NASA ISS On-Orbit Status 1 March 2015

By Marc Boucher
Status Report
March 2, 2015
Filed under , ,
NASA ISS On-Orbit Status 1 March 2015
NASA ISS On-Orbit Status 1 March 2015.
NASA

NASA astronauts Terry Virts and Barry Wilmore ended their spacewalk at 12:30 p.m. EST with the repressurization of the Quest airlock.
Virts and Wilmore completed installing 400 feet of cable and several antennas associated with the Common Communications for Visiting Vehicles system known as C2V2. Boeing’s Crew Transportation System (CST)-100 and the SpaceX Crew Dragon will use the system in the coming years to rendezvous with the orbital laboratory and deliver crews to the space station. They completed one additional task to retrieve a bag to cover equipment on the outside of the station.

The 5-hour, 38-minute spacewalk was the third for Virts and the fourth for Wilmore. Virts has now spent 19 hours and 2 minutes outside during his three spacewalks. Wilmore now has spent 25 hours and 36 minutes in the void of space during his four excursions.

Crews have now spent a total of 1,171 hours and 29 minutes conducting space station assembly and maintenance during 187 spacewalks.

On-Orbit Status Report

Extravehicular Activity (EVA) 31: Wilmore and Virts accomplished all planned objectives and one get-ahead task within a Phased Elapsed Time (PET) of 5 hours 38 minutes. Cristoforetti and Shkaplerov assisted during suit donning and doffing activities. The Joint Airlock egress took place at 5:52am CST and post EVA hatch closure at 11:27am CST. Objectives accomplished during today’s EVA are as follows:

P3 C2V2 Boom, Antenna, and Retro-Reflector Install
S3 C2V2 Boom, Antenna, and Retro-Reflector Install
Lab MMOD Shield Removal, C2V2 Cable Route and Connect to Lab
Deploy and Connect P3 C2V2 Cable C and D
Deploy and Connect S3 C2V2 Cable A and B
Get-ahead task: GTEC Bag Retrieval
Today’s Planned Activities
All activities are completed unless otherwise noted.

PBA – Relocation for USOS EVA
Photo/TV EVA Camera Test
ISS HAM RADIO Power Off
US EVA – EVA CUCU Deactivation
Atmosphere Control and Supply (ACS) High Pressure Oxygen Bypass Configuration
EVA – In-Suit Light Exercise (ISLE) Preparation
USOS EVA Comm Config
CASKAD. Manual Mixing in Bioreactor
MORZE. Logging Liquid and Food (Medicine) Intake
EVA – In-Suit Light Exercise (ISLE) Preparation
Atmosphere Control and Supply (ACS) High Pressure Nominal Configuration (O2)
EMU Prep for EVA
Pre-Breathe in EMU
VELO Exercise, Day 2
Crew Lock Depress
Post Depress and A/L Egress
C2V2 Installation
MMOD Shield Removal
??? Maintenance. SM and FGB ???, ???, ??? ???? Counter, POTOK Air Purification System Data Calldowns
MORZE. Logging Liquid and Food (Medicine) Intake
C2V2 Cable Routing
Crew Lock Ingress
MORZE. Prep Ops
Oximeter Removal
Configuration for EMU Glove Photography
Crew Lock Pre-Repress
Crew Lock Repress
Post-EVA Activities
CASKAD. Manual Mixing in Bioreactor
Return to nominal comm configuration after USOS EVA
MORZE. Logging Liquid and Food (Medicine) Intake
EVA Camera Reconfig
EMU Glove photos downlink
Start EMU Metox Regeneration
Reading Reminder
SPLANH. Experiment Timeline Review
Installation of Software Version 4.0 On RSE-MED Laptop
Inventory Audit Personal Hygiene Articles (???) and Sleep Bag Inserts (???)
Preparation of reports for Roscosmos site
ECON-M. Observation and Photography
URAGAN. Observation and Photography
SM Ventilation System Preventive Maintenance. Group ?
Completed Task List Items

None
Ground Activities
All activities are completed unless otherwise noted.

System commanding associated with EVA 31
Three-Day Look Ahead:

Monday, 03/02: Post EVA PHS, NMAP, Metox Regen, USOS Crew Day Off
Tuesday, 03/03: 40S Crew Departure Prep, FCPA R&R, Crew Handover Conference, EMU Loop Scrub
Wednesday, 03/04: IDA Ethernet Install, EVA Metox Regen, EMU Water Conductivity Test, Airway Monitoring Hardware Deploy, Emergency VHF Checkout, CardioOX
QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[???] 1 – SM Air Conditioner System (“SKV1”) – On
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Idle
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Standby
Urine Processing Assembly (UPA) – Stop
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up