NASA ISS On-Orbit Status 12 September 2013
In Flight Maintenance (IFM) Crew Quarters (CQ) Cleaning – Flight Engineer (FE)-6 Nyberg cleaned the overhead CQ intake and exhaust ducts, fan and flow sensors. This routine maintenance was performed in preparation for the arrival of new ISS crewmembers later this month.
Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions (InSPACE)-3 Experiment Runs: FE-5 Parmitano completed InSPACE-3 runs 19 through 22 today out of a total of 42 runs planned as part of this experiment series. InSPACE-3 studies the behavior of magnetic colloidal fluids which transition to a solid-like state by the formation and cross-linking of microstructures in the presence of a magnetic field. This technology can be used for vibration damping systems and can improve the design of structures.
Cygnus Pregather – Parmitano and Nyberg continue gathering disposal items in preparation for Orbital Demo 1 berthing, currently scheduled for 22 September 2013. The items are being stowed temporarily at the Permanent Multipurpose Module (PMM) Endcone.
Today’s Planned Tasks
Reaction Self Test [Complete]
Regeneration of ??? ?1 Micropurification Cartridge (start) [Complete]
MSG – Visual inspection and activation [Complete]
MCA HV01 Valve Open [Complete]
CIR Alignment Guide Removal [Complete]
Setup for Robotics OBT [Complete]
ISS – HAM Radio Activation [Complete]
Overhead Crew Quarters Cleaning [Complete]
Purging Elektron-VM Liquid Unit (??) after Shutdown [Complete]
InSPACE3 Experiment Run Operations [Complete]
Download Pille Dosimeter Readings [Complete]
ISERV – Opening window shutters in the LAB [Complete]
CYGNUS. Cargo Pre-gather [Complete]
Checkout of ??-??? hatch pin switch (part 1). [Complete]
Camcorder setup to capture ??2 exercise [Complete]
Activation of LF Data Receiver (??? ??) for Telemetry recording [Complete]
Food Frequency Questionnaire [Complete]
Remove Video Equipment Used to Film Treadmill ??2 Exercise and Downlink the video [Complete]
Deactivation of LF Data Receiver (??? ??) for telemetry recording, downlink the file [Complete]
ATV – ISS Air Repress (start) [Complete]
INSP3 – Closeout Ops [Complete]
Health check of acoustic ????-24 headset S/N 8310 [Complete]
InSPACE3 Experiment Run Operations [Complete]
??? Maintenance[Complete]
ATV – ISS Air Repress (terminate) [Complete]
CYGNUS. Cargo Pre-gather[Complete]
MATRYOSHKA-R. Installation of protective screen in starboard crew cabin [Complete]
Crew Handover Conference[Complete]
INSP3- Closeout Ops[Complete]
IV-TEPC Relocate [Complete]
IMS and Stowage Conference [Complete]
MSG Hardware Deactivation [Complete]
MCA HV01 Valve Close [Complete]
PAO Hardware Setup [Complete]
Crew Prep for PAO [Complete]
ISS-MCC-M TV Greetings. Conducted in Node 3 [Complete]
??? ?1 Absorption Cartridge Regeneration (termination) [Complete]
USOS Window Shutter Close [Complete]
Reaction Self Test [Complete]
Task List
CEO Ops
ARED Cylinder Evacuation
IMS Update
??? replace
???-? R&R
ECON-M. Observations and Photography
??-1 Flow Sensor Position Check
URAGAN. Observations and Photography
Preparation of reports for Roskosmos site
WSTA Fill [Complete]
HMS WinSCAT Test
Ground
Ground Commanding [Complete]
Three-Day Look Ahead:
Friday, 9/13: InSPACE3, PROX ORU Activation, Cygnus Robotics OBT
Saturday, 9/14: InSPACE3, EPO Laplace Execution, Housekeeping, Off Duty
Sunday, 9/15: Off Duty, reboost
QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Stop
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Normal
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up