Status Report

FMARS Crew Status Report #3 – 11 July 2001 – 10:00 PM MDT

By SpaceRef Editor
July 11, 2001
Filed under , ,

Status: Mars Simulation in Progress

Phase 2 Crew:

Commander: Dr. Robert Zubrin
Geologist: Katy Quinn
Biologist: Dr. Charlie Cockell
Physicist: Dr. Vladimir Pletser
Computer Scientist: Dr. Bill Clancey
Engineer: Dr. Stephen Braham


The second phase has begun with new members added to the crew. The new commander is
Dr. Robert Zubrin. Other new crew members include Dr. Vladimir Plester a physicist with
the European Space Agency, Dr. William Clancey a computer scientist from NASA AMES and
Katy Quinn who is just completing her Ph.D. in geology at MIT. Remaining in the hab
for Phase 2 are Chief Engineer Dr. Stephen Braham of Simon Fraser University and Dr. Charlie
Cockell, biologist from the British Antarctic Survey.


Today the crew spent the morning doing some housekeeping in the hab. This afternoon the
crew perfomed an EVA on Haynes Ridge. The goal of the EVA was to search for fossils
along the ridge. The EVA was quite successful. Linked below you’ll find detailed
crew reports.


One persisting problem is with the high-speed space-based networking segment.
Chief Engineer Stepgen Braham discovered some misconfiguration in the unified
upconverter/downconverter solid state power amplifier system (SSPA), due to some
random reset. Stephen is attempting to troubleshoot the problem. If the problem
persist replacement parts will need to be installed. This could take a week. In the
meantime high speed internet access is not available.


The next FMARS crew status report will be issued following crew
report period on Thursday evening, or sooner as events warrant.