Status Report

Mars Odyssey THEMIS Images: August 5 – 9, 2013

By SpaceRef Editor
August 9, 2013
Filed under , , ,

– Volcanic Flows (05 August 2013) 

http://themis.asu.edu/zoom-20130805a

– Erosion (06 August 2013)
http://themis.asu.edu/zoom-20130806a

– Dunes (07 August 2013)
http://themis.asu.edu/zoom-20130807a

– Gorgonum Chaos (08 August 2013)
http://themis.asu.edu/zoom-20130808a

– Filled Fracture (09 August 2013)
http://themis.asu.edu/zoom-20130809a

All of the THEMIS images are archived here:

http://themis.asu.edu/latest.html

NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

SpaceRef staff editor.