ISS MER Daily Report 23 Apr 2001

By SpaceRef Editor
April 23, 2001
Filed under , ,

























ISS MER Daily Report


Date: 4/23/01


STS 100/ISS 6A


GMT Day: 2001/113


Overall System Status:



  • LAB RPCM LAD22B-A Health Flag Set

  • SM Battery 4 is in Capacity Restoration Mode

  • MCA had an AutoRestart. MCA successfully completed restart and is back on line.


C&DH:


SMCC: SMCC 1 & 2 , and 3 Operating in the Redundant set.


SMTC: 1 & 2 Operating in the Redundant Set


FGB MDM: FGB-2 ON/FGB-1 Off


N1-2 Primary/N1-1 Secondary


PV MDM: 4B Prime/2B Backup


C&C:C&C-1 Primary/C&C-2 Backup /C&C-3 Standby


INT: INT-2 Operating/INT-1OFF


GNC: GNC-1 Primary/GNC-2 Backup


LA: LA-1, LA-2 & LA-3 Operating


PMCU: PMCU-1 Operating/PMCU-2 OFF


PL: PL-1 primary/PL-2 off


TCS:


EETCS Loops A&B running on A pumps


PTCS: 6 Node 1 shell htrs on; 1 PMA1 shell htrs on; 2 PMA 2 Shell Htrs


ITCS Dual loop mode



EPS:


Russian Segment:


FGB Batteries-in incomplete charge mode


FGB Battery 4 offline


SM Batteries-in incomplete charge mode


SM ARCU 22 ON


USOS:


Both channels fully operational


BGAs in Auto Track Mode


PCU 1 in Discharge, PCU 2 Discharge


ECLS:


Russian Segment:


Elektron – On


Vozdukh — On


BMP — ON


CKB1 — On; CKB2 — OFF


SM SD#6 Failed


FGB SD 1, 3,4,& 5 — Off


Rapid Depress Response inhibited


Low Pressure warning Enabled


Response to Smoke/Fire Inhibited


Node1:


Cabin Fan — On


Aft Port IMV Fan On


Aft Port, Deck Aft, Fwd Port & Fwd Stbd IMV valves Open


SD-1 enabled, SD-2 OFF


PPRV’s not Capped


Cabin Pressure FDIR – Inhibited


USL:


PCA: LAB PCA in Mon, Rapid depress FDIR Enabled


IMV: AFT valves open; Aft Port Fan — ON


SD’s: LAB1PD1, LAB1SD5, & LAB1D6 Enabled


CCAA: LAB1P6 Full Up, LAB1S6 ON


CDRA: Override/Stop complete.


TCCS: Full Up State


MCA: Operational, Auto Sample


VES: VRS&VES 2.5" valves closed


Water Venting: Inhibited State


GNC:


Attitude Control Mode: CMG-TA with a momentum manager controller


Attitude: 0.2, 23., 0 (TEA)


Average Altitude: 388.3 km x 378 km


Beta: -11.1 with increasing magnitude



C&T:


FGB Komparus Deactivated


S-Band High Data Rate Mode


ECS Deactivated (will only be used for video con)


Audio System Nominal


Last 24 Hours Status



  • During activation the Latching End Effector (LEE) B Camera Light Assembly (CLA) Light failed to come on. Opened IFI 343. Flight Controllers tried cycling the light 5 times to restore functionality with no joy. SSRMS operations can continue today with out the light.

  • Also got R6B SSRMS LEE Camera On/Off Error. (Opened IFI 344). Error message cleared. Have seen this error on the ground.

  • BGA ART met yesterday to discuss additional troubleshooting plans. Plan is to re-try latch #2 in the last successful orientation (19.5°) to see if it engages. If not, then during EVA2 the crew will go up to the BGA & use the pin tool to measure the depth of the pin & see if it can be pushed back. (If the toggle switch is functioning, the pin should not be able to be pushed back significantly) The pin will be re-actuated, and the depth will be checked again.


  • Received a CMG #2 Loss of Comm. (Opened IFI 345). Fail Indication was same as seen previously (IFI 225), however the auto-retry in the GN&C FDIR was disabled and did not occur. Multiple dumps were made to capture all relevant data. ADCO successfully commanded to recover CMG and put it back on line.


  • SLP Super Bolt Configuration — Following EVA1, HSV-ESR was concerned that the super bolts were not properly installed in the SLP quiver based on crew call downs. The crew reported that they could not get the quiver latching plate fully engaged. MER is investigating to determine if the socket head cap screws on the super bolts are aligned parallel to the SLP sill causing interference with the latching plate. The socket head cap screws were supposed to be perpendicular to the SLP sill so that latching plate could slide between them. It is suspected that the bolts were clocked from the proper position due to an incorrect picture in the EVA checklist.


  • ISS Ingress occurred around 4 am.

  • SSRMS is now securely attached to the LAB.


  • MPLM install will occur later today.


Upcoming Events for GMT 2001/114 (All times CDT)


  • C&T UHF Activation 4:00am

  • Possible BGA 4B Latch 2 troubleshooting 5:00am

  • MPLM transfers

  • EVA 2 egress at 7:50 am

  • J400 Panel reconfiguration

  • ECOM STBD Antenna removal

  • SLP Uninstall

  • FSE GF Unbilical release

  • VSC Removal

  • DCSU Trasfer