SOHO: 15 January 2002 MM/SK Timeline
Last Update: 11 January at 20:17 UT
Standard Disclaimer: All times are in UT and are estimates.Delta-V magnitude: 0.038 m/sec
Burn Duration: 5.5 min (at 5% duty cycle)
Fuel Usage: 0.041 kg + MM usage** STOF will not safe based on current fuel estimates,
but may reconsider if total exceeds 50 grams.FRIDAY — 11 January 2002
————————-
* MDI will uplink a tuning and focus load for 60-day
continuous (allow uninterrupted 1 hour and 15 minutes)MONDAY — 14 January 2002 — Instrument Safing
———————————————–*** Limit violation sheets need to be in by 4pm local
DSS-66 07:40 – 15:25 UT
DSS-27 15:05 – 00:05 UT
* UVCS safing at 20 UT
* LASCO closes doors at 22 UT
DSS-46 23:45 – 06:00 UT
* CDS closes door after 24 UT
TUESDAY — 15 January 2002 — Maneuvers
—————————————–
DSS-54 08:15 – 12:20 UT
SVM Reserved for Step 2 of Maneuver Prep
(Cat Bed heaters ON), only takes about 5 minutes
NRT could be made available very early if necessary.DSS-16 15:00 – 00:20 UT
SVM Reserved Time for Maneuvers* Instrument Activities done by FOT
– FOT has SOC notify MDI and opens MDI’s ISS loop
– Remove SWAN from ESR warning flag receiver list
– SWAN Safing
– Disable offpointing flag function for LASCO, MDI, UVCSSVM Reserved Continues – First burn at 16:30 UT
* Maneuvers – SK (5.5 minutes burn) then MM (total of 75 minutes,
done in 3 segments of varying lengths)* Instrument Recovery activities done by FOT
– Re-enable offpointing flag function for LASCO, MDI, UVCS
– FOT has SOC get clearance from MDI and then closes
MDI’s ISS loop via TSTOL
– Recover SWAN (2 hours after last thruster firings)
via usual TSTOLs
– Return SWAN to ESR warning flag receiver list* After SWAN recovery, the delayed command file
SWA02_________.DEL science load should be uploaded.~21-22 UT FOT should be done
* 23 UT UVCS may recover (~45 minutes, pauses tolerated with warning)
or on DSS-27 WednesdayWEDNESDAY — 16 JANUARY 2002
—————————
DSS-46 02:45 – 06:10 UTDSS-66 07:55 – 15:10 UT
DSS-27 15:05 – 00:25 UT
* If UVCS has not recovered, they will recover on DSS-27
(~45 minutes, pauses tolerated with warning)THURSDAY — 17 JANUARY 2002
—————————
DSS-46 00:25 – 07:50 UT* CDS will open doors on D46 (~5 minutes)
DSS-66 07:40 – 15:40 UT
DSS-16 15:20 – 00:25 UT
* LASCO will open doors at 16 UT
* EIT Shutterless observations 17:00-19:40 UT
DSS-46 00:05 – 07:50 UT