Space Stations

NASA ISS On-Orbit Status 29 July 2014

By Marc Boucher
Status Report
August 4, 2014
Filed under , ,
NASA ISS On-Orbit Status 29 July 2014
NASA ISS On-Orbit Status 29 July 2014
NASA

Today: Automated Transfer Vehicle (ATV)-5 Launch: ATV-5 George Lemaitre launched today at 6:47pm CDT from Kourou, French Guiana.
Ascent was nominal. Solar array and antenna deployment occurred on schedule. The cargo vehicle is scheduled to dock to the ISS Service Module aft port on August 12.

Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-6 Gerst conducted flame tests for the BASS-II investigation which examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. Today, three tests were completed using rods; two tests were completed using opposed airflow and one with concurrent flow. The experiment will guide strategies for materials flammability screening for use in spacecraft as well as provide valuable data on solid fuel burning behavior in microgravity. BASS-II results contribute to the combustion computational models used in the design of fire detection and suppression systems in microgravity and on Earth.

Force Shoes: Gerst conducted an Advanced Resistive Exercise Device (ARED) exercise session using the Force Shoes. The data from the ARED exercise session will be used to measure the loads experienced during ARED exercise.

Cell Biology Experiment Facility (CBEF) Maintenance: Commander (CDR) Swanson conducted periodic CBEF maintenance by removing two Plant Experiment Units (PEUs) and one Measurement Experiment Unit (MEU) B from the CBEF incubator micro-gravity unit.

European Modular Cultivation System (EMCS) Rotor Based Life Support System (RBLSS) Module Replacement: Swanson replaced one RBLSS module on Rotor A and cleaned the rotors for belt debris. He also replaced the Gas Removal Module and installed three water pump tubes on the EMCS RBLSS. These activities are in preparation Seedling Growth-2, a joint NASA-European Space Agency (ESA) investigation, that will be delivered on SpX-4.

Extravehicular Mobility Unit (EMU) Maintenance: Swanson and Wiseman continued yesterday’s EMU maintenance activities. Today they performed loop scrub and Sublimator Flange Inspection on EMUs 3003 and 3010. Tomorrow they will perform water conductivity measurements on EMUs 3005 and 3011 and prepare the Airlock to support EVA operations.

Today’s Planned Tasks

RSS1, 2, Reboot / r/g 1009 [Complete]
Laptop RS1(2) Reboot [Complete]
SM ??? (Caution & Warning Panel) [Complete]
Daily Planning Conference (S-band) [Complete]
Inspection of ??-? connector on ???-?? separator pump behind ??? panel 139. [Complete]
Hematocrit Test [Complete]
Hematocrit. Hardware Stowage [Complete]
MSG – Visual inspection and activation [Complete]
CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
FMK Deployment Ops [Complete]
CBEF – Removing PEU (two) and MEU from Incubator Unit [Complete]
ASEPTIC. Glovebox Power On and Start Sterilization. r/g 6232 [Complete]
???-? Replacement r/g 6237 [In work]
??? 423 (DC1) Transfers and IMS Ops / ??? 423 Transfers (???) + r/g 6203 [Complete]
BASS Operations Preparation [Complete]
CBEF – Removing PEU (two) from Incubator Unit [Complete]
FGB Dust Collector ??1, ??2 Filter Replacement [Complete]
CIR – Hardware Setup [Complete]
EMCS – Module Transfer [Complete]
FSHOES – Experiment Ops [Complete]
EMU – Water Mix [Complete]
ASEPTIC Repositioning Equipment in the Box / r/g 6232 [Complete]
On MCC Go Mating ???-? telemetry connector to FE??2-12 r/g 6237 [Complete]
ASEPTIC. Photo of Medium before the experiment / r/g 6232 [Complete]
???-? Replacement – Close-out ops r/g 6237 [Complete]
EMU Water Refill [Complete]
EMCS – Module Transfer [Complete]
MOTOCARD. Experiment Ops r/g 6235 [Complete]
EMU – Cooling Loop Mix [Complete]
Grab Sample Container (GSC) Sampling Operations [Complete]
EMU Coolant Sampling [Complete]
MOTOCARD. Assistance in the Experiment / r/g 6236 [Complete]
ASEPTIC. Disable Sterilization. r/g 6232 [Complete]
ASEPTIC. Setup in Glovebox. r/g 6232 [Complete]
ASEPTIC. Surface and Air Samples Collection after Sterilization r/g 6232 [Complete]
??? 423 (DC1) Transfers and IMS Ops / ??? 43 Transfers + r/g 6203 [Complete]
EMU Cooling Loop Maintenance, Part 1 [Complete]
BASS – Test Ops [Complete]
ASEPTIC Photo Edit and Downlink / r/g 6232 [Complete]
IVA – Exercise Clothes Survey [Complete]
EMCS – Water Pump Tube Installation [Complete]
EMU – DCM Flow Test [Complete]
PAO hardware setup in Columbus [Complete]
Crew Prep for PAO [Complete]
PAO Event [Complete]
IVA – Everyday Clothes Survey / USOS procedures [Complete]
Dried Clothes Stowage [Complete]
EMU – Water sampling [Complete]
EMU – DCM Flow Test [Complete]
HAM Radio Session [Complete]
On MCC GO Elektron-VM Purge After Activation / ???? [Complete]
IVA – Everyday Clothes Survey / USOS procedures [Complete]
??-1 Flow Sensor Position Check [Complete]
EMU Cooling Loop Maintenance, Part 2 [Complete]
Video Footage of Greetings / r/g 6234 [Complete]
EMU – DCM Flow Test [Complete]
ASEPTIC. Monitoring Pump Automatic Shut off. r/g 6232 [Complete]
Cleaning FGB ??? Detachable Screens 1, 2, 3 r/g 6203 [Complete]
EVA – Sublimator Flange Inspection [Complete]
ASEPTIC. Preparation and Start of Air Sampling / r/g 6232 [Complete]
BASS Closeout Ops [Complete]
IMS Delta File Prep [Complete]
Dried Clothes Stowage / USOS procedures [Complete]
IVA – Exercise Clothes Survey / USOS procedures [Complete]
EMU Cooling Loop Maintenance, Part 3 [Complete]
VZAIMODEISTVIYE Experiment Ops / r/g 5895 [Complete]
JRNL – Journal Entry [Complete]
ASEPTIC. Monitoring Pump Automatic Shut off. r/g 6232 [Complete]
IVA – Routine Clothes Survey [Complete]
Dried Clothes Stowage / USOS procedures [Complete]
IVA – Exercise Clothes Survey / USOS procedures [Complete]
Daily Planning Conference (S-band) [Complete]
ASEPTIC. Retrieving samples from box and placing in thermostat. [Complete]
CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
MSG – Glovebox Down [Complete]
Health Maintenance System (HMS) – Food Rations Photography [Complete]
ASEPTIC. Glovebox Closeout Ops. r/g 6232 [Complete]
JPM Window Shutter Closure [Complete]
Task List

ARED Cylinder Evac
WHC KTO replace
WHC-???-? R&R
Roscosmos Report
Uragan photo
3DA1 cam ops
ARED detent flip
CMS skid tape audit
CSA CP taping
EVA A/L unstow
J-RTN item relocate parts 1, 2
Recycle tank drain init
Recycle tank drain terminate
US EVA 28 review
SSCV5 USB card reader
Cygnus transfer cargo ops
56P unpack
Ground

Nominal commanding
Three-Day Look Ahead:

Wednesday, 07/30: BASS, HRF1 RIC software load, Cygnus cargo ops
Thursday, 07/31: PMA2 ingress/cargo ops, BASS, Ultrasound, EPO Marangoni
Friday, 08/01: Z1 ingress/cargo ops, BASS, EVA tool gather, EMU On-orbit Fitcheck
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Norm
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.