SOHO Daily Meeting Minutes for Monday, 6 May 2002
ANNOUNCEMENTS
————-
* RHESSI target for today is AR 9934; target for tomorrow
is AR 9934.* JOP104 target for today is AR 9919, 9926 (and 9930);
target for tomorrow is the same.* The UPS-20 maintenance for today has been cancelled.
* PMI has been scheduled to perform corrective maintenance on
PDU-D16 on May 7 from approx. 10:30 am until 2:30 pm. This unit
is one of two PDU’s that feed the ISTP areas in building 3 rooms
C130, C150, C156 and C160. All equipment on this PDU must be
shut down and powered off prior to the maintenance start time.FOT REPORT
———-
Spacecraft Status: NominalSpacecraft Anomalies: Nominal
Accomplished Activities:
DOY 123: VIRGO, SWAN, RSL
DOY 124: VIRGO
DOY 125: VIRGOPlanned Activities: VIRGO
Upcoming Operations: None
Ground Anomalies:
124/0425 D46 antenna had to stow due to fire alarm at site.
Emergency record script executed. Lost 28 minutes
of MDI high rate data.
124/0623 Wayward command delayed pass activities two
minutes.
124/1325 Unable to establish a solid command link on D27.
D16 brought up as a replacement. Unable to command
for 1 hour 19 minutes.
124/1459 Lost uplink on D16 due to the antenna going to
brake. Delayed commanding activities 9 minutes.
No data loss.
124/1522 ACU anomaly, TC timeout between words, resulted in
the CRS drift estimate command being rejected.
Manually updated the CRS drift value.
125/1613 Received degraded TLM from 1613 to 1700 (47
minutes) due to a RCVR failure at D7. Lost data is
unrecoverable.
125/2131 NRT activities delayed until upcoming D46 support
due to the inability to establish a solid uplink
on D27.SOLAR STATUS
————
05/03 DOY 123 – 05/06 DOY 126EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020506.htmlLASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.htmlWeb Page for Planning:
http://www.bbso.njit.edu/armINSTRUMENT STATUS
—————–
CDS: Nominal. Full sun observations, engineering. Tomorrow; JOP104,
RHESSI support, sunspot oscillations, engineering.SUMER: Nominal. JOP104 on AR 9919, 9926 (and 9930).
UVCS: Nominal. Coronal hole observations in the north east and long
synoptic. Tomorrow: coronal hole observations and synoptic.LASCO: Nominal. C2/C3 synoptics.
EIT: Nominal. Half-resolution 195 CME watch and synoptic.
MDI: Nominal. Full disk magnetograms and dopplergrams for continuous
contact.TRACE: Nominal. 195 flarewatch on AR 9934 for RHESSI support.