Cassini Weekly Significant Events for 09/07/00 – 09/13/00
The most recent spacecraft telemetry was acquired from the Madrid tracking station on Wednesday, 9/13. The Cassini spacecraft is in an excellent state of health and is operating normally. The speed of the spacecraft can be viewed on the "Where is Cassini Now?" web page
( "http://www.jpl.nasa.gov/cassini/today/" )
The Cruise 21 sequence concluded this week with real time commands sent to the spacecraft to optimize the dust stream measurements for the Cosmic Dust Analyzer (CDA), to power off the Imaging Science Subsystem (ISS) Narrow Angle Camera (NAC) & Wide Angle Camera (WAC), and to turn ISS replacement heaters on. The Final Sequence Integration & Validation (SIV) Approval Meeting was held for Cruise 22. The sequence was then uplinked, registered and activated.
C22 is the first of four sequences containing science activities supporting the Jupiter flyby. It contains the first instance of "repeating template" observations. The template is five days in duration, contains a specific set of observations, and will repeat continuously until ten days into the C23 sequence when a change in observations is desired. A total of four different templates has been designed for the Jupiter period. Templates will be used throughout the Jupiter subphase except for approximately Jupiter -25 days to +22 days. At that time templates are suspended and unique observations will occur. Templates were implemented due to the need for simplified operations during Cassini’s cruise phase.
Activities for the start of C22 included setting of the off sun time constraint, reaction wheel desaturation, loading of a new body vector, ISS power on, replacement heaters off, and IEB load, and the start of Cassini Plasma Spectrometer (CAPS), Cosmic Dust Analyzer (CDA), and Ultraviolet Imaging Spectrometer (UVIS) Flight Software (FSW) loads. The FSW load activity will continue into next week.
Cruise 23 has completed the subsequence generation phase with all instrument teams and the Spacecraft Office supplying their detailed command requests for the background sequence. C23 is now in the Sequence Integration and Validation Phase, where all subsequences will be integrated together to produce the official background sequence.
The CDA experimenters from the Max-Planck-Institut fur Kernphysic in Heidelbeg, Germany, brought the engineering model of their instrument to the Integration and Test Laboratory (ITL) at JPL for detailed flight software testing. The integration of the instrument into the lab was completed and testing is underway.
The Spacecraft Operations Office held a bimonthly Flight Software and Critical Sequence status review.
All user acceptance testing of TC&DM V25.2 is complete and all reports are finished. This delivery includes telemetry (TLM), command (CMD) and the Distributed Object Manager (DOM). A Delivery Coordination Meeting (DCM) for installation has been held. The plan is to install on the SUNs first and then proceed with HPs.
Invitations have gone out for two upcoming educator workshops: "Millennium Flyby Science" and "Radio Astronomy at Jupiter". Registration will continue for both workshops through Friday 6 October 2000. It is anticipated that both will be full prior to that date. More information may be obtained via the Cassini Educator Hotline at (818) 393-5683 or an e-mail sent to Cassini.Edu@jpl.nasa.gov.
The "Millennium Flyby Travel Guide" has been released by Document Review and will be ready for web posting and printing later this month. The Travel Guide will be available on the Cassini Millennium Flyby web site at http://www.jpl.nasa.gov/cassini .