Space Stations

NASA ISS On-Orbit Status 23 April 2015

By Marc Boucher
Status Report
April 27, 2015
Filed under , ,
NASA ISS On-Orbit Status 23 April 2015
NASA ISS On-Orbit Status 23 April 2015.
NASA

Today: Pre-Determined Debris Avoidance Maneuver (PDAM): Last night at 8:00 PM CDT the Flight Control Team was notified of a high concern, late notice conjunction. A PDAM was performed today at 12:35 AM CDT using 58P thrusters. Burn duration was 2 minutes, 20 seconds with a Delta-V of 0.3 meters/second.
Ocular Health: Padalka and Kornienko, with Virts as their Crew Medical Officer (CMO), performed ocular and cardiac echo ultrasound measurements as part of the Ocular Health medical evaluation. The ultrasound images will be used to identify changes in globe morphology, including flattening of the posterior globe, and document optic nerve sheath diameter, optic nerve sheath tortuosity, globe axial measurements, and choroidal engorgement. Ocular Health protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers. Researchers believe that the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post-flight recovery will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines.

Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly cleaned the Animal Access Unit following Tuesday’s sample collections. Disposable items were removed and bagged and consumable items were replaced with spares.

Cold Stowage Operations: Virts completed a nominal maintenance activity of desiccant swap on the Polar-2 cooler located in EXpedite PRocessing of Experiments to Space Station (EXPRESS) Rack 8. He then stowed the Ice Bricks brought up by SpX-6 currently in the Double Cold Bags.

Robotics Operations: In preparation for next week’s Robotics Refueling Mission (RRM) transfer operations, today Robotics ground controllers translated the Mobile Transporter (MT) from Work Site (WS)-4 to WS7.

Dragon Cargo Operations: The USOS crew spent a large portion of their day transferring cargo from the Dragon vehicle. Cargo operations were reported to be approximately 25% complete at the end of yesterday’s crew day.

Today’s Planned Activities
All activities were completed unless otherwise noted.

SLEEP Questionnaire
MYCO – Morning Sample Collection
MYCO – Sample MELFI Insertion
USND2 – Hardware Activation
OBSTANOVKA. (start)
Maintenance Activation of Spare Atmosphere Purification System Emergency Vacuum Valves [??? ???]
JEM Remote Sensor Unit Battery R&R
Ultrasound2 – Scanning Prep
Ultrasound2 – Scanning Ops
VIBROLAB. Hardware Modes Check.
DRAGON Transfer Ops
SEISMOPROGNOZ.(start). COSMOCARD. Closeout Ops
Ultrasound2 – Data Export
???? Configuration for MRM2
Connecting HDV Sony HRV-Z7E Camcorder on MRM2 EV1 window and Running NASA MPEG-2 Viewer
Ultrasound2 – Scanning Ops
CARDIOVECTOR. Experiment Ops.
Pointing camera to High-Gain Antenna boom (??? ) for ???? ??? Drive Test.
Comm reconfig for nominal ops
??? Maintenance
Ultrasound2 – Data Export
VIBROLAB. Copy and Downlink Data
Ultrasound 2 – Scanning
Set up video equipment to record ARED exercise
OH-CARDIAC – Preparation
Rodent Research (RR) – Cleaning Animal Access Unit
OBSTANOVKA. (end)
HDV Sony HRF-ZTE camcoder power off
Ocular Health – Cardiac Ops OCT Exam
OH-CARDIAC – Ocular Health Operator
Evaluation of Orthostatic Stability with LBNP (assistance)
Orthostatic Stability Evaluation with LBNP.
OH-CARDIAC – Closeout Ops
ARED Photo/TV Camcorder Setup Verification
OH-CARDIAC – Data Export
DRAGON Transfer Ops
ESA Weekly Crew Conference
EML – Lens Replacement
USND2 – Hardware Deactivation
Kazbek Fit Check
Completing activities with NASA MPEG-2 Viewer application, Closeout ops
TORU OBT.
Removal of ??? (??251??) No.1417726326 and ROM from ??? 424 (DC1)
Camcorder Stowage
DRAGON Transfer Ops
POLAR1 – Desiccant Pack Swap
PAO Hardware Setup
Double Cold Bag (DCB) Stowage of Ice Bricks
Crew Prep for PAO
PAO Event
DRAGON Transfer Ops
IMS Delta File Prep
SEISMOPROGNOZ.
MATRYOSHKA-R. BUBBLE-dosimeter collection and measurements.
DRAGON – Transfers Tagup
DRAGON Transfers Conference
SPLANH. Preparation for Experiment
RELAKSATSIYA. Start Video Camera Battery Charge
NMAP – Reading Reminder
Completed Task List Items

None
Ground Activities
All activities were completed unless otherwise noted.

MT Translate from WS4 to WS7 [In work]
Ocular Health operations
RR access unit cleaning
Three-Day Look Ahead:

Friday, 04/24: NeuroMapping Neurocognitive Ops, USOS Crew off duty
Saturday, 04/25: Crew off duty, housekeeping
Sunday, 04/26: Crew off duty, Fine Motor Skills
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – Off
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – On
Carbon Dioxide Removal Assembly (CDRA) Lab – Operate
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Shutdown
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.