Today: US Extravehicular Activity (EVA) #40: EV1 Kimbrough and EV2 Pesquet completed the following tasks during today’s 6 hour 34 minute External (EXT) Enhanced Processor and Integrated Communications (EPIC) Special Purpose Dexterous Manipulator (SPDM) Lube EVA. FE-6 Whitson provided Intravehicular (IV) Space Station Remote Manipulator System (SSRMS) support.

Planned EVA Tasks Completed

External Thermal Control System (ETCS) Leak Inspection
Nadir EXT EPIC Multiplexer/Demultiplexer (MDM) R&R
Pressurized Mating Adapter (PMA)3 Disconnect
SPDM Latching End Effector (LEE) Lube
Japanese Experiment Module Remote Manipulator System (JEMRMS) WVE R&R
JEM Exposed Facility (EF) Foward Vision Equipment (VE) R&R
Get-ahead Task Completed

S1-1 Crew and Equipment Translation Aid (CETA) Light R&R
EPIC EXT MDM: The Flight Control Team transitioned the newly installed EPIC EXT MDM to primary and completed critical checkout.

JEM Camera Checkouts: Both of the new JEM cameras, JEMRMS WVE and JEM EF Forward VE, were successfully checked out by ground controllers.

Mobile Servicing System (MSS) Operations: The Robotics Ground Controllers powered up the MSS in support of US EVA #40, during which the EVA crew lubricated mechanisms in the SPDM LEE. Post EVA, the Ground Control team checked out the newly lubricated mechanisms and then stowed the SPDM on the Mobile Base System (MBS) Power Data and Grapple Fixture (PDGF) 2. Later tonight, the team will continue to walk the SSRMS to MBS PDGF 4. MSS performance was nominal.

Today’s Planned Activities
All activities were completed unless otherwise noted.

Preparation of Reports for Roscosmos Web Site and Social Media
URAGAN. Observation and photography
EKON-M. Observations and photography
NEUROIMMUNITET. Saliva sample collection
ISS HAM Radio Power down
EVA COTS UHF Communication Unit (CUCU) Verify off
USOS Window Shutter Close
Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
Comm configuration for EVA
Closing SM Window Shutters 6, 8, 8, 9, 12, 13,14 / Note 10
CARDIOVECTOR. Experiment Session
Changeout of Replaceable Condensate Removal Lines [????]
VIZIR. Experiment set up and start using ???? P/L.
Extravehicular Mobility Unit (EMU) Purge
Replacing ???-3 Smoke Detectors in FGB
CARDIOVECTOR. Experiment Session
Prebreathe in EMU
Crewlock Depress
Crewlock Post Depress
Crewlock Egress
EPIC MDM Remove and Replace
Radiator Beam Valve Module (RBVM) Inspection
Changeout of Replaceable Condensate Removal Lines [????]
VIZIR. ???? Closeout Ops
Replacing ???-3 Smoke Detectors in FGB
PMA3 Disconnect
SSRMS EVA-40 Support
Special Purpose Dexterous Manipulator (SPDM) Latching End Effector (LEE) Lube
JEM RMS Wrist Vision Equipment (WVE) R&R
Vacuum Cleaning of ??1 and ??2 air ducts in MRM2
Dust Filter Replacement and ?1, ?2 Fan Grille Cleaning in DC1
INTERACTION-2. Experiment Ops
JEM Exposed Facility (EF) Foward Vision Equipment (VE) R&R
Life On The Station Photo and Video
EVA Get Ahead Tasks
Crewlock Ingress
Evening Preparation Work
EVA Glove Photo Setup
Crewlock Repress
Extra Vehicular Activity (EVA) Post-EVA Activities
Return to nominal comm configuration after USOS EVA
URISYS Hardware Setup
EVA Glove Photo Downlink
Photo/TV EVA Camera Disassembly
Photo/TV EVA GoPro Downlink
Metal Oxide (METOX) Regeneration Initiation

Completed Task List Items
Manufacturing Device Print Removal, Clean and Stow

Ground Activities
All activities were completed unless otherwise noted.
EVA Support

Three-Day Look Ahead:
Saturday, 03/25: Crew half off duty, EMU water recharge, EVA debrief, Fluid Shifts h/w gather
Sunday, 03/26: Crew off duty, N2 CBCS powerup, PMA3 Relocate
Monday, 03/27: Fluid Shifts, N2Z CBCS remove/stow, EVA #41 procedures review/tool config, SSK/MAS analysis of surface slides & petri dishes

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Operate
Major Constituent Analyzer (MCA) Node 3 – Standby
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – ReProcess
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 -Full Up