NASA ISS On-Orbit Status 15 August 2014

By Marc Boucher
Status Report
August 18, 2014
Filed under , ,
NASA ISS On-Orbit Status 15 August 2014
Intersecting the thin line of Earth's atmosphere, International Space Station solar array wings are featured in this image photographed by an Expedition 40 crew member on the orbital outpost. Credit: NASA.
NASA

Today: Orbital-2 Cygnus Unberth: Cygnus was unberthed from the ISS at 4:10am and released at 5:40am CDT. After unberth, Cygnus completed two burns to move above and trailing behind the ISS.
Over the next two days the vehicle will perform Detailed Test Objectives (DTOs) to characterize spacecraft performance for future missions. Destructive re-entry is scheduled to occur on Sunday. The ISS crew will photograph the Cygnus re-entry to add to the knowledge base supporting ISS End-of-Life disposal operations.

Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Zero Robotics Competition: Commander (CDR) Swanson and Flight Engineer (FE)-5 Wiseman set up the SPHERES hardware and executed SPHERES Zero Robotics tests with participation from students on the ground. Over 100 students were in attendance at MIT for the competition with over a thousand students viewing the competition via webcast from eight different states. The SPHERES Zero Robotics investigation establishes an opportunity for high school students to design research for the ISS. As part of a competition, students write algorithms for the SPHERES satellites to accomplish tasks relevant to future space missions. The algorithms are tested by the SPHERES team and the best designs are selected for the competition to operate the SPHERES satellites on board the ISS.

In-Flight Maintenance (IFM): FE-6 Gerst performed this regularly scheduled maintenance to Remove and Replace (R&R) the Waste and Hygiene Compartment (WHC) pre-treat tank.

On-Board Training (OBT) Automated Transfer Vehicle (ATV): All six crew members participated in an ATV emergency procedure review. The training familiarizes the crew with location of ATV hardware used in emergencies and main features of ATV emergency response.

Russian EVA #39: The Russian crew continued preparations for Monday’s EVA. On Saturday the crew will perform a suited dry run, and on Sunday the ATV hatches will be closed. The EVA is scheduled to begin at 9am CDT on Monday.

Today’s Planned Tasks

RSS1, 2, Reboot / r/g 1009 [Complete]
Laptop RS1(2) Reboot [Complete]
SM ??? (Caution & Warning Panel) [Complete]
Daily Planning Conference (S-band) [Complete]
CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
Weekly Housekeeping [Complete]
SM Ventilation Subsystem Preventive Maintenance, [Complete]
FGB ??2 Fan Cleaning [Complete]
Inspection of Air Conditioner [Complete]
Cleaning Auxiliary Computer System (???) Laptops / r/g 1141 [Complete]
Cygnus/Node 2 – vestibule pressure check [Complete]
Node 2 CBM – Demate [Complete]
Camcorder Setup to View LAB Remote Workstation (RWS) Monitor 3 [Complete]
Cygnus – Hardware Command Panel (HCP) Setup [Complete]
On-orbit Hearing Assessment using EARQ [Complete]
Cygnus – Hardware Command Panel (HCP) Selfcheck [Complete]
Cygnus/Node 2 – terminate vestibule depress [Complete]
Rendezvous and Proximity Operations Program (RPOP) Setup for determining the range and range rate of approaching Cygnus vehicle [Complete]
Food Frequency Questionnaire [Complete]
Psychological Evaluation Program (WinSCAT) [Complete]
SSRMS – Cygnus Grapple Release [Complete]
???? (Plume Impingement and Deposit Monitoring Unit) R&R r/g 6378 [Complete]
ATV5-??? SM air duct checkout and photography. r/g 6385 [Complete]
RWS Teardown [Complete]
Cygnus – Hardware Command Panel (HCP) Inhibit [Complete]
Video stowage [Complete]
Waste and Hygiene Compartment (WHS) Pre-Treat Tank and Pre-Treat Tank Hose R&R [Complete]
Cleaning SM and FGB Potok-150MK Air Purification System Pre-filters [Complete]
JRNL – Journal Entry
SPH. Zero Robotics Setup and Checkout [Complete]
Cygnus – PROX Power Switch OFF [Complete]
Cygnus – Hardware Command Panel (HCP) Stow [Complete]
On-orbit Hearing Assessment using EARQ [Complete]
RADIOSKAF. Terminating Charging and Preparing for EVA.r/g 6371 [Complete]
??? Maintenance [Complete]
IMS and Stowage Conference [Complete]
SPHERES – Conference with Students [Complete]
SPHERES – Test Run [Complete]
RGN-REC TK – Transfer and Replacement [Complete]
ISERV – Opening Window Shutter [Complete]
SPHERES Shutdown [Complete]
JRNL – Journal Entry [Complete]
CASKAD. Manual Mixing in Bioreactor / r/g 6238 [Complete]
ATV Delta Emergency Procedure Drill / r/g 6367 [Complete]
Task List

ARED Cylinder Evac
WHC KTO Replace
WHC-???-? R&R
Ekon photo
WHC UR/IF R&R
SSCV5 data move
SSCV5 server load
SSCV5 training
3DA1 cam ops
AQM H/W relocate [Complete]
ARED detent flip
Data prep return
CTB unpack/relocate
Food warmer mod
NOD2OP2-2 LHA R&R
Ground

Nominal commanding
SSRMS operations for Orb2
Three-Day Look Ahead:

Saturday, 08/16: Crew off duty
Sunday, 08/17: Crew off duty, ATV5 hatch close for RS EVA Monday, Orb-2 re-entry photography
Monday, 08/18: RS EVA #39, SSC V5 prep
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) – Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node – 3 Operate
Major Constituent Analyzer (MCA) Lab – Stop
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up