [Orbital Complex] “Mir” for March 11 are
fully complete.
The station continues in free drift.
The recent telemetry data confirmed the OC “Mir” remains sealed. The
onboard systems perform nominal, the Complex arrays generate enough
electricity, the thermal mode is normal.
Today on the Station (core block) the Motion Control System (MCS) digital
central computer was powered on, it is being loaded with command software.
The next status report is scheduled for March 13 2001.
Trajectory report No 53
12.03.2001 (OC “MIR”)
Sun vector to the orbital plane (in degrees): +35.4
solar F10.7 flux: 155
geomagnetic index Ap: 8
F10.7 <= 100 -- low level;
100 < F10.7 < 150 -- medium level;
F10.7 >= 150 — high level
Dynamic operations are scheduled to start on: 21.03.2001 +2 days / -1 days
15% deviation from solar flux activity value: 28.03.2001 +3 days / -3 days