Status Report

CAIB Photos Released April 10th, 2003

By SpaceRef Editor
April 15, 2003
Filed under ,

The '+Y' bipod ramp on ET-94 prior to dissection

The “+Y” bipod ramp on ET-94 prior to dissection. The LOX feed line runs near the bipod ramp.

The '-Y' bipod ramp on ET-94 prior to dissection.

The “-Y” bipod ramp on ET-94 prior to dissection.

ET-94 is moved into the Michoud facility to be prepared for bipod ramp dissection

ET-94 is moved into the Michoud facility to be prepared for bipod ramp dissection.

CAIB investigators Johnny Wolfe and Larry Butkus examine a test article

CAIB investigators Johnny Wolfe and Larry Butkus examine a test article being prepared for testing at MSFC.

SpaceRef staff editor.