EVA Tools and Crew Aids Panel 8 Jan 2001
EVA Tools and Crew Aids Panel
Minutes of Meeting
January 8, 2001
The EVA Tools and Crew Aids Panel met at JSC on January 8, 2001, in Building 1, Room 360, at 1:00 p.m. Representatives from the following organizations participated:
EVA Project Office
Hardware Development
Engineering Directorate
Crew and Thermal Systems Division
FCE EVA
Safety, Reliability and Quality Assurance Office
Hamilton Standard Management Services
Lockheed Martin
Panel members from the following organizations participated:
XA/Panel Chair, XA/Panel Secretary, XA/Integration and Operations, DX3/EVA, Robotics, and Crew Systems, EC5/Crew and Thermal Systems Division, and USA FCE/EVA
The following items were presented:
- PRACA Status NS43/T. Miller
A total of 18 FIARs is open for EVA hardware. Eight FIARs were reported as past due and statused as follows:
BFCE026A022 Draeger Tube Hydrazine Discoloration on Draeger Tube.
Per USA, closure rationale provided to SSM. Pending final closure from SSM.
JSCEC0838F MMWS Gimbal button falling out of assembly.
EC5/M. Lawson to obtain root cause from OSS. New ECD 2/2/01.
JSCEC0839 REBA Charger REBA failed to show green LED during acceptance testing.
Pending root cause from SSM. To have new ECD next week.
JSCEC0796 Active WIF Assy Active WIF Control knob appeared to have increased force to operate.
No update was available.
JSCEC0837F MMWS Sticking/binding of gimbal.
Per EC5/R. Schwarz, have two more to rework. Once done, FIAR can be closed. Anticipate closure by next week.
JSCER0034 USA SAFER SAFER battery thermistor bad solder joints.
No SAFER representation.
JSCER0035 USA SAFER SAFER battery erratic current readings.
No SAFER representation.
JSCER0033 USA SAFER NSI trace on oscilloscope appeared abnormal.
No SAFER representation.
The following action was assigned:
Action 1/8/01-1: Update USA SAFER FIARs status by next Monday.
Actionee: XA/A. Huynh
Due Date: 1/15/01
No new FIARs were reported.
STS-98 FIARs were statused as follows:
JSCEC0843 Trace Gas Analyzer (TGA) Handle Assy Lock button not rebounding/locking handle during -60 Deg. Functional.
Hardware was tested last week and passed. FIAR will be closed.
BFCE026T002 Equipment Hook Assy RET hook open during test.
Final in signature loop with XA.
The EVA hardware oldest FIAR, opened against the Adaptive Payload Carrier is 491 days old.
The total FIARs open by flight is as follows:
STS-98 2
STS-102 12
STS-100 11
- Cert Status NC52/M. Doughney
There are two open certification items for STS-98, either of which may not fly. The Hydrazine Detection Pad, which is having a problem with the color chart, will be tested at WSTF this week. It has yet to be determined by the programs whether the Trace Gas Analyzer will be flown. There are four open certification items for STS-102. Certification for the EVA Scissors is pending release of drawings, which per EC5, are 80% complete. There are 11 open certification items for STS-100.
- Mission Hardware Status LOC/K. Thomas
- Actions Review XA/G. LeStourgeon
All STS-98 hardware has been shipped for flight. All STS-102 hardware is working for an on-dock date of 1/12/01. Two DRs have been written on the Body Restraint Tethers (BRTs) and one DR has been written on the MMWS. All STS-100 hardware has been shipped for MPLM Bench Review. All STS-104 hardware for the airlock ETSD has been shipped except for the large cutter panel. Three items that will be stored inside the airlock are still being processed (3 handrails, the handrail carrier and 3 EHIP bulbs). These items will be shipped approximately 2/16/01 and are needed by 3/5/01. A sweep will be done to see if the correct handrails are here. If they need to be cut down it will take approximately 1 week. EC5/R. Schwarz will investigate and have story back for the next Tool Panel on whether more handrails need to be built.
The following actions were statused:
Action 11/20/00-2 XA/B. Counts: Update 5A ESEL to replace SAFER switch guard with previous configuration per CR H-0753R2.
CLOSED.
Action 10/5/00-1 XA/J. Dutton: Process SSCN to obtain funding from ISS for U.S. Lab slidewire work being accomplished on H-0890R1 and H-0877.
Can close when 5A returns.
Action 11/20/00-1 DX3/K. Knotts: Assure proper use of socket in crew training and procedures to prevent puling on Wobble Socket while attached to PGT.
CLOSED. Crew trained for ops constraint.
Action 11/13/00-1 EC5/R. Schwarz: Provide ROM and schedule for flight hardware.
CLOSED. Not enough definition on CR. To be rewritten.
Action 11/13/00-3 EC5/R. Schwarz: Determine if hardware exists and cost to provide tether point (Ref: H-0909 Modify Inspection Mirror).
Lockheed should have ROM by end of week.
Action 12/4/00-1 EC5/R. Schwarz: Investigate 5A PFR configuration issue and implement corrective action.
CLOSED.
Action 11/13/00-4 EC5/R. Schwarz: Provide ROM and schedule to mark one end of fuse tether (Ref: H-0910 Identification Marking for Adjustable Fuse Tethers).
CLOSED. CR released.
Note: Due to transfer of SSM to Space Station, all EC5/C. Chang actions will be reassigned
- Pending CR Review XA/D. Roberts
- Gage Status EC5/K. Hostetler
This item was deferred.
The monthly Gage Status was presented. This status shows gages that will expire, gages that are in for calibration, gages that are not in for calibration and new gages and gages in calibration.
- H-0235R7 Update STS-98 (5A) Tools ESEL XA/B. Counts
This Revision 7 to the STS-98 Tools ESEL updates serial numbers changed real-time during flight processing, adds a third socket caddy and the QD Lever, and includes the latest configuration REBA Chargers
Decision: Route for technical concurrence.
- H-0668R5 Update STS-102 (5A.1) Tools ESEL XA/A. Mears
- H-0928 Certify Airlock Stowage Bag for ISS Use XA/L. Crocker
This Revision 5 to the STS-102 ESEL contains required additions, deletions, and changes to various tech orders and P/N and S/N updates. It adds the 2" x 7/16" Rigid Socket Extension, the 361 and 381 RETs, 4 Crew Hook Locks (small crew hook on waist tether), and the Gold Salt Kit/Coupons. A position on the crew hook locks is needed from DX by next week. CCBD approval is requested in time for Bench Review to get hardware on CCCD.
Decision: Route for technical concurrence.
This CCBD requests certifying the Airlock Stowage Bag (P/N SKD13101496-306) for ISS (internal) on-orbit stowage and for ISS EVAs. The bag is needed for temporary stowage/staging of EMU items in the ISS airlock for Station Ops. There is insufficient time to build a new bag for this use. This request highlights the fact that there are several hardware items on approved ESELs that are intended to be left on orbit on ISS, but that do not have proper certification.
The following actions were assigned:
Action 1/8/01-2: Review ESELs through 7A.1 to identify what hardware needs ISS certification and provide to XA.
Actionee: NC52/G. Wright
Due Date: 1/22/01
Action 1/8/01-3: Review and certify existing bag for ISS by 3/5/01.
Actionee: EC5/R. Schwarz
Due Date: 3/5/01
Action 1/8/01-4: Investigate whether there is a problem with this bag being used in the airlock.
Actionee: XA/L. Crocker
Due Date: 1/22/01
MOD is currently using this bag to teach pep and post classes.
Decision: Route for technical concurrence.
- EDF Sheath for STS-100 XA/R. Fair
- H-0737R1 Revise STS-98 Tool-to-Tool Fitcheck Matrix HSMS/M. Elder
- H-0927 STS-98 Tool-to-Tool Fitcheck Open Items HSMS/M. Elder
This CCBD requests building a protective sheath for the STS-100 Critical Spare Expandable Diameter Fastener (EDF) to prevent contamination of other EVA hardware. The hardware will be flown in the middeck and taken EVA in an ISS GPA Caddy.
Decision: Route for technical concurrence.
This CCBD requests revising the STS-98 Tool-to-Tool Fitcheck Matrix to incorporate the STS-98 ESEL Rev 7.
Decision: Route for technical concurrence.
This CCBD requests accepting the risk of not performing fitchecks on STS-98 mission specific open fitchecks, open fitchecks between STS-98 tools to on-orbit tools, and open fitchecks between STS-98 tools that are staying on-orbit to on-orbit tools.
Decision: Present to 1/10/01 EHB.
- HITS Status Review XA/O. Mechtchanskaia
A "stoplight" metrics report by flight for hardware and services identified on the Hardware Items Tracking System (HITS) was presented. This report shows hardware and/or service/support delivered, on schedule, and not meeting planned delivery date or program need date. This review will become a standard Tools Panel agenda item until further notice.
No further items were submitted and the Tools Panel adjourned.
Submitted by: Approved by:
(Original signed by) (Original signed by)
________________________________ ________________________________
Harriett A. Attaway Greg LeStourgeon
EVA Tools & Crew Aids Panel Secretary Acting EVA Tools & Crew Aids Panel Chairman
Note: CARD changes are normally routed for concurrence after the Panel adjourns. Initiators are requested to be present or have representation for discussion of the change.