Today: Group Combustion Leak Check: The crew performed additional Group Combustion Experiment Module (GCEM) troubleshooting today, and completed a leak check of the Gaseous Nitrogen (GN2) supply line and associated Quick Disconnects (QDs).
The International Standard Payload Rack (ISPR) valves and QDs for the gas supply line were connected and reconfigured then underwent a five hour leak check of the Combustion Chamber (CC). Ground teams are assessing the data. The Group Combustion investigation tests a theory that fuel sprays change from partial to group combustion as flames spread across a cloud of droplets. In the Multi-purpose Small Payload Rack in the Kibo module, droplets of decane, a component of gasoline or kerosene, are arranged randomly on thin-fiber lattice points, and the flame and droplet positions and temperature distribution are measured as the flame spreads. Microgravity blocks convection, which on Earth would quickly disperse the droplets and combustion products before such measurements could be made.
Oxygen Generation System (OGS) Maintenance: After running nominally overnight, the Oxygen Generation Assembly (OGA) was put in a safe configuration this morning to allow the crew to inspect the H2 ORU QD. This inspection was due to the not fully mated configuration the QD remained in after yesterday’s activities. No water was noted on the QD or tape during the inspection. The rack was closed and OGS was reactivated and moded to operate at 22% producing approximately 2 kg of Oxygen (O2) per day.
Today’s Planned Activities
All activities were completed unless otherwise noted.
Crew Evaluation of New Food Items
Group Combustion Module (GCM) GN2 Leak Check Start
Inventory Management System (IMS) conference
Changeout of Dust Filter ??1-4 Cartridges in SM (???433???_?2_?II-1).
Progress 433 (DC1) Transfers and IMS Ops
Regenerative ECLSS Urine Processor Assembly (UPA) Brine Filter Changeout
BIOKARD. Performing experiment
Progress 433 (DC1) Transfers and IMS Ops
Vacuum Cleaning of ??1 and ??2 air ducts in DC1
??? maintenance
Regenerative Environmental Control and Life Support System (RGN) WSTA Fill
Multi-purpose Small Payload Rack (MSPR) /Group Combustion Module (GCM) Component Activation
Food Frequency Questionnaire (FFQ) or ISS Food Intake Tracker (ISS FIT)
VEG-03 Plant Photo
BAR. Experiment. Tagup with specialists
SM Ventilation Subsystem Preventive Maintenance. Group ?1
Strata Status Check
Group Combustion Module (GCM) GN2 Leak Check Stop
Oxygen Generation System Hydrogen Orbital Replacement Unit Quick Disconnect Inspection
Replacement of MRM1 Dust Filter cassettes ????1, ????2 (???433???_?2_?II-1).
VIZIR. Experiment Ops. Tagup with specialists as necessary
Crew Medical Officer (CMO) On Board Training (OBT)
Multi-purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Valve Operations
Regenerative Environmental Control and Life Support System (RGN) WSTA Fill
Space Headaches – Weekly Questionnaire
Multi-purpose Small Payload Rack (MSPR) /Group Combustion Module (GCM) Component Deactivation
Completed Task List Items
None
Ground Activities
All activities were completed unless otherwise noted.
4B3 Battery Reconditioning
SSC Server1 transition
OGS deactivation/reactivation for QD leak check
Transition ISS Server1 to ZBook
Three-Day Look Ahead:
Saturday, 11/12: Housekeeping, Crew Off Duty
Sunday, 11/13: Crew Off Duty
Monday, 11/14: Cygnus Cargo Ops, Water Balance
QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Operate
Major Constituent Analyzer (MCA) Node 3 – Idle
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Process
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up