New Status: USOS Crew Off Duty: The USOS crew was off duty today for compensation for HTV ingress activities performed on Saturday.
H-II Transfer Vehicle (HTV)-4 Cargo Operations: Saturday and Sunday the crew performed 13 hours of HTV cargo operations, however through efficiency, the crew completed approximately 25.5 hours of cargo transfers. Today, the crew performed 2 hours off of the task list of cargo operations, completing an estimated 6.5 hours of transfer operations. Stowage specialists estimate approximately 49 hours remain of cargo or approximately 40% complete.

Russian Segment (RS) Extravehicular Activity (EVA) 34 Preparations: Over the weekend FE-2 Misurkin and FE-4 Yurchikhin reviewed EVA translation paths and work zones and installed the docking mechanism at the Docking Compartment (DC)1/52 Progress (52P) interface. Today they participated in a procedures review with ground teams. They also conducted spacesuit fit checks and separation unit leak checks. These activities are in preparation for Friday’s planned EVA #34.

On-Board Training (OBT) HTV Capture Debrief: All 3 USOS crew members participated in an HTV capture debrief with ground teams later today. Topics included suggestions for improvements in procedures, operations products and training.

Crew Medical Officer (CMO) On-Board Training (OBT): FE-6 Nyberg completed her CMO OBT. This is a Computer Based Training (CBT) module that requires no ground interaction and is performed periodically to maintain proficiency for designated CMOs.

Combustion Integrated Rack (CIR) Alignment Guide Removal for Italian Combustion Experiment for Green Air (ICE GA) Experiment: Cassidy removed the alignment guides from CIR to unlock Passive Rack Isolation System (PaRIS) in preparation for the ICE GA experiment conducted by ground teams. Another run is planned for Wednesday. This new ISS experiment investigates the burning characteristics of biologically derived fuels to help develop the use of environmentally friendly fuels on Earth.

Mobile Servicing System (MSS) Operations: Yesterday Robotics Ground Controllers powered up the MSS and maneuvered the Space Station Remote Manipulator System (SSRMS) to extract the Exposed Pallet (EP) from H-II Transfer Vehicle (HTV) 4. They then maneuvered the EP to the handoff position at which point the Japanese Experiment Module Remote Manipulator System (JEMRMS) Ground Controllers maneuvered the JEMRMS to grapple the EP Flight Releasable Grapple Fixture (FRGF). Robotics Ground Controllers then released the SSRMS from the EP Power and Video Grapple Fixture (PVGF) and maneuvered the SSRMS to a park position. Once the SSRMS was parked, the JEMRMS Ground Controllers installed the EP on the JEM Exposed Facility (JEF).

Today’s Planned Tasks

Preparing for Replacement of ????-1? (?402) Battery Module 2. r/g 3155 [Complete]
Terminate 825?3 Battery Pack 1 Charging And Start Charging 825?3 Battery Pack 2 [Complete]
KASKAD. Manual Mixing in Bioreactor / r/g 3070 [Complete]
Specific EVA Procedure Review / r/g3146 [Complete]
Removal of Unit 800? of Module 3 and 4 Batteries in SM / SM IVA IMF r/g 3155 [Complete]
Cables Preparing for SSC Connection in MRM2 for EVA duration time / r/g 3159 [Complete]
Orlan suit # 6 Height Sizing r/g 3123 [Complete]
Replacement of ????-1? (?402) of Module 2 Battery r/g 3155 [Complete]
JEMRMS Monitor Stop [Complete]
DC1 ??-3? Oxygen Tank Pressure Check / EVA from DC [Complete]
??? ??-3? Oxygen Tank Pressure Check / EVA from DC [Complete]
URAGAN. Photo Spectrum System Battery Charge (start) / r/g 2857 [Complete]
Equipment Setup r/g 3123 [Complete]
Orlan suit #5 and ??? (Orlan Interface Unit) Leak Checks and Valve Tests [Complete]
ON MCC GO Mate telemetry connectors of ????-1? (A402) of Battery #2 Module r/g 3155 [Complete]
RWS – Disconnect DCP Cables [Complete]
Orlan suit # 6 and ??? (Orlan Interface Unit) Leak Check and Valve Tests [Complete]
ON MCC GO ISS O2 repress from ATV – start / ATV Systems Ops, r/g 3156 [Complete]
Installation of 800? Units of Batteries 3 and 4 Modules in SM / SM IVA IMF, r/g 3155 [Complete]
On-orbit Hearing Assessment using EARQ [Complete]
?3 Fan Screen Cleaning in DC1 [Complete]
Crew Medical Officer (CMO) Proficiency Training [Complete]
Tag-up with Robotics experts after HTV Capture and docking [Complete]
ON MCC GO ISS O2 repress from ATV – terminate / ATV Systems Ops, r/g 3156 [Complete]
Crew Medical Officer (CMO) Proficiency Training [Complete]
URAGAN. Observation and Photography using Photo Spectral System (???). r/g 3153 [Complete]
Cables transfer for SSC Laptop connecting in MRM2 for EVA duration period 3159 [Complete]
Connecting SSC Laptop in MRM2 [Complete]
??1 and ??2 air ducts cleaning in DC1 [Complete]
??? Maintenance [Complete]
CIR – Hardware Teardown [Complete]
LAB ISL Router Power Cycling for SM smart switch router (???) Troubleshooting [Complete]
On-orbit Hearing Assessment using EARQ [Complete]
IMS Update [Complete]
ISS – HAM Radio Session [Complete]
Exercise data downlink / r/g 2639 [Complete]
KASKAD. Manual Mixing in Bioreactor / r/g 3070 [Complete]
Daily Planning Conference (S-band) [Complete]
RELAKSATSIYA. Relaksatsiya P/L Battery Charge r/g 1845 [Complete]
Preparation of reports for Roskosmos site / r/g 0484 [Complete]
URAGAN Observations and Photography / r/g 3151 [Complete]
ECON-M. Observations and Photography [Complete]
Task List

CEO Ops [Complete]
ATV Rack front config
ARED CylinderEvac
FUJ13D Battery Check
RGN WSTA Fill
WHC KTO Replace
WHC EDV R&
Roscosmos Report
Ocean Obs
52P USOS Unpack [In Work]
Bk Curtain Retrieve
Data Prep for Return FE-3
HTV4 Cargo Ops
Crew Choice DL
MELFI1 N2 Pressure Check
MELFI2 N2 Pressure Check
MELFI3 N2 Pressure Check
P/TV Adapter Locate
P/TV Trash Gather
Ground

Nominal Commanding
Three-Day Look Ahead:

Tuesday, 8/13: ATV air transfer, HTV4 cargo ops, SPHERES, IFM WHC pre-treat tank R&R

Wednesday, 8/14: HTV4 cargo ops, OBT CMO Proficiency Training, BCATC1, InSPACE3

Thursday, 8/15: JEM IMV flow measure, OBT CMO Proficiency Training, HTV4 cargo ops, Glacier, InSPACE3

QUICK ISS Status – Environmental Control Group:

Component – Status

Elektron – On
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – On
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Process
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up