NASA ISS On-Orbit Status 20 October 2014.
NASA

Today: United States On-orbit Segment (USOS) Crew Day Off / SpaceX Unberth Delay: Today was a USOS Crew day off, resulting from a delay to unberth SpaceX-4 Dragon.
Due to forecasts of high seas at the time of splashdown, SpaceX-4 unberth and landing has been delayed until this coming Saturday, October 25th. Dragon loading and hatch closure activities are being replanned to support the new unberth date.

Mobile Servicing System (MSS) Operations: Robotic Flight Controllers powered up the MSS and utilized the Space Station Remote Manipulator System (SSRMS) in order to grapple the Dragon Flight Releasable Grapple Fixture (FRGF). Today’s SSRMS maneuver was performed in preparation for Saturday’s Dragon unberth and release. MSS performance was nominal.

Today’s Russian Orbital Segment (ROS) Planned Activities

All activities were completed unless otherwise noted.

Inspection of connector U?-U on ???-?? behind [???] panel 139 and Inspection of pipe 5182-03 from ???? to [???] in its transparent area
Air Duct Removal in DC1 (leave ?3 in place)
Comm Config for Suited OBT
Orlan #5 and #6 Systems Check
DC1 ??? (Orlan Interface Unit) Check
CIR – Hardware Teardown
??? ?1 Absorption Cartridge Regen (start)
Donning Gear
CASCAD. Activation of ???-? #04 thermostat to +4 degrees ?
Filter R&R on ??1, ??2 dust collectors in FGB
Comm Check and Medical Parameters Check
FGB interior panels fan grille cleaning (panels 116, 316, 231, 431)
Check Initial Status of Orlan and ???
Donning Orlans ##5 and 6, Closing Backpacks
Suited Translation OBT – assist during suited translation
Check Orlan and ??? Controls
Orlan and ??? Preliminary Leak Checks
Check Sizing of Orlans #5 and #6 at Suit Pressure=0.4
Downlink PE data / r/g 6797
Suited Translation OBT
Doffing Orlans
Comm Reconfig to Initial after Suited OBT
MICRO8- Hardware Transfer to Dragon
CASCAD. Manual Mixing in Bioreactor
Post-OBT Ops, Air Duct Installation
Change dust filter and Gas-Liquid Heat Exchanger [???] Cleaning in ?R?1
Cleaning fan grille on FGB interior panels (panels 201, 301, 401)
Add-on Gear Installation on ORLAN prior to EVA
On-board ??-3? R&R
CPCG-HM MERLIN 4 & 5 – Status Check
CPA Installation
??? ?1 Absorption Cartridge Regen (termination)
Completed Task List Items

ETVCG Disassmbly
CQ Organizer Feedback
Journal Nominal Entry
IMAX 1DC Camera Setup and Checkout
Ground Activities

All activities were completed unless otherwise noted.

SSRMS Maneuver to Dragon grapple position
Three-Day Look Ahead:

Tuesday, 10/21: Vision Test, Water Balance, Post EVA EMU Loop Scrub
Wednesday, 10/22: RS EVA 40, CMO OBT, Solar Array photos, fundoscope
Thursday, 10/23: Ultrasound, HRF Blood Ops, Cardiac Ops, EVA tool transfer
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – On
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.