NASA ISS On-Orbit Status 29 December 2014

By Marc Boucher
Status Report
December 30, 2014
Filed under , ,
NASA ISS On-Orbit Status 29 December 2014
Birthday wishes to Space Station Commander Wilmore.
NASA

Today: Ocular Health Tonometry Test: Virts took his blood pressure, then Cristoforetti, acting as the Crew Medical Officer (CMO), performed a tonometry test of Virts as part of a regular series of tests for Ocular Health.
Additional eye examinations of Virts will be performed over the next two days. The Ocular Health protocol is a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment / intracranial pressure changes in ISS crewmembers. Researchers believe the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post flight recovery will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines.

Advanced Resistive Exercise Device (ARED) Cable Replacement: The crew has been operating with one of two ARED cables disengaged. Today, Wilmore removed the disengaged left Upper Stop Cable, straightened and repaired a previously used spare upper stop cable and installed the newly repaired cable. With this installation the crew will be able to resume ARED operations at higher loads.

Controller Panel Assembly (CPA) “Dog Ear” Modification: In the future, Pressurized Mating Adapter (PMA)-3 will be relocated from the Node 3 Port location to Node 2 Zenith. Due to interference with the Center Disk Cover attachment bracket at Node 3 Port, any CPA installed at this location requires a metal tab “dog ear” to be cut off in order to ensure proper clearance. Today, Cristoforetti and Virts completed this CPA modification for use during the upcoming PMA-3 relocation.

Today’s Planned Activities
All activities were completed unless otherwise noted.

Inspection of ??-? connector on ???-?? separator pump in ??? behind panel 139 and line 5182-03 from Pretreat and Water Dispenser (????) to ??? in its transparent section
Body Mass Measurements
HMS Visual Testing Activity
Verifying Switchover of 1553 Buses on ???1, Preparation
HAP1 Preparation
Elite-S2 – IMU Activation
Health Maintenance System (HMS) – Vision Questionnaire
Ocular Health (OH) Blood Pressure Operations
IMAX – Video of the experiment ops
OH – Ocular Health Tonometry Setup
TV conference – Russian Father Frost Greetings to the ISS Crew
OH – Ocular Health Tonometry Test
MRM2 comm config to support voice comm for the experiment
CARDIOVECTOR. Experiment Ops
Kulonovskiy Kristall Experiment Run
VIZIR. Experiment Ops
System Laptop Terminal (SLT) Reboot
IMAX – Video of the experiment ops
HRF materials stowage inventory
Replacement of LHA housing in JPM
MRM2 Comm Reconfig for Nominal Ops
WRS Water Sample Analysis
IMAX – Video of the experiment ops
Waste and Hygiene Compartment (WHS) Urine Receptacle and Insert Filter Changeout
IMS audit of ???? kits
On MCC GO Verification of Switchover of 1553 Buses on ???1
Changeout of cartridges in SM dust filters ??1-4.
BCAT – Historical Photography
Elite-S2 – IMU Deactivation
Copying EXPOSE-R P/L data from ???? to RSS1 (start)
ARS-LAB. Teardown of Jumper in Atmosphere Revitalization System (ARS) Lab Major Constituent Analyzer (MCA)
ARED – Rope Replacement
IFM – Controller Panel Assembly (CPA) Dog Ear Removal
Greetings Video
IFM – Controller Panel Assembly (CPA) Dog Ear Removal
PROBOY. RSE1 Station Laptop Activity
Inventory of docking and internal transfer system (????) kits
On MCC GO Verification of Switchover of 1553 Buses on ???1
URAGAN. Observation and Photography using VSS
Auxiliary Laptop Anti-Virus Update
IMS Delta File Prep
JRNL – Journal Entry
TOCA Data Recording
AMO – Hardware Test
Cleaning Nikon camera Charge-Coupled Device (CCD) Digital Image Sensor
Copying EXPOSE-R P/L data from ???? to RSS1 (terminate)
Autonomous Mission Operations (AMO) – TOCA Activity Planning
IMAX – familiarization
ESA Nutritional Assessment (ENA)
Completed Task List Items

ARED cylinder evac [Completed Saturday,Sunday]
Food cleanup part 2 [Completed Sunday]
Ground Activities
All activities were completed unless otherwise noted.

Nominal commanding
High Beta Angle configuration and battery over charging protection
Three-Day Look Ahead:

Tuesday, 12/30: OCT Exam, Fundoscope, CIR Manifold R&R, Astro Palate, EPO MissionX, EPO Biosys, EMU LLB Autocycle
Wednesday, 12/31: Ultrasound, CMO OBT, Cardiac, Wisenet install, ISERV h/w remove
Thursday, 01/01: Crew Holiday
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – Off
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Idle
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Normal
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up