Space Stations

NASA International Space Station On-Orbit Status 4 November 2016

By Marc Boucher
Status Report
November 7, 2016
Filed under , ,
NASA International Space Station On-Orbit Status 4 November 2016
NASA International Space Station On-Orbit Status 4 November 2016.
NASA

Today: Human Research Program (HRP) Collections: The crew continued a urine collection session today and performed the first blood draw in support of the Biochemical Profile and Repository experiments. Collected samples are placed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return at a later date.
The Biochemical Profile experiment tests blood and urine samples obtained from astronauts before, during, and after spaceflight. Specific proteins and chemicals in the samples are used as biomarkers, or indicators of health. Post-flight analysis yields a database of samples and test results, which scientists can use to study the effects of spaceflight on the body. Repository is a storage bank used to maintain biological specimens over extended periods of time and under well-controlled conditions. This repository supports scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment and provides unique opportunities to study longitudinal changes in human physiology spanning many missions.

Orbital ATK (OA)-5 Cargo Operations: Today, the crew continued transferring cargo from Cygnus to ISS. After the transfer operations, CDR participated in a cargo conference with ground specialists. At last report approximately 9.5 hours of cargo operations had been completed and an estimated 16 hours of operations remaining.

International Docking Adapter (IDA) Survey: The robotics team is performing an imagery survey of the recently installed IDA at Pressurized Mating Adapter 2 (PMA-2). The purpose of the survey is to perform a full characterization of the final installed state of the PMA docking target, IDA peripheral targets, hemi-spherical and planar reflectors, and key features on the Node 2 end-cone, PMA-2, and IDA that face ISS forward. This survey will help ensure that there are no key features that are partially blocked or unexpectedly shadowed to ensure the relative navigation of any incoming vehicles will not be adversely affected. In addition, the imagery will be used to provide accurate information regarding the position and orientation of the docking plane interface. Today’s imagery will be a series of static surveys that place the SPDM at several locations around the PMA-2 and IDA. Additional dynamic surveys using auto-sequence commanding to simulate the view from an incoming docking vehicle as it approaches the ISS will be performed next week.

Today’s Planned Activities
All activities were completed unless otherwise noted.

EKON-M. Observations and photography
HRF Generic Urine Collection
HRF Generic Blood Collection
HRF Generic Refrigerated Centrifuge Configuration
PAO Preparation
HRF Generic Sample MELFI Insertion
PAO Hardware Setup in LAB
TV Conference with Voskhod Recreation Camp
IMS Tagup
ISS HAM Service Module Pass
Crew time for ISS adaptation and orientation
HRF Generic Frozen Blood Collection Conclude Stow
DAN. Experiment
Verification of ??-1 Flow Sensor Position
Replacement of ??-1 Flow Sensor on ???-MRM2 hatch (removal)
Nitrogen Purge Assembly (???-M) R&R in Elektron-VM Oxygen Generation Unit [???] (Removal)
De-mating ??? connector from and ???-? connector.
Demating telemetry connector from ??-1 Flow Sensor.
???-M Nitrogen Purge Assembly R&R in Elektron-VM Oxygen Generation Unit [???] (Installation)
Replacement of Flow Indicator ??-1 on ???-MRM2 hatch (installation)
Mating ??? and ???-? Connectors
Mating ??-1 Flow Sensor telemetry connector
Deinstall Nitrogen purging unit (???) ??6 half connector intended for disposal
Replacement of ??-1 Flow Sensor on ???-MRM2 hatch, Closeout Ops
Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
VEG-03 Plant Photo
24-hour ECG Recording (termination)
??? maintenance
Regenerative Environmental Control and Life Support System (RGN) WSTA Fill
ISS Crew Orientation
24-hour Blood Pressure Recording (start)
Transfer of Hard Drive from USOS to RS
Progress 433 (DC1) Transfers and IMS Ops
Photography of Plume Impingement and Deposit Monitoring Unit (????) position on MRM2 through SM window No.13
IDENTIFIKATSIYA. Exporting ???-? Micro-Accelerometer Data to Laptop
Crew time for ISS adaptation and orientation
Regenerative Environmental Control and Life Support System (RGN) WSTA Fill
Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Fill Part 3
Transfer Cygnus Cargo Operations
Cygnus Cargo Operations Conference
Regenerative Environmental Control and Life Support System (RGN) WSTA Fill

Completed Task List Items
None

Ground Activities
All activities were completed unless otherwise noted.
IDA Imagery Survey
4B2 Battery Capacity Test

Three-Day Look Ahead:
Saturday, 11/05: Housekeeping, Crew Off Duty, OGS H2 Dome R&R tool gather
Sunday, 11/06: Crew Off Duty
Monday, 11/07: Cygnus transfer, OGS H2 Dome R&R prep, At Home in Space, Radin

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – On
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Operate
Major Constituent Analyzer (MCA) Node 3 – Idle
Oxygen Generation Assembly (OGA) – Shutdown
Urine Processing Assembly (UPA) – Process
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.