ESMOS STATUS MEETING MINUTES



The ESMOS Status Meeting was conducted by P. Ondrus at 1:00 PM May 7, 2002. The meeting was held in Room N202 in Building 32.

General Comments and Related Discussion:


Peg Luce is now in Code 400. Mark Walther has been selected to head up IMFP.

Money for office moves is available from Code 200. The amount of award money available for Code 400 has been reduced.

Aqua X-band data flow will start on May 11th.

Discussion of ESMOS Top Ten Issues


#1 — FY03 budget —SOMO backing out of funding networks, institutional support and technology programs. Revamp programs. Cover increased security costs: Working budget issues with CSOC; the 14th rework is now in progress.

#2 — Getting a contract in place to provide anomaly support from LMMS, SBRS, and L3COM: L3COM is resolved; still working on LMMS and Santa Barbara.

#3 —NISN/Code M line cost threat: Still being worked.

#4 — End of Mission planning for ERBS and UARS: Still being worked; ERBS presentation needs to be made to Headquarters. ERBS is a complicated negotiation. We need to provide an estimated time of reentry for all Code Y missions.

#5 — USGS has not provided money to cover FY02 Landsat-7 network costs. NASA has not budgeted for this cost: The Inter Agency agreement pr‚ŽÚ#ing funds for network service was received; funding appears to be about a month and a half away.

#6 — Problem reprocessing ASTER data: Plans are underway for an ASTER direct downlink site in Vietnam.



#7 — System vulnerabilities: Issues are being worked.

#8 — Space in Building 3/14 for EDOS development facility: Alan is leading the effort to prepare the space in Building 3/14 for EDOS sustaining engineering system.

#9 — Aqua Transition: No update.

#10 — DSMC transition NCC and WOTIS operations are moving to WSC during 2002: The rhost feature was widely used in DSMC; the security scan showed a high level of vulnerability. There is a high cost to correct the problem and approximately 3 months may be required.


Comments by A. Krimchansky and Related Discussion:


There are no significant Aqua problems; everything is on schedule and working as expected.

Comments by K. Dolan and Related Discussion:


Anomaly meetings will be held at 1:30 PM instead of 2:00 PM every other week following this meeting.

We are working with JSC on collision avoidance.

Comments by A. Johns and Related Discussion:


There was a configuration problem at the Alaska site for Aqua support. There was also an SGS incident.

The voice replacement questionnaire needs to be answered by the mission managers.

Comments by C. Sigman and Related Discussion:


Attended the NASA IT Security meeting. NPG 2810.1 is being revised; it is in the signature cycle.

We need to be looking into the encryption capability that is being proposed for the NASA infrastructure.

Virtual private network access solutions are being sought.

We need to strengthen our passwords and minimize the use of group accounts.

Comments by R. Casey and Related Discussion:


There is a Terra drag makeup maneuver tomorrow; the CAM is today. There will be a MODIS EEPROM load after the drag makeup.

Comments by B. Kozon and Related Discussion:


The CCR for handling L3COM funding under POES is ready to go out the door today.

Comments by R. Hudson and Related Discussion:


Bill Guit was here to support the Aqua launch.

Comments by C. Gomez and Related Discussion:


EDOS Ops is performing beyond the call of duty with the manual input of all the schedule changes that are being made.



Comments by G. Knoble and Related Discussion:


Looking into the voice communication problem with Norway. An offline meeting is needed to look into the pros and cons of the possible solution that CSOC is proposing.

 


 


Attendees:


Cindi Adams


Phil Province


Alan Johns


Bill Guion


Guy Cordier


Corinne Reed-Miller


Victor Yocco


Jim Elliott


Alex Krimchansky


Ken Dolan


Philip Shimkaveg


Lucia Gayhart


Rick Hudson


Vickie Lopez


Paul Ondrus


Bob Kozon


Rory Casey


Carlos Gomez


Clayton Sigman


Warren Case


Pat Crouse


Jim Wallace


Gordon Knoble


Lou Koschmeder


Lou Kurzmiller

SpaceRef staff editor.