Status Report

ISS MER Daily Report 14 October 2000 GMT: 288:07:00 To GMT: 289:07:00

By SpaceRef Editor
October 14, 2000
Filed under

















































































ISS MER Daily Report


Date: 10/14/00


STS 92/ISS 3A


GMT: 288:07:00 To GMT: 289:07:00


(3:00 a.m. 10-14-00 to 3:00 a.m. 10-15-00)


OVERALL SYSTEM STATUS:



All ISS systems are in nominal flight/stage configuration with the exception of the following:



Previously Reported Status



  • FGB Smoke Detectors 1, 3, 4, and 5 have been powered OFF.

  • SM Smoke Detector 7 is failed.

  • SM Solar Array #II portion of inboard panel segment not deployed.

  • SM Batteries #4 and #5 are off line.

  • The Orbiter Ku band has failed and the S-band is used to downlink the SWIS data through Ground

Stations.


  • Docking was nominal, with the exception that no "close" indication of X4 connector was received. The only active function that passes through this connection is a 1553 Bus. Telemetry data verified that there was data flowing through this bus. Inspection of the connector during the EVA is being discussed.


Last 24 Hours Status:



  • Russians concurred with closing the PGO/GA hatch and keeping the PEV in electric Open until final egress.

  • Loss of Orbiter Payload Cabin 3 bus took out OSVS, keel camera, and OIU 1 and delayed the berthing of the Z1 for approx. 2:20 minutes. Delay caused deferral of FGB ingress until FD9. Backup SVS was recovered to support Z1 installation.

  • Z1 installation was successfully completed @ GMT 288:18:40 and Installation of both Z1 ground straps completed @GMT 288:20:55.

  • Vacuum Access Jumper leak check failed the pressurization and leak test of the Z1 dome. Initial assessment is that leakage observed in the VAJ was due to temperature rebound after VAJ was isolated from space vacuum.

  • CBM N1 Zenith Mate Prep completed at GMT 288:09:00. All steps performed nominally.

  • FGB AFT KVD valve did not respond to repeated commands. Command should be two steps (arm, fire) but three steps (arm, fire, inhibit) were seen. FGB AFT KVD responded to correct command.

  • The CMGs continue to experience temperatures that are within the pre-flight predictions.

  • Audiotape of PMA APAS hatch opening indicated that a clunk noise was heard earlier than expected (fewer turns of the handle). Clunk is probably caused by hatch rollers disengaging from support bracket. S&M is investigating number of turns required for full travel and where disengagement normally occurs.

  • FGB to Node 1 power allocation is currently 1750 W.

  • Maneuver back to attitude completed @ GMT: 288:18:51.

  • FGB batteries are in full charge mode.

 


 


SIGNIFICANT EVENTS SCHEDULED FOR THE NEXT 24 HOURS:



  • EVA 1 Egress @ GMT: 290:14:17 (09:17 am 10-15-00)

  • Z1 String 1 Umbilical @ GMT: 290:15:22 (10:22 am 10-15-00)

  • S-Band antenna Subassembly Relocate @ GMT: 290:15:47 (10:47 am 10-15-00)

  • Z1 String 2 Umbilical @ GMT: 290:16:57 (11:57 am 10-15-00)

  • Space To Ground Antenna Dish Install @ GMT: 290:17:27 (12:27 pm 10-15-00)

  • Port ETSD Install @ GMT: 290:19:07 (14:07 pm 10-15-00)

  • EVA 1 Ingress @ GMT: 290:20:47 (15:47 pm 10-15-00)

  • Shuttle/ISS Reboost @ GMT: 290:23:17 (18:17 pm 10-15-00)


Open CHITS


Number (ISS)


Response Due (GMT)


Summary of Progress


(OPEN ISSMER CHITS — LATE ISSMER CHITS — NON ISSMER CHITS)


The following chits are all in Mission STS-101_2A2


ISS0166


2000/236:22:00


ISSMER to MOD — "USOS Stowage Latch Handle Configuration"


ISS0185


2000/276:17:00


MOD to IPRUSSIA — "SM, FGB, and Progress Propellant Loading.


The following chits are all in Mission STS-92_3A


ISS0005


2000/278:17:00


MOD to IMC, ISSMER — "CBM GO for Bolting Criteria" – MER response provided. S&M still working this with OSO.


ISS0028


2000/287:21:20


MOD to IMC, IPRUSSIA, ISSMER — "FGB stowage update for BUPT/PTAB CTB" — ISS MER Response provided.


ISS0029


2000/289:00:00


MOD to IPRUSSIA — NO MER ACTION REQUIRED


ISS0033


2000/285:21:00


IMC to CSR, ISSMER, MER, MOD — "Updates to the hardware priority loss flight rule (FR 3A_2C-21.C)" — ISS MER Response provided.


STS0038


2000/292:00:00


MOD to IMC, ISSMER, MER — "FRGF Contingency" — ISSMER Response being revised by VI


ISS0041


2000/288:23:00


IMC to ISSMER, MER, MOD — "Trouble shooting of X4 Connector Failed Indication — MER Response Provided.


ISS0045


2000/291:20:00


MOD to ISSMER — "Recon Products Check" — C&DH working


TI0008

 

ISSMER to IPRUSSIA – "SM Battery Requirements with Crew Onboard"


TI0012


2000/299:20:00


ISSMER to IPRUSSIA – "FGB Battery 1 and 6 cycling" —


TI0013


2000/299:20:00


ISSMER to IPRUSSIA – "SM Unexpected Battery Cycling"


TI0055

 

ISSMER to MOD — "CBM Failure Recovery Procedure" — OSO reviewing prior to opening.

     


 










































Closed Chits


Number (ISS)


Response Due (GMT)


Summary of Progress



STS0036


2000/287:18:00


MOD to ISSMER, MER — "EVA Contingency Review — Action Items"


ISS0039


2000/288:17:30


ISSMER to MOD — "Request for Data Dump of Node 1 MDM Internal Temperatures"


ISS0042


2000/288:05:00


MOD to ISSMER — "PCBM and ACBM Temps for Z1 Mate"


TI0050


ISSMER to MOD — "Node1/PMA1 Internal Pressure" — WITHDRAWN


ISS0010


2000/287:13:00


ISSMER to MOD — "EVA Install SGANT Dish on Boom"


ISS0043


2000/288:22:00


ISSMER to MOD — "EVA Install SGANT Dish on Boom #2"


ISS0044


2000/289:00:00


ISSMER to MOD — "SASA Relocation Bolt Torque Increase"


TI0047


ISSMER to MOD — "FGB PGO/GA Hatch Closure Condition" – Withdrawn
























Open Items for Investigation (IFIs)


Number


Title/Summary


154


FGB Batteries 1 and 6 Cycling Simultaneously


155


SM Battery 6 Unexpected Cycle Mode


156


SMCC/SMTC Lane Drops


159


SM Battery 4 Stuck in Cycle Mode















Closed Items for Investigation (IFIs)


Number


Title/Summary


157


Loss of Redundant SM/Progress Data Cable


158


SM Smoke Detector 7 Fail Indication

SpaceRef staff editor.