MRPO Daily Status Report 11-18-02
GMT Date: 322
Calendar Date: 11/18/02
Increment: 5
Stage: 9A
Week 24
ISS:
The launch of STS-113/11A is now delayed until no earlier than late Thursday
central time or early Friday GMT.
Payloads to be launched on STS-113/11A:
CSLM-2, STES-10, ZCG Autoclaves & Hard drives, InSpace Coil Assemblies
Payloads to be returned on STS-113:
CGBA, PGBA, STES-7, ZCG Autoclaves & Hard drives
Payloads currently on-board ISS:
BSTC, CGBA, InSPACE, MAMS, MSG (facility), PFMI, PGBA, SAMS, STES-7, SUBSA
and ZCG.
Status:
MRPO payloads CGBA, MAMS, PGBA, SAMS and STES-7 continue nominal, basically
unattended, operations. BSTC, InSpace, MSG, PFMI, SUBSA and ZCG are currently
inactive.
EXPRESS RACKS 1, 2 and 4 (ER1, ER2& ER4) are powered and supporting
payload operations. ER3 and ER5 are available to support payload operations
but are currently inactive. ARIS hardware is to be installed in ER3 tomorrow.
CGBA health and status data is nominal. CGBA is to be returned on STS-114
(ULF1).
MAMS is operating nominally in the quasi-steady mode. HiRAP is currently
turned-off. MAMS data is available on the acceleration measurement web
page.
PGBA health and status data is nominal. PGBA power had to be cycled Saturday
to recover health and status data. Downlink of video from the PGBA internal
cameras has not been successful. PGBA is to be returned on STS-113.
Additional PFMI operations are being considered due to the continued
launch delay for STS-113/11A.
All SAMS sensors in EXPRESS Racks are operating nominally. The SAMS sensor
in the MSG is currently turned-off. SAMS data is also being posted to
the acceleration measurement web page.
STES-7 health and status data is nominal. All growth chambers are activated.
All growth chambers are to be deactivated after the launch of STS-113/11A
but before docking. STES-7 is to be returned on STS-113.
ZCG operations have been completed. The processed autoclaves have been
removed and stowed in preparation for return on STS-113.
Near-term Outlook:
Week 24 (11/17-11/23) – The crew is continuing prepack activities
and practicing remote arm procedures to be used during STS-113/ISS Joint
Operations. The crew sleep cycle has been shifted ten hours earlier than
normal in preparation for the planned arrival of the Increment 6 crew.
STS-113/11A could possibly dock as early as Saturday. Additional PFMI
operations may be planned.
Week 25 (11/24-11/30) – A replan of this week will be necessary
after a firm launch date for STS-113/11A is established.
M. Vlasse, PhD, DSc
MRPO Increment Scientist
ACRONYMS:
ARIS–Active Rack Isolation System
BCSS — Biotechnology Cell Science Stowage
BSTC– Biotechnology Specimen Temperature Controller (General status information
on this payload will include coverage of the following items of support
equipment: BTR, BCSS and GSM)
BTR — Biotechnology Refrigerator
CGBA – Commercial Generic Bioprocessing Apparatus
ER1– EXPRESS RACK 1
ER2 — EXPRESS RACK 2
ER3 – EXPRESS RACK 3
ER4 – EXPRESS RACK 4
ER5 – EXPRESS RACK 5
GSM — Gas Supply Module
InSPACE– Investigating the Structure of Paramagnetic Aggregates
ISS – International Space Station
MAMS — Microgravity Acceleration Measurement System
MSG – Microgravity Science Glovebox
PFMI – Pore Formation and Mobility Investigation
PGBA – Plant Generic Bioprocessing Apparatus
SAMS — Space Acceleration Measurement System II
STES – Protein Crystal Growth – Single Thermal Enclosure System
SUBSA – Solidification Using a Baffle in Sealed Ampoules
ZCG – Zeolite Crystal Growth