CAIB Photos Released April 11th, 2003
An engineer at Michoud Assembly Facility (MAF) in New Orleans makes detailed measurements of the +Y Bipod Ramp foam prior to dissection. |
Dave Buras “dimensions” the bipod ramp by plotting points along the foam structure to create a 3-dimensional computerized model. |
CAIB investigators Johnny Wolfe and Larry Butkus examine a test article being prepared for testing at MSFC. |
Tammy Bourgeois and Michelle Cavett examine foam sample from ET-120 on a Scanning Electron Microscope (SEM) at the Michoud facility. |