MRPO Daily Status Report 2-11-03

By SpaceRef Editor
February 11, 2003
Filed under , ,

GMT Date: 042

Calendar Date: 02/11/03

Increment: 6

Stage: 11A

Week 11

Payloads currently on-board ISS:
BSTC, CGBA, CSLM-2, InSPACE, MAMS, MSG (facility), PFMI, SAMS, STES-10,
SUBSA and ZCG.

Status:
MAMS, SAMS and STES-10 continue nominal, basically unattended, operations.
BSTC, CGBA, CSLM-2, InSpace, PFMI, SUBSA and ZCG are inactive. MSG
is in a trouble-shooting mode.

EXPRESS RACKS 1 and 4 (ER1 & ER4) are powered and supporting payload
operations. ER2 & ER3 are currently powered down. ER2 power will
be turned-on tomorrow to trouble-shoot laptop computer communications
with the Rack Interface Controller (RIC). ER5 is available to support
payload operations but is currently inactive. ER1, ER3, ER4 and ER5 software
upgrades have been accomplished. The ER2 software upgrade will occur
after the laptop computer/RIC communications problem is solved.

The MSG circuit breaker problem is continuing to be evaluated and trouble-shooting
plans are being developed. Time is being allocated for performing trouble-shooting
procedures next week.

InSpace Coil assemblies have been confirmed to be ready to begin test
operations when it is feasible to install the payload in MSG.

MAMS is operating nominally in the quasi-steady mode. HiRAP is currently
inactive. The ISS was boosted to a higher orbit today and MAMS was active
during this event. MAMS data is available on the acceleration measurement
web page.

PFMI hardware removal from the MSG is contingent upon success of MSG
trouble-shooting.

All SAMS sensors in EXPRESS RACKS are operating nominally. The SAMS
sensor in the MSG is currently turned-off. SAMS was also active today
during the re-boost of the ISS to a higher orbit. SAMS data is also available
on the acceleration measurement web page.

STES-10 health and status data is nominal. STES-10 is configured with
diffusion-controlled chambers that require no crew operation activities.

Near-term Outlook:

Week 11(2/10-2/16) – Planning for this week was based on approximately
20 hours of crew time for NASA payload operations. The crew will continue
unloading Progress 10. MSG trouble-shooting is being delayed beyond this
week. ER2 laptop computer/RIC communication trouble-shooting is planned
and the SAMS filter is to be cleaned.

Week 12(2/17-2/23) – Preliminary planning for this week is being
based on approximately 21 hours of crew time for NASA payload operations.
Unloading Progress 10 will continue and the crew will have two PAO events.
MSG trouble-shooting is being planned several different times during
this week.

M. Vlasse, PhD, DSc
PSR Increment Scientist

ACRONYMS:

ARIS Active Rack Isolation System
BCSS Biotechnology Cell Science Stowage
BSTC Biotechnology Specimen Temperature Controller (General status information
on this payload will include coverage of the following items of support
equipment: BTR, BCSS and GSM)
BTR Biotechnology Refrigerator
CGBA Commercial Generic Bioprocessing Apparatus
ER1 EXPRESS RACK 1
ER2 EXPRESS RACK 2
ER3 EXPRESS RACK 3
ER4 EXPRESS RACK 4
ER5 EXPRESS RACK 5
GSM Gas Supply Module
InSPACE Investigating the Structure of Paramagnetic Aggregates
MAMS Microgravity Acceleration Measurement System
MSG Microgravity Science Glovebox
PAO Public Affairs Office
PFMI Pore Formation and Mobility Investigation
PGB Plant Generic Bioprocessing Apparatus
PSR NASA Code U Physical Sciences Research Division
RIC Rack Interface Controller
SAMS Space Acceleration Measurement System II
SPD NASA Code U Space Products Development Division
STES Protein Crystal Growth – Single Thermal Enclosure System
SUBSA Solidification Using a Baffle in Sealed Ampoules
ZCG Zeolite Crystal Growth

SpaceRef staff editor.