Space Stations

NASA International Space Station On-Orbit Status 24 November 2016

By Marc Boucher
Status Report
November 28, 2016
Filed under , ,
NASA International Space Station On-Orbit Status 24 November 2016
NASA International Space Station On-Orbit Status 24 November 2016.
NASA

Today: Cell Biology Experiment Facility (CBEF) Centrifuge Remove and Replace (R&R): The crew was scheduled to remove the 1G centrifuge from the CBEF and install a new centrifuge.
However, the bag with the new centrifuge could not be found. Teams are investigating impacts to downstream science and opportunities to launch replacement hardware. The CBEF is a Japan Aerospace Exploration Agency (JAXA) subrack facility located in the Saibo (living cell) Experiment Rack. The CBEF is used in various life science experiments, such as cultivating cells and plants in the Japanese Experiment Module (JEM).

Fluid Shifts: Today, FE-1 performed his Flight Day 45 baseline imaging for the Fluid Shifts experiment. With assistance from another crewmember as the onboard imager and ground remote guidance, ultrasound imaging was taken of arterial and venous measures of the head and neck, cardiac, ophthalmic and portal vein, and tissue thickness of lower and upper body. Additional measurements using the Cerebral and Cochlear Fluid Pressure (CCFP), Distortion Product Otoacoustic Emissions (DPOAE), Optical Coherence Tomography (OCT), ESA’s Cardiolab (CDL) Holter Arterial Blood Pressure Device, and Intraocular Pressure (IOP) using the tonometer were taken as well. Fluid Shifts is a joint NASA-Russian experiment that investigates the causes for severe and lasting physical changes to astronaut’s eyes. Because the headward fluid shift is a hypothesized contributor to these changes, reversing this fluid shift with a lower body negative pressure device is investigated as a possible intervention. Results from this study may help to develop preventative measures against lasting changes in vision and eye damage.

Portable Emergency Provisions (PEPS) Inspection: The crew inspected and confirmed that the Portable Fire Extinguishers (PFEs), Extension Hose Tee Kits (EHTKs), Portable Breathing Apparatuses (PBAs) and Pre-Breathe Masks are all free of damage. This maintenance is scheduled every 45 days to ensure continuous functionality of the units.

Today’s Planned Activities
All activities were completed unless otherwise noted.

Biochemical urine test
KORREKTSIYA. Collection of Blood Samples
KORREKTSIYA. Closeout Ops
KORREKTSIYA. Venous blood sample processing using Plasma-03 centrifuge
Insertion of Russian experiments blood samples into MELFI
KORREKTSIYA. Handover to USOS for MELFI Insertion
URISYS Hardware Stowage
KORREKTSIYA. Logging Liquid and Food (Medicine) Intake
Story Time Why So Fast Read
Story Time From Space Historical Photo
24-hour ECG Holter Monitoring – term
Cell Biology Experiment Facility (CBEF) Centrifuge Removal [Aborted]
Fluid Shifts OCT Baseline Setup
Fluid Shifts Ultrasound 2 HRF Rack 1 Power On
Fluid Shifts CDL Holter Arterial BP Hardware Don
24-hour ECG Holter Monitoring – term
Replacement of [???-?2?] Control Panel.
ISS Crew Adaptation
Fine Motor Skills Experiment Test
Fluid Shifts Ultrasound Baseline Scan
Soyuz 733 Transfers and IMS Ops
Cell Biology Experiment Facility (CBEF) Centrifuge Installation [Aborted]
Fluid Shifts CCFP Baseline Test
Fluid Shifts USOS Operations Historical Documentation Photography [Aborted]
Columbus ENERGY Stowage Repack
Multi-user Droplet Combustion Apparatus Session Review
Fluid Shifts OCT Baseline Exam
ISS Crew Orientation
Saibo Rack Remote Sensor Unit (RSU) Cable Reconfiguration
Cell Biology Experiment Facility (CBEF) Plant Experiment Unit 1G Installation [Aborted]
Fluid Shifts DPOAE Baseline Test
Fluid Shifts OCT Baseline Stow
Fluid Shifts Tonometry Baseline Setup
Environmental Health System (EHS) Grab Sample Container (GSC) Sampling Operations
Fluid Shifts Tonometry Baseline Exam
Fluid Shifts CDL Holter Arterial BP Hardware Doff
????-1? Temperature Check (pos. ?308).
Fluid Shifts CCFP Baseline Stow
Food Frequency Questionnaire (FFQ) or ISS Food Intake Tracker (ISS FIT)
Water Resource Management (WRM) Condensate Sample Init
KORREKTSIYA. Logging Liquid and Food (Medicine) Intake
Download Pille Dosimeter Readings
??? maintenance
Combustion Integrated Rack Hardware Gather
Water Recovery System Waste Water Tank Drain Init Handover
KORREKTSIYA. NEUROIMMUNITET. Experiment setup
????-1? Temperature Check (pos. ?308). Tagup with specialists
Water Recovery System Waste Water Tank Drain Termination with Sample
Delta file prep
Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) Quarterly Inspection
IDENTIFICATION. Copy ???-? micro-accelerometer data to laptop
Multi-user Droplet Combustion Apparatus MWA Prep
HRF Generic Urine Collection Setup
Water Resource Management (WRM) Condensate Sample Terminate
HRF Generic Frozen Blood Collection Setup
Relocating emergency mask bags.
Story Time From Space Historical Photo
Story Time Weightless Read
Environmental Health System (EHS) – Coliform Water Sample Analysis 44 +/- 4 hours post processing
Portable Emergency Provisions (PEPS) Inspection (XTP)
Collecting SM and FGB Air Samples Using ??-1? Sampler
CONTENT. Experiment Ops. Tagup with specialists
CONTENT. Experiment Ops
KORREKTSIYA. Logging Liquid and Food (Medicine) Intake
NEUROIMMUNITET. Saliva Sample
NEUROIMMUNITET. Starting 24-hr ECG Recording. Tagup with specialists

Completed Task List Items
STFS Orbit Demo
Habit HF Dir Obs Sub
Stow Nod2 Cleanup

Ground Activities
All activities were completed unless otherwise noted.
Nominal Ground Commanding

Three-Day Look Ahead:
Friday, 11/25: CIR MDCA maintenance, WHC maintenance, Eye Ultrasound, MARES EPM HD Install, COL HTV gather, Aquapad
Saturday, 11/26: Housekeeping, Crew Off Duty, HRF Collection
Sunday, 11/27: Crew Off Duty, HRF Collection

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Operate
Major Constituent Analyzer (MCA) Node 3 – Idle
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.