NASA ISS On-Orbit Status 23 August 2013

By Marc Boucher
Status Report
August 26, 2013
Filed under , ,
NASA ISS On-Orbit Status 23 August 2013
NASA ISS On-Orbit Status 23 August 2013.
NASA

Post Russia Extravehicular Activity (EVA) 35 Status: Following yesterdays 5 hour and 58 minute EVA, the ISS Crew went to sleep an hour later than usual.
Today the entire crew woke up an hour late and the Russian crew had a half-duty day for the Russian crewmembers while the USOS crew works a shortened day.

Columbus Improved Payload Ethernet Hub Gateway (iPEHG)-A Install: Flight Engineer (FE)-5 Parmitano removed the Columbus Payload Ethernet Payload Ethernet Hub / Gateway (PEHG) and replaced it with a new, improved PEHG (iPEHG). The new IPEHG design corrects performance limitations often experienced by the older PEHG.

Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Remove and Replace: As part of nominal maintenance activities, FE-3 Cassidy removed and replaced the Regenerative ECLSS Tank.

Microbial Air Sampler (MAS) Kit and Surface Sample Kit (SSK) Sample Collection: FE-3 Cassidy and FE-5 Parmitano will be taking Air and Surface Samples to get a better understanding of microbial growth within the ISS modules. The samples will be analyzed on-orbit and results will be shared with ground specialists.

Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions (InSPACE)-3: FE-6 Nyberg will redistribute the particles in the vial assembly, activate InSPACE equipment, configure the Microgravity Science Glovebox (MSG) facility for downlink, and begin InSPACE 3 operations. InSPACE3 studies the behavior of magnetic colloidal fluids which transition to a solid-like state by the formation and cross-linking of microstructures in the presence of a magnetic field. This technology can be used for vibration damping systems and can improve the design of structures.

Mobile Servicing System (MSS) Status: Robotics Ground Controllers powered up the MSS and translated the Mobile Transporter (MT) from Worksite 4 to Worksite 6. Later today they will walk the Space Station Remote Manipulator System (SSRMS) off the Node 2 Power Data Grapple Fixture (PDGF) and onto Mobile Base System (MBS) PDGF1. Finally they will maneuver the SSRMS to pick up the Special Purpose Dexterous Manipulator (SPDM) in preparation for the start of H-II Transfer Vehicle (HTV) 4 Exposed Pallet (EP) SPDM operations on Saturday, August 24.

Today’s Planned Tasks

Regeneration of ??? ?1 Micropurification Cartridge (start) [Complete]
MSG – Visual inspection and activation [Complete]
ISS Crew and ???? (RSA Flight Control Team Management) Weekly Conference [Complete]
RGN – Changeout of Recycle Tank [Complete]
Installation IPEHG [Complete]
Drying Orlan-MK Water Feed Line [Complete]
INSP3 – Start experiment ops [Complete]
???-ATV Interface Leak Check [Complete]
Orlan-MK Drying [Complete]
Post-EVA Orlan Debrief With Specialists [Complete]
WSTA Fill [Complete]
???-?? Hatch Opening [Complete]
ATV-?? Hatch Opening [Complete]
EMU Water Refill [Complete]
Post-EVA Pille Dosimeter Reading [Complete]
Installation of Quick Release Screw Clamps on SM Aft side, Configuring ATV-4 Life Support System to IVA Mode [Complete]
Post-EVA Medical Kits Restow [Complete]
ATV Deactivation after EVA [Complete]
Microbial Air Sampler (MAS) Kit Sample Collection [Complete]
Camcorder setup to capture T2 exercise [Complete]
Orlan-MK Drying [Complete]
INSP3 – Closeout Ops [Complete]
INSP3 – Start experiment ops [Complete]
Food Frequency Questionnaire [Complete]
HMS Defibrillator Inspection [Complete]
Orlan-MK Drying [Complete]
???? Service Data Dump from ???? (Payload Server) via RSS1 [Complete]
Urine Transfer to ATV Tank [Complete]
IMS and Stowage Conference [Complete]
Orlan Feedwater Bladder Refill [Complete]
HRF – SALIVA Hardware Setup [Complete]
Combustion Integrated Rack (CIR) Rack Door and Temperature Check [Complete]
RGN – Remove depress hose for nominal operations [Complete]
CIR – Manifold Bottle Replacement [Complete]
Removal of US TV camera and Lights from Orlan Suit [Complete]
Photo/TV Camcorder Setup Verification [Complete]
CIR – Rack Doors Close [Complete]
Setting up Orlan and ??? for storage mode [Complete]
Surface Sample Kit (SSK) Collection/Incubation [Complete]
Post-EVA Photo Downlink and Camera Reconfig [Complete]
T2 Exercise Video Equipment Stow [Complete]
Water Transfer from Tank 3 to EDV [Complete]
HRF1 8PU Drawer Installation and Configuration [Complete]
INSP3- Closeout Ops [Complete]
SHD – Weekly Questionnaire [Complete]
MSG Hardware Deactivation [Complete]
Flight Director/ISS Crew Tagup [Complete]
??? ?1 Absorption Cartridge Regeneration (termination) [Complete]
Task List

CEO Operations [Complete]
ARED Cylinder Evacuation
???-? Remove and Replace
ESA Video Message Record
Crew Choice Video Downlink
Data Prep for Return
34S US Prepack [In Work]
52P US unpack [In work]
Blackout Curtain Retrieve
Crew Departure Prep FE-3
WSTA Fill [Complete]
URAGAN. Observations and Photography
IMS Update
??? Maintenance
ECON-M. Observations and Photography
Preparation of reports for Roskosmos site
Ground

Mobile Transporter (MT) Translation from Worksite (WS)4 to WS6 [Complete]
Space Station Remote Manipulator System (SSRMS) Walkoff from N2 Power and Data Grapple Fixture (PDGF) to Mobile Remote Servicer (MRS) Base System (MBS) PDGF 1 [In Work]
Special Purpose Dexterous Manipulator (SPDM) Unstow from Lab PDGF [In Work]
Three-Day Look Ahead:

Saturday, 8/24: 52P Ingress, EVA Tool stow, Ground MSS Operations to retrieve the HTV4 MBSU and UTA
Sunday, 8/25: Ground MSS Operations to mate the HTV4 MBSU and UTA FRAMs on ISS
Monday, 8/26: HTV4 Cargo Ops, WHC Air Hose and Liquid Indicator R&R, InSPACE3, 34S Prepack of US items.

QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up