Today: Double Cold Bag (DCB) Packing: ISS CDR Swanson and FE-1 Skvortsov packed six DCBs with conditioned science samples for return on SpaceX-3.
SpaceX-3 Departure Preparations: Swanson completed the final SpaceX-3 cargo loading. He then completed the SpaceX-3 egress and vestibule closeout procedures, including installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs). Finally, he configured the Robotics Work Station (RWS) cameras. SpaceX-3 unberth is scheduled at 6:40am CDT tomorrow with release scheduled at 8:26am CDT.

CBM Bolt 3-1 Checkout: After Swanson installed the CBM CPAs, the ground team checked out CBM Bolt 3-1, which had failed during SpaceX-3 berthing operations and was subsequently changed out. The bolt was fully retracted to confirm the initial configuration. It was then driven and retracted to verify nominal operation. Bolt 3-1 will be masked to support SpaceX-3 demate.

Today’s Planned Tasks

SM Caution and Warning Panel (???) [Complete]
Laptop RS1(2) reboot [Complete]
RSS1,2 reboot r/g 1009 [Complete]
Daily Planning Conference (S-band) [Complete]
Double Cold Bag Procedure review for Dragon [Complete]
OTKLIK. Installation area prep. Tagup with specialist r/g 5654 [Complete]
Double Cold Bag Packing to Dragon [Complete]
BLB – Checking Biolab Laptop Connection
DRAGON Transfer Ops [Complete]
??? Maintenance [Complete]
Dragon Egress [Complete]
Telephone conference with “Russian Cosmos” magazine editor / r/g 5669 [Complete]
Dragon – Hatch Closure [Complete]
Dragon Vestibule Configuration for Demate [Complete]
CPA installation [Complete]
Connecting DCP Power Cable for RWS in Cupola and LAB [Complete]
Camera Setup to View LAB Remote (RWS) Monitor 3 [Complete]
CGBA-4 Powerdown [Complete]
CGBA-6 Powerdown [Complete]
Daily Planning Conference (S-band) [Complete]
VEG – Daily Plant Check [Complete]
Video recording for Roscosmos TV studio / r/g 5667
USOS Window Shutter Close
Task List

ARED Cylinder Evac
WHC EDV-U R&R
Roscosmos Report
Test Operation of ??? on ISS RS
Ekon Photo
CTB 1048 Relocate
Dragon Temp Logger Find [In work]
3DA1-Cam-Ops
EMU 3005 Photos
EMU LLB Auto-Init
EMU LLB SSC Relocate
EMU LLB SSC Return
EVA ORU Bag Inspection
MOOT restow
NOD1OS2-LHA R&R
NOD1PD2-LHA R&R
PEP Inspection
WHC UR/IF R&R
KTO EDV Audit
NOD3 PEPS assessment
P/TV Hardware questions
POSSUM PL Photo
Viable Crew OBT
Viable PL Photo
Viable PL Touch
WMRS MRF Remove
Ground

Nominal commanding
SpaceX-3 configuration for unberth [Complete]
CBM CPA checkout and Bolt 3-1 verification [Complete]
Three-Day Look Ahead:

Sunday, 05/18: Dragon release 8:26am CDT
Monday, 05/19: Crew off duty, Resist Tubule MELFI insert, RADIN
Tuesday, 05/20: OGA H2 sensor R&R, SpaceX-3 debrief, MELFI Ice brick install
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Standby
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up