The EEB met at JSC on April 18October 24, 2001, in Building 1, Room 360, at 1:00 p.m. Representatives from the following organizations participated:
EVA Project Office
Hardware Development
Integration and Operations
Astronaut Office
Engineering Directorate
Crew & Thermal Systems Division
EVA and Spacesuit Systems
SR&QA
FCE/EVA
Hamilton Sundstrand Windsor Locks (via telecon)
Hamilton Sundstrand Management Services
USA
Lockheed
EEB Board members from the following organizations participated:
XA/Chairman, XA/Secretary, XA/Tools and Crew Aids, XA/I&O, XA/IM&T, XA/Business Team, XA/SR&QA, CB/Astronaut Office, DX32/EVA Systems Group, EA/Engineering, EC5/EVA and IVA Equipment, and MV5/FCE.
The following items were presented:
- Hardware Integration Schedule XA/Barbara Counts
Changes to the schedule include STS-109/HST-03B CEIT 12/1/01, Bench Review 1/4/02, and V1103 1/31/02.
- PRACA Status NS43/Terry Miller
Twelve A total of eleven (11) FIARs are open for EVA hardware and are shown by flight as follows:
STS-100 (6A) 0
STS-108/UF1 1
STS-109/HST 6
STS-110/8A 11
STS-111/UF2 11
Two FIARs were reported as past due and statused as follows:
JSCEC0860 Body Restraint Tether (BRT). BRT will not stabilize after tensioning.
A new ECD is required. This will be provided by 10/31/01.
JSCEC0901 EHIP Light. EHIP light out of configuration because of crossover band assembly.
A plan is in place to swap out the on-orbit unit.
One new FIAR was reported as follows:
JSCEC0905 High Strength Bridge Clamp. During assembly, the caphead screw P/N NAS1352C06-16 sheared off. Possible suspect of over torqueing the same caphead screw on other HSBC units.
A status will be presented to the 10/29/01 Tools Panel and an interim disposition written.
The following STS-109/HST-03B FIAR was statused:
JSCEC0873 MMWS Gimbal Assembly. Anchor pin found loose inside of the spool pack assembly.
A new design is in work.
There are six EVA hardware and two EMU CAIP FIARs. The following were statused:
JSCEC0886 Top Mounted Handrail, Custom Handrail, Handrail Bracket. Discoloration found inside handrail bracket tube and powdery substance found to be aluminum oxide during PDA.
Corrective action is in place. More updates to the machining process are in work.
JSEC0895 Handrail Bracket. Visual inspection of handrail stanchion through hole showed inconsistent depth of step feature below threads. The stanchion design was certified by test.
A final should be submitted by 10/30/01. Outstanding work includes DCNs and paperwork updates.
JSCEC0889 Modular Gimbal Assy. Potential failure of screws on MMWS gimbal assembly.
DRs and a new cert have been written. The dash number has been rolled. The FIAR can close.
JSCEC0882 MMWS Retracting End Effector. Lever sticking during actuation (open/close) at cold extreme thermal acceptance testing.
This will be remedied in the next configuration change. DCNs are being opened.
JSCEC0781F 5/16" Wobble Socket. Wobble socket detached from PGT during STS-103 EVA.
This is pending completion of change out of all mechanisms.
JSCEC0881 EHIP Lights. Flat washer used on EHIP frame fasteners permanently deforms when torqued.
Cert has been written; close via DR.
No FIARs are open for STS-100.
STS-104 (7A) FIARs were statused as follows:
JSCEC0839 REBA Charger. REBA failed to show green LED during acceptance testing.
EC5/ Hiep Nguyen will be going to the contractor (Summit) 5/4/01.
JSCEC0863F Modular Gimbal Assy. End effector is sticking/not closing (STS-98 anomaly).
EC5/Roger Schwarz reported that he is getting more information from Oceaneering. There may be a "broke" in configuration control. Getting story.
BFCE026A024 High Strength Bridge Clamp. Unlock push button will not extend.
EC5/Roger Schwarz reported the hardware is going through vibe testing this week.
STS-105 (7A.1) FIARs were statused as follows:
BFCE029F105 Pistol Grip Tool (PGT). PGT Chatter.
EC5/Roger Schwarz reported this FIAR is still unexplained. The PGT will be shipped for MPLM Bench Review the end of the month. Interims will be written within the next 2 weeks. Hardware is to be left on-orbit.
The Chairman requested a note be added to the status to show dates interims are needed, shipping on open DR, etc.
The EVA hardware oldest FIAR, against the USA SAFER battery erratic current readings, is 390 days old.
- On-Orbit Limited Life Status NS43/Terry Miller
- Certification Status NS22/Greg Wright
The On-Orbit Limited Life Status lists expirations through February 2002, including the MUT tool carrier, ORU transfer device, tether extension assembly and trace gas analyzer. The CARD has been updated for the tether extension assembly, so this hardware should come off the list. A meeting will be called to discuss how limited life items should be tracked and data entry responsibilities.
Open certification for STS-108/UF1 includes the modular gimbal assembly and EHIP lights.
There are 13 open certification items for STS-109. Paperwork for the APC/MFR latch assemblies is in work.
Open certification for STS-110/8A is the MT energy absorber. A new cert due date of 11/5/01 was assigned.
5. EMU RDR and Certification Status NS22/Charles Sager
RDRs open by flight:
STS-108/UF1 - 2
STS-109/HST-03B - 4
STS-110/8A - 7
Certification:
There are two open certification items for STS-108/UF1, 13 open certification items for STS-109/
HST-03B, and four open certification items for STS-110/8A.
6. USA Limited Life Status USA/Nancy Jeanne Neason
USA has no updates to the Limited Life Status.
7. On-Orbit FIARs/DRs XA/Kristin OBrien
This item was not presented; however, EC5/Kim Hostetler gave an overview on the HSBC fasteners torque tolerance issue.
- Funds Transfer Status XA/Janice Hall
The Agency is still under a continuing resolution; therefore, funds are being transferred for on-going work only.
9. EMU Rotation Plan (H7130) HSWL/Donna Ray
Updates to the EMU Rotation Plan are scheduled for presentation to the EEB on the last Wednesday of the month; however, this is on hold pending the 11/8/01 JPRCB review of options from the SSP and ISS 9A and 11A Tiger Team.
- USA SAFER Flight Logistics Plan (H-0933) XA/Anh Huynh
There were no updates to the USA SAFER Flight Logistics Plan
11. IFA Status XA/Glenn Lutz
The following EEB IFAs were statused:
STS-104-9: In-suit EMU battery recharge early termination.
This IFI will be reported to ISS on 10/30/01 for close out.
STS-104-6: Incorrect BCA data downlink.
DX3/Peggy Guirgis will work this closure.
STS-104-5: Initiate DR on RETs returned on STS-104/7A to determine which serial number was discrepant, if possible
CLOSED 10/15/01. Per EC5/Roger Schwarz, postflight evaluation of the retracting tether inventory has identified one retracting tether S/N 1078 that is not retracting properly. EC5 has generated a DR against this unit. Disassembly and rework as required will be documented on the DR.
12. EEB Actions Status XA/Glenn Lutz
The following EEB actions were statused:
9/19/01-1: Incorporate into V1103 procedures the ability to verify C/W tones.
This action is still in work.
12/5/00-2: Assess all tools used in SSA processing for possible inclusion in SSA Maintenance Manual.
This action is pending CR submittal.
9/26/01-1: Document best practices on maintaining life of batteries.
EC5/Mike Lawson was requested to contact the actionee for an updated status.
4/30/01-1: Track and report completion of validation testing of the EMU and PWR water storage capability to the 25 EVA levels.
A new due date of 11/14/01 was assigned.
9/26/01-2: Document how boots Hamilton Sundstrand sends to the field are in compliance with the ICD requirement.
The actionee will be requested to contact XA/Glenn Lutz.
6/27/01-1: Act on TSA processing recommendations.
A letter to USA on recommendations will be written.
8/27/01-1: Verify that ISS airlock can be equipment pass through for PGTs and BRTs (if required) to perform 96 bolt contingency task.
A new due date of 11/28/01 was assigned.
8/8/01-1: Update ICD to existing capabilities of tool (ref: PGT torque tolerance discrepancy).
A new due date of 11/14/01 was assigned.
9/13/00-2: Publish policy statement on GDRDs, showing as part of new hardware, rationale for operational constraints must be cited.
A letter will be written to request ops constraints be more clearly defined.
No further items were brought forward, and the EEB adjourned.
Submitted by: Approved by:
(Original signed by) (Original signed by)
___________________________ ____________________________
Harriett Attaway Glenn C. LutzBrian Johnson
EEB Secretary Acting EEB Chairman