NASA ISS On-Orbit Status 21 May 2014
Today: Advanced Colloids Experiment (ACE)-M-2 Sample Mixing: Commander (CDR) Swanson mixed ACE-M-2 samples in preparation for sample analysis which will take place in the Fluids Integrated Rack (FIR) at a later date.
In the ACE-M-2 investigation, a model colloidal system is used to observe the microscopic behavior of liquids and gases separating from each other, near the critical point, via a process called spinodal decomposition.
In Flight Maintenance (IFM): Swanson performed a Waste and Hygiene Compartment (WHC) flush tank fill and depressurized the flush water tank and water valve block to protect the dose pump.
Public Affairs Office (PAO) Event: Swanson participated in a PAO event with middle and high school students. Topics included research being conducted on the ISS and what types of tasks are performed during space walks.
Today’s Planned Tasks
RSS1,2 Reboot / r/g 1009 [Complete]
Laptop RS1(2) Reboot [Complete]
SM ??? (Caution & Warning Panel) Test [Complete]
Daily Planning Conference [Complete]
Terminate EMU METOX Regeneration [Complete]
OTKLIK. Equipment setup r/g 5684 [Complete]
Start EMU Metox Regeneration [Complete]
SM Ventilation System Preventive Maintenance. Group ?1 [Complete]
Flushing ??? 421 (AO) Rodnik ??2 Tank Connectors / r/g 5686 [Complete]
On MCC Go Urine Transfer from EDV-U to ??? 421 Rodnik ??1 tank (AO) / r/g 5686 [Complete]
ACE. OBT Review [Complete]
ACE. Sample 60-Minute Mixing [Complete]
ACE. Sample 50-Minute Mixing [Complete]
ACE. Sample 40-Minute Mixing [Complete]
Filling (separation) of EDV [KOB] for Elektron from ??? 427 r/g 5638 [Complete]
Replace ???? set between ??1 and ???1. r/g 5664 [Complete]
WRS Water Sample Analysis [Complete]
VEG – Daily Plant Check [Complete]
VEG – Plant Water Refill [Complete]
??? Maintenance [Complete]
VEG – Weekly Plants Photo [Complete]
WHC Fill [Complete]
??-1 Flow Sensor Position Check / Pressure Control & Atmosphere Monitoring System [Complete]
On-orbit Hearing Assessment using EARQ [Complete]
Replace Condensate Removal Lines set from ??1 to ?? ???-?2?. r/g 5664 [Complete]
??? 421 Stowage Ops / r/g 5685 [Complete]
JRNL – Journal Entry [Complete]
MELF1 – Insert Ice Bricks [Complete]
Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger (???) Cleaning [Complete]
MELFI3. Ice Brick Insertion into MELF3 [Complete]
PAO Hardware Setup [Complete]
TOCA Data Recording [Complete]
Daily Planning Conference [Complete]
IMS Update
Crew Prep for PAO [Complete]
PAO Event [Complete]
Task List
ARED Cylinder Evac
WHC EDV-U R&R
Roscosmos Report
Ekon Photo
IFM-WHC UR/IF R&R
39S CMS pre-gather
3DA1-Cam-Ops
ARED Dashpot inspect
CEVIS Isolator MOD
Cygnus pre-gather
EMU 3005 Photos
EMU LLB Auto-Init
EMU LLB SSC Relocate
EMU LLB SSC Return
EVA ORU Bag Inspection
IFM MOOT restow
IFM NOD1OS2 LHA R&R
IFM NOD1PD2 LHA R&R
PEPS Inspect
No-skid tape audit
NOD3 PEPS assessment
P/TV Hardware questions
POSSUM PL Photo
PMM cleanup
Viable Crew OBT
Viable PL Photo
Viable PL Touch
WMRS MRF Remove
Ground
Nominal commanding
Three-Day Look Ahead:
Thursday, 05/22: MSL SCA Exchange, Resist Tubule Prep, MELFI Ice brick install
Friday, 05/23: Crew half duty, Sprint BP/ECG, Resist Tubule samples, move CLPA from SSRMS boom to MBS mast
Saturday, 05/24: Crew day off, VEG-01 daily check
QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – On
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Override
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Norm
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up