Status Report

SATOPS Morning Report February 10, 2003

By SpaceRef Editor
February 10, 2003
Filed under , ,

DMSP

On February 8 at approximately 22:30z, DMSP engineering was notified that an OPS48 battery pack temperature delta of greater than 6 degrees was observed.  Engineering came in to investigate and found out that between 0600z and 2400z on February 8, that Bat 2 Pack A temp increased about 2.25 degrees.  No action was taken at the time and crews were informed of the condition and advised to monitor.  The OPS48 batteries are currently commanded to a trickle charge rate (via BATMN) due to minimal discharging. Engineers are reviewing options to reduce solar input to the Battery Pack to help bring the temperature down. An SCCR has been drafted to accomplish this if needed.

POES

All POES operations were nominal over the past 72 hours.

GOES

GOES-12 remains in a test phase, in normal on-orbit mode, drifting at an eastward rate of 0.33 degrees per day toward the GOES-East position where it will replace GOES-8 in April.  Routine SXI imaging is proceeding along with SXI test exposures.

GOES-9 is drifting at a westward rate of 0.79 degrees per day toward 155 E longitude where it will support the GMS-5 replacement mission in April.

All GOES operations were nominal over the past 72 hours.

SpaceRef staff editor.