NASA Space Station On-Orbit Status 17 November 2020 – Russian Spacewalk on Tap

By Marc Boucher
Status Report
November 18, 2020
Filed under , ,
NASA Space Station On-Orbit Status 17 November 2020 – Russian Spacewalk on Tap
The four Commercial Crew astronauts (front row from left) Shannon Walker, Victor Glover, Michael Hopkins and Soichi Noguchi are welcomed aboard the station. In the back row from left are, NASA astronaut Kate Rubins and cosmonauts Sergey Ryzhikov and Sergey Kud-Sverchkov. Credit: NASA.
NASA

The Expedition 64 crew expanded to seven members overnight after four Commercial Crew astronauts docked the SpaceX Crew Dragon to the International Space Station.
Now two cosmonauts are gearing up for a spacewalk set to start Wednesday at 9:30 a.m. EST.

The newest station crew members are asleep today following a 27-hour-and-half trip from NASA’s Kennedy Space Center to the Harmony module’s forward-facing port. Commander Michael Hopkins and Pilot Victor Glover, alongside Mission Specialists Shannon Walker and Soichi Noguchi, docked on Monday at 11:01 p.m. The hatches were opened two hours later, and the quartet entered the station to begin a six-month research mission.

All seven crewmembers gathered in the Harmony module for a welcoming ceremony and congratulations from NASA and JAXA (Japan Aerospace Exploration Agency) mission officials. Afterward, safety briefings were given to the new quartet showing potential lab hazards, emergency equipment locations and escape routes.

This is the first long-duration crew comprised of seven members in space station history. The station has hosted up to 13 visitors before but only for a few days at a time during crew swap operations.

Today, NASA Flight Engineer Kate Rubins helped Commander Sergey Ryzhikov and Flight Engineer Sergey Kud-Sverchkov get ready for their first spacewalk. The Russian duo will spend about five-and-a-half hours servicing external station hardware and science experiments. Their prime task will be to prepare the station’s Russian segment for the new Nauka multipurpose laboratory module due to arrive in 2021.

NASA TV coverage of the spacewalk will begin Wednesday at 8:30 a.m. This will be the first spacewalk for the duo and the first spacewalk staged from the Poisk module. The Pirs docking compartment is being decommissioned to make room for the Nauka module.

On-Orbit Status Report

SpaceX Crew-1 Docking: Resilience successfully docked to the ISS on November 16th at 10:02 PM CT, completing the approximately 27-hour rendezvous to station. The Node 2 hatch was then opened shortly after midnight. With the docking of Resilience, Mike Hopkins, Victor Glover, Soichi Noguchi, and Shannon Walker join the ISS crew complement.

Payloads

Actiwatch Don: Several members of the arriving Crew-1 crew donned an Actiwatch-Plus on their non-dominant wrist outside of any clothing. The Actiwatch is a waterproof, nonintrusive, sleep-wake activity monitor worn on the wrist of a crewmember. The device contains a miniature uniaxial accelerometer that produces a signal as the subject moves. The data are stored in nonvolatile memory within the Actiwatch until they are downloaded for analysis.

ELF Tether Removal: The crew removed a sample cartridge tether which is believed to have been causing issues with successful processing of the ELF Round Robin samples. The Round Robin – Thermophysical Property Measurement (Round Robin) investigation provides researchers with a better understanding of how to measure liquid metal properties to revolutionize how process modeling can support design, flight qualification and production of advanced spaceflight systems.

Systems

Post-Docking Operations: The crew completed several activities after Resilience docked to the ISS. The crew relocated Space Station Computers (SSCs) which were used during the Dragon approach monitoring from the Cupola to the Lab. The resident ISS crew helped to familiarize the newly arrived crew of potential hazards and the available safety measures on-board ISS by performing a safety briefing. Finally, the crew performed an initial day US Segment handover to begin familiarizing the crew with living and working on ISS.

Battery Stowage Assembly (BSA) Operation Re-Initiation: The crew re-initiated automated Charge-Discharge-Charge (C-D-C) BSA battery operations on Battery Charger-3 (BC3) after a zero current charge error was seen on REBA 1016 during yesterday’s charging attempt. The charging is typically terminated 3 days after this activity as C-D-C maintenance may take up to 65 hours to complete.

T2 Troubleshooting: After the ground powered on the T2 rack, the crew verified the T2 rack status, re-installed the emergency stop magnet, and then re-verified the T2 rack status. This activity returned T2 to a nominal configuration and the equipment will be operable after the ground completes the activation and checkout tomorrow.

Completed Task List Activities:

None
Today’s Ground Activities:
All activities are complete unless otherwise noted.

C2V2 Configuration for Dragon Approach
Primary Power System (PPS) Beta Gimbal Assembly (BGA) Commanding for Docking
Attitude Control System (ACS) Commanding for Docking
Thermal Control System (TCS) Commanding for Docking
Dragon Configuration for Docked Operations on Node 2 Forward
Look Ahead Plan

Wednesday, 11/18 (GMT 323)
Payloads:

GRIP
ISS Experience Stow
LSR Spare Relocate
POLAR/MELFI Transfer
SERFE
Systems:

IFM Hatch Seal Inspection
RS EVA #47 Help
THC IMV Flow Measure
Emergency Equipment Transfer
Cygnus OBT
Thursday, 11/19 (GMT 324)
Payloads:

Avatar-X
AWP
CBEF-L Current Measurements
Drop Vibration
EXPRESS Rack 2 Laptop t/s
Food Acceptability
GRIP
MSRR/MSL SCA Exchange
Standard Measures
T-CMM
Vection
Systems:

Dragon Debrief Conference
Dragon Cargo Transfer
EVA Tool Transfer
Friday, 11/20 (GMT 325)
Payloads:

Avatar-X
CBEF-L Config Change
ESA/LSR Pre-gather and Maintenance
FIR/LMM/ACE Module Exchange
Food Acceptability
Food Physiology
GRIP
Plant Habitat-02
POLAR Desiccant Swap
Refabricator Stow
SERFE/MCD
STaARS BS12
Standard Measures
T-CMM
Tangolab-2 Cardcube Install
Systems:

EHS CSA-CP Activation and Checkout Part 1
APM Node 3 Install
EVA Tool Stow
EVA BSA Battery Operations Terminate
EVA BSA Battery Operations Initiate
RGN Recycle Tank Drain
RGN Recycle Tank Fill
UTS Offload EDV Swap
RGN Recycle Tank Process
Today’s Planned Activities:
All activities are complete unless otherwise noted.

Node 2 to Dragon Final Pressurization and Vestibule prep for Ingress
Dragon Hatch Open
Dragon Forward Hatch Open
Public Affairs Office Welcome Event for Crew Dragon
Dragon Node2 Forward Systems Operations Data File (SODF) Deploy
Dragon Forward – Station Support Computer Return
Actiwatch Plus Watch Don
Gather and transfer ISS Leak Kit materials.
Urine Transfer System Offload EDV Troubleshoot
Dragon Forward Docking Kit Stow
Prep Sleep Station in Dragon
Battery Stowage Assembly (BSA) Operation Re-Initiation
Recharging external accumulator SM-AGAT-U55 – initiation
ISS Safety Briefing
Handover of Increment 64 Crew
Drink Bag Fill and Install in Orlan
Reminder to Clear IMV Inlet
Study EVA timeline
REMOTE RS LAPTOP testing
??? and ??? MNT before EVA
XF305 Camcorder Setup
Electrostatic Levitation Furnace(ELF) Tether Removal
ISS Experience Record Conclude
ISS Experience Hardware Relocate
??????? ????? ??????????????? ? ??? – ????????? ???????? ?? ??????? ?????????. ?????. ?? ????.
???????? ???????????? ???????????????? (2 ??.) ?? ?? ??? ?? ????? ??? ??
PELLE. Download & placement before EVA
Restow ISS Leak Kit tools.
Recharging external accumulator SM-AGAT-U55 – end
????. ????? ????-?????? ? ??????? ???????????? ?????????? ? ????????? ????????? (????? ???)
Biochemical urine test
GRIP experiment constraints reminder