Space Stations

NASA ISS On-Orbit Status 23 October 2014

By Marc Boucher
Status Report
October 24, 2014
Filed under , ,
NASA ISS On-Orbit Status 23 October 2014
One of the crew members aboard the International Space Station took this picture of Hurricane Gonzalo on Oct. 16, 2014. The storm made a direct hit on Bermuda the day after this picture was taken, as a powerful Category 2 storm, with winds estimated at 110 miles per hour. Two Russian spacecraft are seen docked to the orbital outpost on the left side of the image. Credit: NASA.
NASA

Today: Muscle Atrophy Resistive Exercise System (MARES): Gerst configured cabling, set up and activated the European Physiology Module (EPM) laptop in support of future MARES activities scheduled for later this year.
Ocular Health: Gerst conducted his Return minus 30 day Ocular Health tests. With Wiseman as the Crew Medical Officer (CMO) operator, the ultrasonic eye imaging was taken followed by an echocardiogram with guidance from the Ocular Health ground team. Ocular Health protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers. Researchers believe that the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post-flight recovery. Information gathered will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines.

Health Maintenance System (HMS) Ocular Health (OH): Wiseman and Gerst continued their Return-30 day OH sessions including ocular ultrasounds and an echocardiogram for Gerst.

SPRINT: The Crew set up the Ultrasound 2 equipment to support Wiseman’s Sprint Flight Day 150 session. The Ultrasound Muscle Volume Scan activities were performed with remote guidance from ground team. Integrated Resistance and Aerobic Training Study (Sprint) evaluates the use of high intensity, low volume exercise training to minimize loss of muscle, bone, and cardiovascular function in ISS crewmembers during long-duration missions.

Bilogical Rythyms 48 hrs: Wilmore relocated and performed a checkout of laptop computers in preparation for the JAXA Biorythyms 48 hour experiment. The objective of this study is to examine the accurate circadian variation of cardiac autonomic function in space flight. The crew will wear an Actiwatch for 96 hours and an electrocardiograph (ECG) for 48 hours. The crew conducts two in-flight data collections.

Russian Segment (RS) Extravehicular Activity (EVA) 40 Cleanup: Following yesterday’s long day due to the successful EVA, the crew wake time was delayed by 3.5 hours, resulting in a shortened duty day for the entire crew. Suraev and Samukutyaev performed post-EVA operations including suit drying, loop refilling, and post-EVA conferences.

Today’s Planned Activities

All activities completed unless otherwise noted.

PROK – Urine Sample Collection
BIOME – Survey Completion
Removal of US TV cameras, Lights, and REBA power unit from Orlan-MK Suits
СКПФ1 & СКПФ2 Dust Collector Filter Changeout
USND2 – Hardware Setup and Activation
ESA Weekly Crew Conference
MAR – Hardware prep and installation
Post EVA Orlan maintenance activities
SPRINT – Hardware prep and installation
ESA PAO Event
Cygnus PROX and НСР Power Activation
Urine Receptacle and Insert Filter Changeout in WHC
ИП-1 Flow Sensor Position Verification
MAR – Hardware Remove and Stow
Ultrasound 2 – Scanning
PROK – Diet Log Preparation
Switching from БИТС2-12 ЭА025М (ЗУ1Б) to ЭА025М (ЗУ1А) Device / r/g 6954
Post-EVA debrief. (S-band)
ISS HAM – HAM Radio Power up
HTV Hardware Command Panel (HCP) Checkout
CPCG-HM MERLIN 4 & 5 – Status Check
BIOME – Sampling Preparation
EXPOSE-R. Packing the protective cover / r/g 6958
Ocular Health (OH) – Cardiac Operations Operator
PAO Event
TEST. Packing Test Airtight Container / r/g 6959
·OH – Ocular Health Blood Pressure Operations Assistance
MDLT – Hardware Replacement
ELT2 – Closeout Ops
Start EMU Metox Regeneration
Completed Task List Items

WHC KTO Replace
Install EML Sample Chamber
Install EML Gas Filter and a Gas Purification Cartridge
Ground Activities
All activities completed unless otherwise noted.

CUCU Activation and Checkout
PROX Activation, Paramater Update, and String B Command Checkout
Three-Day Look Ahead:

Friday, 10/24: ZebraFish Muscle, Earth Rim Obs, Microbiome, Biolab rythms, BP Reg
Saturday, 10/25: SpaceX-4 Dragon Unberth and Release
Sunday, 10/26: Weekly Cleaning, Crew day off
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Normal
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.