ISS MER Daily Report | |||||
Date: 12/03/00 | STS 97/ISS 4A | GMT: 337:10:00 To GMT: 338:10:00 (4:00 a.m. 12-02-00 to 4:00 a.m. 12-03-00) | |||
OVERALL SYSTEM STATUS: All ISS systems are in nominal flight/stage configuration with the exception of the following:
Previously Reported Status
| |||||
Last 24 Hours Status
| |||||
SIGNIFICANT EVENTS SCHEDULED FOR THE NEXT 24 HOURS: | |||||
Open Chits | |||||
Number (ISS) | Response Due (GMT) | Summary of Progress (OPEN ISSMER CHITS — LATE ISSMER CHITS — NON ISSMER CHITS)Chits without further MER Input required Chits that require MER Manager Action! | |||
The following chits are all in Mission STS-092_3A | |||||
ISS0123 | 2000/325:12:00 | IPRUSSIA to ISSMER, MOD "USOS EPS Functions Data" MER response entered. | |||
ISS0128 | 2000/323:20:00 | MOD to ISSMER, IMC "Launch Restraint Bolt Requirements" MER Response entered. However check with S&M they are having some concern regarding possible bolt breakage. Waiting on more more data item. Should have during shift 2, 12/3. | |||
ISS0137 | 2000/329:18:00 | MOD to IPRUSSIA "Integrated Early OPS Caution & Warning (C&W) Checkout Procedure" | |||
TI0012 | 2000/299:20:00 | ISSMER to IPRUSSIA – "FGB Battery 1 and 6 cycling" Faxed to MER-M for review. Safety has concurred. 10/17 – Data was given to Mr. Swartzman showing FGB Battery 1&6 in cycle mode at the same time. He will pass along to Gary Koronov. Asked PHONEIX what we need to do on this T-chit. Considering asking the questions through MER-M. | |||
The following chits are all in Mission STS-097_4A | |||||
ISS0001 | 2000/327:00:00 | IPRUSSIA to ISSMER, MOD – "Flight 4A Power Requirements" VIPER power resources /Kevin Brewer made comments and concurred with response. Awaiting Russia response | |||
ISS0003 | 2000/329:00:00 | MOD to ISSMER 760XD Laptop with OCA Docking Station C&DH thinks OPS plan may be wanting to WD this chit since the OCA is being replaced. C&DH response provided. Waiting on call from Span on whether chit will be withdrawn. | |||
ISS0005 | 2000/335:23:00 | IPRUSSIA to IMC, ISSMER, MOD "Additional Cargo Stowage Zones in FGB" L&M response provided, VI also reviewing. IMC has the lead on this chit. “Being worked at Mgmt level” IMC to provide better status mid-morning 12/3 | |||
ISS0006 | 2000/334:18:00 | ISSMER to IPRUSSIA, MOD "Hazard Controls For Khladon Refrigerant Release During CKB-2 Installation". MER-M following up. | |||
STS0007 | 2000/332:22:00 | MOD to ISSMER "TVIS Card Anomaly" Response provided by CheCS. | |||
ISS0013 | 2000/335:14:00 | ISSMER to IPRUSSIA, MOD, IMC "Update to Yellow Tag List Items to be removed"Past due | |||
ISS0015 | 2000/335:23:00 | IPRUSSIA to IMC, ISSMER, MOD "Equipment of 16 Empty Stowage Zones in FGB with Protective Barriers" L&M has reviewed and responded. S&MA wants to wait for IMC. Safety to dig up Hazard Report and Fax referenced in the chit. Fax will be available Monday. | |||
ISS0016 | 2000/342:00:00 | IMC to IPRUSSIA, ISSMER, MOD "ISS OCA R&R and Checkout" – C&DH is working it | |||
ISS0018 | 2000/337:00:00 | MOD to IPRUSSIA "Verification of Russian Segment C&W System Status During Crew Sleep" | |||
ISS0020 | 2000/336:22:00 | ISSMER to MOD "Information Request for RS1 Laptop Computer" | |||
ISS0023 | 2001/010:00:00 | MOD to ISSMER "5A Lab Activation Commands from Scratch need Verification" C&DH working | |||
ISS0024 | 2001/010:00:00 | MOD to ISSMER "5A GNC Bus Switch Commands from Scratch" C&DH working | |||
ISS0028 | 2000/336:20:00 | MOD to CSR, IMC, IPRUSSIA, ISSMER "Proposed Sequence for Early Node 1 Ingress as Performed by ISS Crew on Shuttle FD" MER Response Provided | |||
ISS0029 | 2000/340:21:00 | IMC to IPRUSSIA, ISSMER, MOD "SAFER Transfer and Stowage During 4A" ISS MER Response provided. | |||
ISS0030 | 2000/336:24:00 | MOD to ISSMER "Operation of TVIS without proper Activation/Checkout" – EV&CS has provided response. | |||
ISS0031 | 2000/340:00:00 | ISSMER to MOD "Modification to BCDU and DDCU Remove/Stow contingency procedures" | |||
ISS0036 | 2000/339:00:00 | MOD to IMC "Surface Microbial Sampling during 4A" | |||
ISS0038 | 2000/338:00:00 | IMC to ISSMER, MOD "BGA Latch Flight Rule" Response is in & signed off. | |||
ISS0039 | 2000/338:00:00 | IMC to ISSMER, MOD "RTAS Bolt Flight Rules" – waiting for safety to sign off. | |||
ISS0042 | 2000/337:00:00 | IMC to CSR, ISSMER, MER, MOD "Real-time Flight Rule Change: Management of Partially Deployed radiator" Signed without STAR response. STAR is reviewing. | |||
ISS0043 | 2000/337:00:00 | IMC to CSR, ISSMER, MER, and MOD "Real-time Flight Rule Change: SAW Jettison Requirements" Signed without STAR response. STAR is reviewing.. | |||
ISS0044 | 2000/337:00:00 | IMC to CSR, ISSMER, MOD "Change to IDRD Requirements: Deletion of Starboard Radiator Preps" Response is in & ready to go. Note TDF deleted SWIS request if we want to make a new request, we need to open a new chit. | |||
ISS0046 | 2000/337:01:00 | MOD to CSR, IMC, ISSMER, MER "STS-97 Initial Transfer List" Response is in, ready to go | |||
ISS0051 | 2000/340:22:00 | ISSMER to MOD- "Release of Station Program Notes" | |||
ISS0052 | 2000/337:19:57 | ISSMER to IMC, MOD- "Use of 4-40 steel washers in clamp & Bracket Kit" | |||
ISS0054 | 2000/337:12:00 | IMC to ISSMER, MOD "Real-Time Flight Rule Change:Non-Standard Stowage in PMA3" VI working to coordinate responses. Still in work, there seems to be conflicting responses. Need to get everyone on the same page | |||
ISS0055 | 2000/339:00:00 | IMC to CSR, ISSMER, MOD "Relocate Gap Spanner During EVA" MER Response Complete. | |||
ISS0056 | 2000/340:00:00 | IMC to CSR, IPRUSSIA, ISSMER, MER, MOD "4A Transfer Return Manifest Update" Was assigned to L&M | |||
ISS0057 | 2000/338:00:00 | ISSMER to MOD "Position EETCS to full bypass position prior to pump start" Response is in and STAR is reviewing | |||
ISS0058 | 2000/338:00:00 | ISSMER to MOD "Modify P6 Battery Cell Pressure FEP Offset" | |||
ISS0060 | 2000/337:18:00 | IMC to ISSMER, MER, MOD "Clarification on when to relocate WIS Antennas." ISS MER has responded. | |||
ISS0061 | 2000/338:12:00 | ISSMER to MOD "PCU Low Temperature FDIR Inhibit" | |||
ISS0063 | 2000/338:12:00 | MOD to ISSMER, IPRUSSIA "SM Caution and Warning Tone annunciation question" ISSMER has responded. | |||
ISS0064 | 2000/341:16:00 | MOD to IPRUSSIA, ISSMER "Extend OCA Capability to Russian Segment Post 4A" Assigned to C&DH | |||
ISS0066 | 2000/339:12:00 | ISSMER to MOD "Incorrect ARCU Power Feed Identification" | |||
ISS0067 | 2000/339:16:00 | ISSMER to MOD – “Recently opened or revised SPNs and PRs” | |||
ISS0070 | 2000/338:21:00 | Real time flight rule change 4A_2C-66 Partially Deployed Constraints VI coordinating response | |||
ISS0071 | 2000/338:15:00 | Real time flight rule change 4A_2C-66 Partially Deployed Radiator Jettison Requirements – PHOENIX and STAR have responded. VI Coordinating response | |||
ISS0072 | 2000/340:03:00 | ISSMER to MOD – “EETCS PFCS powerup post P6 install” | |||
ISS0073 | 2000:338:21:00 | IMC to CSR, ISSMER, MOD – “Real Time Flight Rule Change – 4A_2C-69 Updates” – VI to lead coordination. Chit opened with MER instead of ISMER. Span to call in help to change over to ISSMER about 7a 12/3. Cannot type in responses until change is made. | |||
ISS0074 | 2000/341:20:00 | ISSMER to IPRUSSIA, MOD – “ARCU H Jumper Activiation Procedure Redline” | |||
ISS0075 | 2000/340:00:00 | IMC to MOD, ISSMER "Change to EVA3 Timeline" Assigned to EV&CS | |||
TI0043 | 2000/337:12:00 | ISSMER to MOD "O2 Addition to Russian Segment Atmosphere" Needs to address the possibility of the US O2 levels exceeding their limits when the two volumes are combined | |||
TI0060 | 2000/344:21:11 | ISSMER to MOD "FD3 Hardware Installation Verification" OSO says that they dont have access to the serial numbers requested in the chit & would have to call the crew to get them. CM needs to talk to OSO to either withdraw this chit or help OSO understand the importance of this information. | |||
TI0077 | 2000/341:20:00 | IMC to CSR, IPRUSSIA, ISSMER, MER, MOD – “SAFER Transfer and Stowage During 4A (Update)” | |||
TI0083 | 2000/340 | ISSMER to IPRUSSIA, MOD – “ARCU cable connector protection” – Safety looking to confirm what other than the connector caps is acceptable. Will have respsonse by 8a Dec 3. | |||
TI0084 | 2000/340:12:00 | ISSMER to IMC, MER, MOD "Refill of empty CWC" Waiting for GO from MERLIN to Open. |
Closed Chits | |||
Number (ISS) | Response Due (GMT) | Summary of Progress
| |
3A-ISS0104 | 2000/312:12:00 | MOD to IPRUSSIA "Joint Russian/US Power Management Plan" | |
3A-STS0134 | 2000/326:00:00 | MOD to ISSMER "ISS CheCS Acoustic Hardware Failure" | |
ISS0002 | 2000/332:18:00 | IMC to IPRUSSIA, MOD "New 2R Stage Task in Preparation for 4A" | |
ISS0011 | 2000/332:20:00 | MOD to ISSMER "ISS Printer Troubleshooting" Response provided by C&DH. Withdrawn | |
ISS0025 | 2000/336:16:00 | ISSMER to MOD "Request to Update and Switch to NCS Core Avionics APID Table 2 fdor 4A" | |
ISS0032 | 2000/337:18:00 | ISSMER to MOD "EVA Install Protective Covers on P607 and P608" | |
ISS0040 | 2000/339:00:00 | MOD to ISSMER "BCDU LOC Setpoint Htr On/Off Command Values" | |
ISS0041 | 2000/338:12:00 | MOD to ISSMER "PCU Management Plan for Flight 4A" | |
ISS0050 | 2000/338:12:00 | MOD to IPRUSSIA- "SM Caution and Warning Tone Annunciation Questions". – Withdrawn | |
ISS0059 | 2000/337:03:30 | ISSMER to MOD "PMA3 Ingress Warm-Up" | |
ISS0049 | 2000/337:14:00 | MOD to ISSMER "Update on Launch To Activation Flight Rule. | |
ISS0034 | 2000/338:00:00 | MOD to ISSMER "TCS EETCS PPL Uploads and FEP Cal Curve Adjustment" | |
ISS0017 | 2000/337:23:00 | ISSMER to MOD "Fluid QD EVA procedure update" | |
ISS0027 | 2000/338:00:00 | MOD to ISSMER "BCDU Existence Table PPLs Required" | |
ISS0048 | 2000/337:18:00 | IPRUSSIA to ISSMER, MOD-"Proposed 4A/ISS Power Balance Modeling" | |
ISS0068 | 2000/337:04:00 | Mast Canister Thermal Blanket Re-installation procedure | |
Open Items for Investigation (IFIs) | |||
Number | Title/Summary | ||
154 | FGB Batteries 1 and 6 Cycling Simultaneously | ||
155 | SM Battery 6 Unexpected Cycle Mode | ||
156 | SMCC/SMTC Lane Drops | ||
169 | EVA Ziptie Failure | ||
170 | PCU Tubes never reached temp when heaters active. | ||
171 | SM Battery 4 Cycling when battery 6 commanded | ||
172 | SM Condensate Heat Exchanger Fan Failed | ||
173 | Mast Canister MLI Loose |
Closed Items for Investigation (IFIs) | |