Date: 3/17/01


STS 98/ISS 5A.1


GMT: 75:12:00 To GMT: 076:12:00


(12 a.m. 3-16-01 to 12:00 a.m. 3-17-01)


OVERALL SYSTEM STATUS:



ISS/Shuttle docked, ISS in control of attitude:



  • FGB: SD 1,3,4 and 5 powered off do to telemetry problems, all other SD on, Dew Point 52.8 deg. F (55.2 deg. F); EPS: Nominal; Battery 6 offline in deep discharge (nominal). FGB Komparus failed and deactivated. C&DH: FGB-2 MDM on, FGB-1 MDM off.

  • SM Elektron is off. Vozdukh is on. BMP status is on. CKB1 is on and in condensing mode; CKB2 is failed sensor and is non operational, powered off. Rapid depress response is off, Low-pressure warning is enabled. Dew Point 52.5 deg. F (52.8 deg. F). EPS: Nominal; Batteries in incomplete charge mode. SM ARCUs 22 online. SMTC: SMTC-1, 2 are operating in the redundant set. SMTC-3 was reported out of the set at GMT:2001/066:14:00 GMT; SMCC: SMCC 1, 2, and 3 are all operating in the redundant set. SMCC-1 is primary.

  • NODE1 ACS: Pressure limiting inhibited. Both Node 1 PPRV’s are not capped-MOD uncapped during PMA3 depress. IMV Fans: Node 1 Aft Port operating; all others off. IMV Valves: Node 1 aft port open and enabled; Aft Stbd closed and enabled; Port-fwd inhibited, Deck Aft is open and enabled; Deck Fwd is closed and enabled; Stbd both inhibited; Fwd both enabled and open. FDS: SD-1 enabled, SD-2 Smoke detector off due to RPC Trip. THC: Node 1 cabin fan is operating; RAMV (N1 side) is enabled in 90% cool for MPLM. C&DH: N1-2 MDM is primary, N1-1MDM is secondary

  • LAB PCA: Lab PCA on and monitoring. Positive Pressure relief is enabled VRCV and VRIV are closed. IMV Vlv/Fans: aft IMV valves are enabled and open. Aft port IMV fan is on. Fwd Stbd IMV valve is enabled and open. Fwd Stbd IMV fan is on. FDS: Smoke detectors LAB1PD1, LAB1SD5, & LAB1D6 on. CCAA: LAB1P6 full up. CDRA: Fail state. TCCSS: Full up state. MCA: Operational and providing US lab and Node and MPLM samples. Vacuum System: VRS & VES are closed. All VES RIVs are closed. Water Venting: Idle state. Condensation tank quantity indicates 70.42 lbm (65.49 lbm). Condensate "T" is not installed. Cabin Pressure: 14.65 psia (14.66), Cabin Temp 76.1 deg. F. (75.8 deg. F), ppCO2 is 3.9 mmHg (3.1 mmHg), ppO2 is 158.7 mmHg (160.6mmHg). EPS: is nominal., RWS-Lab UOP 7 had GFCI trip during checkout. RPCM N13B-A RPCM 16 (Node SD2) experienced an over current trip; TCS: ATCS &PTCS are nominal;. ITCS: LT and MT in dual loop mode. The low temperature 3-way mixing valve is in full flow through, with outlet temperature of 44.8 deg. F (7.1 deg. C). The moderate temperature 3-way mixing valve is controlling to outlet temperature to 63.3 deg. F (17.4 deg. C.) Rack temperatures are nominal. C&T: Ecomm is powered off. S-band: configured for HDR; Audio Subsystem: configured for IAC2 and operations are nominal. AUAI2S, RAIU 1 have PBIT Faults. Video System: Operational. CBCS: Video cabin from ISS to PMA2 and shuttle in check out testing. C&DH: C&C MDMs: 1 is primary, 2 is backup, 3 is in standby. INT MDM: INT-2 is operating, INT-1 is off. GNC MDMS: GNC-1 primary, GNC-2 backup; LA MDMs: LA-1, LA-2, and LA-3 operating.

  • Crew Systems: TVIS is operational with foot plate installed. IRED only one canister operational, no fix til 6A.

  • MPLM: Temperature is 76.8 deg. F (78.1 deg. F). ppCO2 3.3 mmHg. (MPLM shell heaters have been turned off). Overhead Aft IMV enabled and open; Overhead Fwd IMV valve closed; cabin fan on, smoke detector on; PPRA 1, 2, and 3 are closed. MDM Operating.

  • P6: Both PCUs in discharge mode. PVCU MDM 2B is prime/4B Backup. BGAs in Auto Track Mode. EETCS Loops A&B running on A pumps; FCV enabled; PFCS line heater 1&2 for loop B and B operational. RPCMs: N13B-A & N14B-C have health flags. PMCU: PMCU-1 MDM primary, MPCU-2 off.

  • GNC: ISS is currently flying in TEA ISS/CMG TA in control of Mated stack, Beta Angle —15.9 degrees and mag decreasing. Avg. altitude is 211.7 x 203 nm; 392.18 x 376.02 km (200×210 nm; 370 x 389 km). S&M subsystems quiescent and operable.

 


Previously Reported Status



  • Activation of RWS

  • MPLM transfer activities

  • Trouble shooting of CBCS

  • Node 1 8A & 9A heaters forced to enable. 2nd occurrence within 24 hours.


  • C&C #3 MDM successfully loaded and reinitialized.




 


Last 24 Hours Status



  • SD-2 RPCM trip during power up post charcoal filter replacement activities.

  • RWS Checkout tripped UOP 7. Reconfigured for one monitor only, checkout completed.

  • ISS reboost

  • MPM transfer activities.

  • ISS initialized vents (Pre heated to 260 deg. F) for impending water dump.




SIGNIFICANT EVENTS SCHEDULED FOR THE NEXT 24 HOURS:



  • Water dump 8 a.m.

  • MPLM Packing

  • MPLM Deactivation

  • Vestibule Depress

  • MPLM Re-Berthing operations.



 


 














































































































































































Open Chits


Number (ISS)


Response Due (GMT)


Summary of Progress


(OPEN ISSMER CHITS — LATE ISSMER CHITS — NON ISSMER CHITS)


Chits without further MER Input required Chits that require MER Manager Action!


The following chits are all in Mission STS-098_5A


ISS0009


2001/037:00:00


MOD to IPRUSSIA, ISSMER — "5A Increment Full C&W Checkout Procedure"


3/9 — MER-M is not ready to close this CHIT — DO NOT CLOSE


ISS0126


2001/046:18:00


ISSMER to IPRUSSIA,MOD — "Russian Depress Sensor Status"


2/26 — MOD response is in, need response from Russians


ISS0199


2001/060:17:04


MOD to ISSMER — "S-bd Forward Link Audio Demux Activity"


3/9 — Expect info from HB and KSC today or tomorrow to close early next week. C&T Test scheduled for ISL on 3/22 to characterize data stream corruption of MRELP


ISS0204


2001/060:00:00


MOD to ISSMER — "Add NCS Loadshed Table 5 to Recon"


3/10 — ISSMER response provided.


ISS0206


2001/088:15:00


ISSMER to IPRUSSIA — "SMCC lane drop on GMT day 0505"

 

ISS0207


2001/068:15:00


Post 5A.1- 80


ISSMER to MOD — "Node 1 MDM CPU utilization dump requests"


C&DH gave Odin extension to GMT day 80


ISS0211


2001/061:20:00


Post-5A.1


MOD to ISSMER — "LA 1,3 LLA 11 Channel Anomalies"


3/10 — HSV says data will not be available until post-5A.1. C&DH has concurrence from ODIN that this is OK.


TI0107


???


ISSMER to ??? — Loss of S-Band Forward Audio Detection and Recovery"


3/10 — C&T still working this. When ready to open, transfer to a 5A.1 chit.


TI0249


2001/????


ISSMER to IMC, MOD, IPRUSSIA – "The Use of L200 Foam for Insulation Used around the SM Air Conditioner"


3/9 — Want to add to 5A.1 Increment Ops job jar. HOLD Opening until after 5A.1 Mission. Should also transfer to 5A.1 Database.

       

The following chits are all in Mission STS-102_5A.1


ISS0011


2001/066:12:00


ISSMER to IPRUSSIA — "Request for SMCC Lane Change Information"


3/16 — Russian Response provided — C&DH reviewing.


ISS0035


2001/071:20:30


IMC to IPRUSSIA, ISSMER, MOD — "REQUIREMENTS: Updates to Stage 5A.1 Priorities"


ISS MER Response Provided


ISS0043


2001/071/23:00


MOD to ISSMER — "Mass Properties Information for RSC-E Assembly & Config"


MER Response Complete


ISS0076


2001/073:16:00


MOD to ISSMER — "S-Band RFG Antenna Self Test Failure"


MER Response Complete


ISS0088


2001/074:16:00


IMC to CSR, ISSMER, MER, MOD — "5A.1 Transfer (MPLM): FD8, US Manifest/Transfer List"


MER Response Complete


ISS0090


2001/074:21:00


IMC to ISSMER, CSR, MOD — "Requirements: Request for MACE II data download to PCMCIA"


MER Response Complete


ISS0091


2001/075:17:34


IPRUSSIA to MOD — "S-Band timeline request"

 

ISS0092


2001/074:08:00


ISSMER to MOD — "Lab Condensate Venting Video Coordination"

 

ISS0096


2001/075:18:00


ISSMER to MOD — "Label SWIS Network Control Unit (NCU)"


3/16 — Waiting for OSO concurrence


ISS0100


2001/075:06:00


IMC to IPRUSSIA, ISSMER, MOD, CSR — "5A.1 ADD Docked Day to Flight for MPLM Stowage"


3/16 — Chit asks for analysis, but specifies analysis deadlines that are after the chit’s deadline.


ISS0101


2001/076:02:00


ISSMER to IMC, MOD, CSR, MER — "Return of Dessicant Bags"


3/16 — Chit opened, awaiting responses


ISS0103


2001/076:16:00


IMC to CSR, ISSMER, MER, MOD — "5A.1 Transfer (Shuttle Middeck): FD8, US Manifest/Transfer List"


3/16 — MER Response Complete


ISS0104


2001/076:12:00


ISSMER to MOD — "Antenna Calibration to avoid SSU radiation"

 

ISS0105


2001/077:14:39


IPRUSSIA to MOD — "Onboard Control Events Protocol & Data on C&W signals appearance in USOS"

 

ISS0106


2001/077:00:00


ISSMER to MOD — "Request BDTs to verify health of SSU 2B"

 

ISS0108


2001/076:02:00


IMC to IPRUSSIA, ISSMER, MER, MOD — "5A.1 Transfer: FD9, Russian Manifest/Transfer List"


L&M working


ISS109


2001/077:00:00


MOD to ISSMER — "Failed Dzus fastener on LAB1DO-02 Panel"


3/16 — S&M working

       

TI0115


2001/075:20:00


IMC to CSR, ISSMER, MER, MOD — "5A.1 Transfer: FD9, RUSSIAN Manifest/Transfer List"

 

TI0127


2001/076:00:18


ISSMER to IMC,MOD — "TVIS Imagery"


3/16 — Waiting for Safety

       






































































Closed Chits


Number (ISS)


Response Due (GMT)


Summary of Progress


The following chits are all in Mission STS-098_5A


ISS0210


2001/060:20:00


IPRUSSIA to MOD — "S-Band Timeline Request"


The following chits are all in Mission STS-102_5A1


ISS0025


2001/068:23:00


ISSMER to MOD — "Recently Released Station Program Notes"


ISS0066


2001/074:12:00


ISSMER to MOD — "MSD DDC Defect Data Dump Request Modification"


ISS0070


2001/073:12:00


MOD to ISSMER — "ISS Condensate Venting Attitude Constraints"


STS0073


2001/074:15:42


CSR to IMC, ISSMER, MER, MOD — "Transfer LiOH Cartidges from MPLM to Shuttle


ISS0075


2001/073:01:15


MOD to ISSMER — "Internal Audio Controller (IAC) 1 Transition Anomaly"


ISS0077


2001/073:16:00


IMC to CSR, ISSMER, MER, MOD — "5A.1 Transfer (Shuttle Middeck): FD7, US Manifest/Transfer List"


ISS0078


2001/073:16:00


IMC to CSR, ISSMER, MER, MOD — "5A.1 Transfer (Shuttle MPLM): FD7, US Manifest/Transfer List"


STS0085

 

MOD to MER


ISS0087


2001/074:19:00


IMC to ISSMER, et.al. — "5A1 Transfer (Shuttle Middeck): FD8, US Manifest / Transfer List"


ISS0095


2001/073:05:26


IMC to ISSMER, et.al., -"5A.1 Middeck Return Transfer: Add the following items to the middeck for return"


ISS0102


2001/075:15:45


IMC to ISSMER, MOD — "RSP Bag Swap"


ISS0097


2001/075:15:00


ISSMER to IMC, MOD, IPRUSSIA — "Return of CWC S/N 5066 on 5A.1"


ISS0107


2001/079:14:06


ISSMER to IMC, MOD — "TVIS Imagery" – withdrawn


 










































































































































































Open Items for Investigation (IFIs)


Number


Title/Summary


Status


170


PCU Tubes never reached temp when heaters active


3/6 — Final solution in work. PRACA?


210


FPP Failure to Acquire Data


3/6 — Need data from Eliason


218


EVA Tool does not fit TCS Nonpropulsive Vent bolt heat


3/8 — Need to have details of EVA bolt resolution at KSC. Ready to close?


227


Burnt wires on veloergometer control box


3/6 — Need data filled in by EV&CS


229


HRDL MSD Inaccessible


3/6 — Need data filled in by C&DH


230


Node 1 PMA Duct Missing Parts


3/16 — Need to find out from crew how duct was reconfigured following the Soyuz relocation. Parts are on orbit. Has the crew found them yet?


235


Treadmill Slats Broken


3/16 — Need data filled in by EV&CS Have FIAR. Can close when IFI data filled in.


241


Station Vibration During TVIS Exercise


3/16 — Need data filled in by S&M or EV&CS? Waiting for IWIS data.


244


Periodic Annunciation of S-Band XPDR Non-critical Failure advisories


3/8 — Need Software PR. Needs to go to ASCB to get approval to write PR. C&T and C&DH working this.


245


S-Band BSP Loss of Forward link Audio Channel RELP Sync


3/7 — Close to S/W PR 2124? C&T confirming with MEIT data that this is the same problem.


247


Hitch Pin on WIF adapter Separated from Lanyard


3/16 — Have FIAR. EV&CS providing additional data for closure.


248


Audio Subsystem AUAI2S PBIT Indication


3/7 — Hardware is working. C&T needs additional data dumps to diagnose problem. Check PBIT chit.


249


C&C-2 MDM Switched to Diagnostic from Primary


3/8 — PPL uploaded. Still in work by ASCB?


253


SM KURS-P "Not Normal" Indication


SM Nadir Port Set 1 Self test failed twice. MCC-M plans to test on aft port to try isolate problem to the cable. SM Aft port test passed 3/16 — VI/Jack Bacon working this. Need to fill in IFI data.


254


BGA Observed vs Commanded Position (part 3)


3/16 — Non problem, but need NASA S/S Manager concurrence. Need Flt Rule CR to document reqt to lock BGAs?


255


OCA Intermittent Operation


3/7 – Need data and plan filled in by C&T


259


Echo on S-Band (Ground)


3/8 — Troubleshooting procedure uplinked to crew (OCA 1652). Troubleshooting planned post5A.1.


260


CCS-2 MSD Year incorrect for Filename : LDF.txt


3/7 – Need data filled in (from Funny Database?) by C&DH


261


S-BAND Gimbal Temperatures


3/16 — Have PR20449. Ready to close?


266


N1-2 MDM EEPROM Checksum Error


3/16 — MER C&DH working issue. Need SW PR.


270


4B BGA Latch #2 Failure to engage

 

273


4B BGA Motor Current Trip

 

276


Circles on Nadir CBM flange photographed

 

277


Center line Berthing system unusable

 

278


Internal Audio Controller (IAC) #1 Failover to IAC#2

 

280


N1N/MPLM Vestibule Closeout


3/16 — Have PRACA. Waiting for crew to measure vestibule.


281


DDCU LA3B Output Voltage Bias higher than expected with Converter off

 

283


S Band RFG Bit Summary

 

284


MPLM RPC-11 Output Voltage above expected value when off.

 

285


Node 1 8A Heater Forced to "Enable to Operate"

 

287


Rack K-Bar Fit Problems

 

288


UOP Trip During RWS Activation

 

289


N1-3B-A RPC 16 Overcurrent Trip

 

290


Lab Port water vent heaters did not achieve expected temperature.

 

291


S Band Radiation of STBD SSU

 

292


PCS Log Download Failure

 

293


Lab Condensate Tank Leak fail indication

 

294


Loss of PFR Attachment Device (PAD)


EV&CS will work this week of 3/19


295


PMA3 Connector P601 Unable to throw bail on stowage receptacle


EV&CS will enter data and complete week of 3/19


296


SM Gas Mask has 13 mm tear


ECLSS is working


 






















































Closed Items for Investigation (IFIs)


Number


Title/Summary


282


MTSAS Active Capture Latch Turn Count


264


RPC Tripped during LTA Activation


265


DZUS Fastener on Lab Panel 1S7_03


271


BGA Transition to Blind Mode Unexpectedly


275


P608 Dust Cap Cover


286


Node 1 3A Heater 3A & 8A Command Status Wrong


274


J603 O-Ring


198


SSC Network not Functioning


209


OCA Headset Cable Failure


251


SKV 2 Shutdown Due to Oil Pressure Sensor


252


EEATCS Loop A Radiator Return Temperature Spikes


257


Unexpected momentum/attitude disturbances


262


IRED Scraping


279


MPLM ELPS Current


263


Seat Track Fit Problem


 