ESMOS STATUS MEETING MINUTES



The ESMOS Status Meeting was conducted by K. Dolan at 1:00 PM April 23, 2002. The meeting was held in Room N202 in Building 32.

General Comments and Related Discussion:


No news of any change to the May 2nd Aqua launch date; there may be an announcement tomorrow.

No information from the Code 420 telecon this morning.

Discussion of ESMOS Top Ten Issues


K. Dolan discussed the top ten issues.


#1 — FY03 budget – SOMO backing out of funding networks, institutional support and technology programs: Budget presentations have been made to Code 420 and Code 400; next presentation is to NASA Headquarters. ERBS is not part of the current budget.



#2 — Getting a contract in place to provide anomaly support from LMMS, SBRS, and L3COM: Gave up on a separate L3COM contract; will be part of POES contract. There is still an issue with Santa Barbara.

#3 — NISN/Code M line cost threat: Jeff has put together a plan for network support outside of CSOC.


#4 — End of Mission planning for ERBS and UARS: Meetings on ERBS were held with Phil Sabelhaus and Bill Townsend; setting up a meeting at NASA Headquarters.

#5 — USGS has not provided money to cover FY02 Landsat-7 network costs. NASA has not budgeted for this cost: Closer to resolving; there were procedural problems related to using the funds.


#6 — Problem reprocessing ASTER data: A direct downlink was requested to Vietnam.


#7 — System vulnerabilities: Paul is meeting on this issue.

#8 — Space in Building 3/14 for EDOS development facilities: This is a new item but Alan stated that it may not need to be on this list.

#9 — Aqua Transition: Plan is due in a few days.

#10 — DSMC transition: NCC and WOTIS operations are moving to WSC during 2002: A White Sands/WOTIS interface test was successful; still need to run an end-to-end test which will not be scheduled until after Aqua launch.

#11 — NACs: Getting in good condition; there are still a couple who will need escorts for Aqua launch support.


#12 — Readiness of Ground Network to support Aqua: Presentations to Center management is completed. This item is closed.



Comments by K. Dolan and Related Discussion:


Calendar was reviewed. There is a short anomaly meeting following this meeting. There is a party for Dolly on May 9th.

Comments by G. Knoble and Related Discussion:


Reconfiguration for the Norway E1 and T1 lines was completed yesterday and working fine. If one line goes down, the other line will pick up in 3 minutes.

The Norway UPS is to be installed on April 27th.

Comments by B. Guit and Related Discussion:


The new UARS control center is doing fine.

Starting on the ERBS transition; having trouble determining/agreeing upon CSOC’s level of involvement under the completion form part of the contract.

Comments by H. Wong and Related Discussion:


Still holding to the May 2nd Aqua launch date. The last scheduled LRWG meeting is at 2:00 PM today; will close all open papers.

The LRR is scheduled for May 30th.

Will attempt to fix and test the grounding path problem tomorrow.

Comments by C. Sigman and Related Discussion:


The UPS installation at Norway needs a waiver signed by the Aqua mission manager. (Subsequent to the meeting, the waiver was completed)

Changes to the firewall will be made at L-7 days for Aqua IST’s.

Comments by P. Garza and Related Discussion:


A copy of all UARS related correspondence will be routed to Bill Guit.

TDRSS naming convention changes were completed.

Comments by A. Jansen and Related Discussion:


Terra was transitioned to TDRSS 8; will start using on April 24th.

Continuing to prepare the FOT for the Aqua launch.

Comments by B. Kozon and Related Discussion:


The L3COM contract is worked out; going through the POES contract. Still working on the Santa Barbara issue.

Comments by R. Lonigro and Related Discussion:


There is a Delta V this afternoon.

Comments by L. Kurzmiller and Related Discussion:


FDF monitored the center frequency offset test for transponder 2. The test went well.

Comments by E. Corderman and Related Discussion:


FDS Release G4 was promoted.

There is a FDS all hands meeting on April 25th.

Comments by V. Yocco and Related Discussion:


The new SGT contract is in place.

Comments by K. Lehtonen and Related Discussion:


There is one more mission readiness test with 524 kbps data with SKS.

 


Attendees:


Elizabeth Corderman


Phil Province


Ken Dolan


Guy Cordier


Alan Johns


Corinne Reed-Miller


Lou Koschmeder


Bill Guit


Lou Kurzmiller


Osvaldo Cuevas


Dave Lorenz


Lucia Gayhart


Jim Elliott


Vickie Lopez


Rick Hudson


Andy Jensen


Rory Casey


Pat Johnson


Bob Kozon


Warren Case


Ken Lehtonen


Bill Guion


Rich Lonigro


Paul Garza


Gordon Knoble


Clayton Sigman


Ed Macie


Victor Yocco


Jeff Smith


Hank Wong

SpaceRef staff editor.