Jonathan’s Space Report No. 481 2002 Jun 13
Shuttle and Station
——————–
Endeavour docked with the Station at 1625 UTC on Jun 7. The Leonardo
MPLM module was attached to the Station on June 8.On Jun 9, Chang-Diaz
and Perrin made a spacewalk from the Quest airlock. It was depressurized
at around 1522 UTC and the hatch was opened at 1524 UTC. The suits went
to battery power at 1527 UTC. The astronauts installed the PGDF grapple
fixture on the P6 truss, stowed some space debris shields on the PMA-1
adapter, and prepared the Mobile Base System (MBS) in the Shuttle cargo
bay. The hatch was closed at 2234 UTC and the airlock began
repressurization at 2242 UTC. MBS was unberthed sometime around 2220 UTC
and docked to the Mobile Transporter at 1304 UTC on Jun 10. On Jun 11 at
about 1515 UTC the Quest was depressurized again, with Chang-Diaz and
Perrin opening the hatch around the same time and going to battery power
at 1520 UTC. During this spacewalk the astronauts completed setting up
the MBS system. The hatch was closed at 2016 UTC and Quest was
repressurized at 2020 UTC. (While on travel in Europe, I don’t have
access to NASA TV, so if anyone has more accurate times please let me
know. The details presented here are based on press reports and on
the excellent coverage on www.spaceflightnow.com. Normal service
will be resumed next week.)
Recent Launches
—————
A Krunichev Proton-K put a Russian domestic communications satellite
in orbit on Jun 10. Ekspress A1R was built by NPO PM and Alcatel
for Kosmicheskiya Svyaz, the Russian satcom operator.
Table of Recent Launches
———————–
Date UT Name Launch Vehicle Site Mission INTL.
DES.May 4 0131 SPOT 5 ) Ariane 42P Kourou ELA2 Imaging 21A
Idefix ) Amateur radio 21B
May 4 0954 Aqua Delta 7920-10L Vandenberg SLC2W Rem.sensing 22A
May 7 1700 DirecTV-5 Proton-K/DM3 Baykonur LC81 Comms 23A
May 15 0150 Feng Yun 1D ) Chang Zheng 4B Taiyuan Weather 24B
Hai Yang 1 ) Rem.sensing 24A
May 28 1525 ‘Ofeq-5 Shaviyt Palmachim Imaging 25A
May 28 1815? Kosmos-2389 Kosmos-3M Plesetsk Navigation 26A
Jun 5 0644 Intelsat 905 Ariane 44L Kourou ELA2 Comms. 27A
Jun 5 2122 Endeavour ) Shuttle Kennedy LC39A Spaceship 28A
Leonardo )
Jun 10 0114 Ekspress A1R Proton-K/DM2M? Baykonur Comms
Current Shuttle Processing Status
_________________________________
Orbiters Location Mission Launch DueOV-102 Columbia OPF STS-107 2002 Jul 19 Spacehab
OV-103 Discovery OPF Maintenance
OV-104 Atlantis OPF STS-112 2002 Aug 22 ISS 9A
OV-105 Endeavour ISS STS-111 2002 Jun 5 ISS UF-2
.————————————————————————-.
| Jonathan McDowell | phone : (617) 495-7176 |
| Harvard-Smithsonian Center for | |
| Astrophysics | |
| 60 Garden St, MS6 | |
| Cambridge MA 02138 | inter : jcm@cfa.harvard.edu |
| USA | jmcdowell@cfa.harvard.edu |
| |
| JSR: http://hea-www.harvard.edu/~jcm/space/jsr/jsr.html |
| Back issues: http://hea-www.harvard.edu/~jcm/space/jsr/back |
| Subscribe/unsub: mail majordomo@head-cfa.harvard.edu, (un)subscribe jsr |
‘————————————————————————-‘