Space Stations

NASA Space Station On-Orbit Status 14 March 2017 – Mobile Servicing System Hard at Work

By Marc Boucher
Status Report
March 15, 2017
Filed under , ,
NASA Space Station On-Orbit Status 14 March 2017 – Mobile Servicing System Hard at Work
Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians perform final cargo installation in the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station. Credit: NASA/Bill White.
NASA

Today – 2A Direct Current to Direct Current Converter Unit (DDCU) Trips: Today, all of the DDCUs on the 2A power bus tripped off simultaneously due to a bus undervoltage. This included DDCU 2A, DDCU LA2A, DDCU N2P2A, and DDCU N32A. The trip of DDCU 2A removed power from the 2A Pump Flow Control Subassembly (PFCS).
Loads from the other DDCUs were picked up by parallel DDCUs and did not unpower hardware. Ground controllers stopped the 2A battery capacity test that was in progress and reactivated DDCU 2A and the 2A PFCS. Cooling has been re-established to the 2A Batteries. There were no thermal clock exceedances. Ground teams are reconfiguring the EPS system back to nominal and investigating the cause, suspecting that an unexpected power load during the battery capacity test triggered the bus undervoltage.

Mobile Servicing System (MSS) Operations: Overnight, Robotics Ground Controllers stowed the Materials International Space Station Experiment (MISSE) payload inside the SpX-10 Dragon trunk. The Robotics Ground Controllers then configured the Space Station Remote Manipulator System (SSRMS) and the Special Purpose Dexterous Manipulator (SPDM) for the start of the Robotic Refueling Mission (RRM) payload stow in the Dragon trunk later tonight. MSS performance was nominal.

Rodent Research-4: Today, the crew performed the last day of operations for Rodent Research-4. In coordination with ground specialists, the crew collected samples and stowed them in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return on SpX-10. The Tissue Regeneration-Bone Defect (RR-4) investigation studies what prevents vertebrates such as rodents and humans from regrowing lost bone and tissue, and how the microgravity extraterrestrial condition impacts the process. Results could lead to tissue regeneration efforts in space and a better understanding of limitations of limb regrowth at wound sites.

Water Sampling: Today the crew performed nominal Environmental Health System (EHS) Potable Water Dispenser (PWD) sampling for in-flight and post-flight analysis. In-flight Total Organic Carbon Analyzer (TOCA) samples were also performed. In coordination with the water sampling, the crew initiated the ESA sponsored Aquapad (Paper Analytical Device) technological demonstration and sampling using the Microbial Monitoring System (MMS) portion of the WMS experiment. By using the same water collected for the EHS sample, ground teams can evaluate the capabilities of the new hardware. For the MMS analysis, the crew configured the hardware to sample a low and high DNA concentration sample using the Razor Polymerase Chain Reaction (PCR) Microbial Monitoring System. The WMS is a set of hardware that monitors microbes, silica and organic material in the water supply on the ISS. The hardware ensures crew members can test and monitor the safety of their water supplies on future space missions, especially on long-duration missions to Mars, asteroids or other destinations where Earth-based testing would be difficult or impossible. Aquapad is a new approach developed by France’s CNES space agency: paper impregnated with powdered growth medium creates a 3D petri dish. When water is added, the microbes form colored spots revealing their locations. Using a tablet computer application the crew will photograph the dots to calculate precisely how many bacteria are present.

Advanced Plant Experiments (APEX)-04: The crew checked the status of the APEX-04 Petri Plate for condensation, then photographed the plate on the Advanced Biology Research Facility (ABRS) photogrid. The LMM Biophysics plate that was in the Light Microscopy Module (LMM) facility was inserted into the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) and APEX-04 petri plate was installed. The APEX-04 (Epigenetic change in Arabidopsis thaliana in response to spaceflight – differential cytosine DNA methylation of plants on the ISS) experiment investigates how spaceflight can affect an organism on a molecular level without altering its outward appearance. Previous research has demonstrated that large numbers of plant genes are expressed differently in space compared to plants on Earth, which can alter how plants grow. This investigation studies the entire genome of thale cress plants grown in space, creating maps of spaceflight-specific changes in certain groups of genes. Results give new insight into plants’ molecular responses to spaceflight, which benefits efforts to grow plants in space for food and oxygen.

Local Bus (LB) Mech Bus Checkout – Yesterday, in preparation for the Enhanced Processor Integrated Communications (EPIC) EXT Multiplexer/DeMultiplexer (MDM) upgrade, ground controllers performed a checkout of the LB-MECH-P1, P2, S1, and S2 buses. This checkout serves as a baseline assessment of the health of the buses before the new EPIC EXT MDMs are installed. There were no issues with the buses. When the Payload Attach System (PAS) 3 Umbilical Mechanism Assembly (UMA) was powered in the checkout, the mated switch did not show mated. This is thought to be caused by an already-known issue in which the UMA springs backdrove the active connector enough to lose the mated indication from the switch but did not demate the connector. External Stowage Platform (ESP)-3, which is on PAS 3, is receiving power nominally.

Today’s Planned Activities
All activities were completed unless otherwise noted.

Environmental Health System (EHS) Potable Water Dispenser (PWD) Sample Collect
Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Setup
ASEPTIC. Glovebox-C Hardware Power On
ALGOMETRIA. Measurement Prep & Ops in the strain-gauge and thermal algometry modes
Fluids Integrated Rack Rack Doors Open
ASEPTIC. Taking samples from Glovebox-C surface after sterilization. Air Sample Collection Prep. H/W set up. Pump Activation.
APEX-04 Petri Plate Check
Verification of ??-1 Flow Sensor Position
Total Organic Carbon Analyzer (TOCA) Potable Water Dispenser (PWD) Sample Analysis
Medical Kits Inventory Check
Light Microscopy Module APEX-04 change out of Petri Plates
Microbial Monitoring System Hardware Gather
DAN. Experiment Ops.
Microbial Monitoring System MWA Preparation
Urine Processor Assembly (UPA) EDV Transfer Hose Remove and Replace (R&R)
Fluids Integrated Rack Rack Doors Close
Photo/TV Camcorder Setup Verification
Rodent Research Node 2 Camcorder Video Setup
Rodent Research 4 Pink Habitat Transfer
Coliform Water Processing
Kurs-P Cable Reconnection from DC1 AFD to MRM2 AFD and photography of the connection location
Aquapad Double Water Sampling
Rodent Research 4 Green Habitat Transfer
ASEPTIC. Monitoring Automatic Pump Power off
OTKLIK. Hardware Monitoring
ASEPTIC. Preparation and Initiation of Air Sample Collection – “Vozdukh” #3. Pump Activation.
Total Organic Carbon Analyzer (TOCA) Sample Data Record
Microbial Monitoring System Sample Setup
Photo/TV Camcorder Setup Verification
ALGOMETRIA. Measurement Ops in the strain-gauge algometry mode
Microbial Monitoring System Sample
Wastewater Storage Tank Assembly (WSTA) Fill
Recharging Soyuz 732 IRIDIUM Satellite Phone – Setup (???1???_2_224_1 0.5 CTB 1017 Soft Container 00044322R), initiate charge
Auxin Transport Sample Fixation Demonstration
Recharging Soyuz 732 IRIDIUM Satellite Phone – Battery Charge Monitoring
Recharging Soyuz 732 IRIDIUM Satellite Phone – Term
??? (???) separation for ELEKTRON or ???-?? Fill ??? (???) #1201 (???1???_1_108) and ???-?? #1242 (???1???_1_109) from ??1 Rodnik of Progress 435
Auxin Transport Fixation Kit GLACIER Retrieval
ASEPTIC. Monitoring Automatic Pump Power off
Water Resource Management (WRM) Potable Bus Sample
ASEPTIC. “Vozdukh” #2, 3 and “Poverkhnost” #2-5 Withdrawal from the box and placing into ? Cryogem-03.
Rodent Research 4 Tan Habitat Transfer
??? maintenance
Microbial Monitoring System Data Transfer
ASEPTIC. Glovebox-C Power Down
VELIKOE NACHALO. Video Report about Glovebox-C
CONTENT. Experiment Ops
IMS Delta File Prep
ASEPTIC. Closeout Ops with Glovebox Hardware Tagup with specialists
Rodent Research 4 MELFI Insert
Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Stow
ALGOMETRIA. Measurement Ops in the strain-gauge and thermal algometry modes Closeout Ops

Completed Task List Items
On-Orbit Hearing Assessment (O-OHA) with EarQ Software Setup and Test
Habitability Human Factors Questionnaires
Dragon Cargo Message #4

Ground Activities
All activities were completed unless otherwise noted.
N3 MCA Manual Calibration
MISSE Install in Dragon Trunk
RRM Install in Dragon Trunk
2A1 and 3B1 Battery Capacity Test

Three-Day Look Ahead:
Wednesday, 03/15: Dragon Cargo Transfer, Auxin Transport, NanoRack Science Box 2, MERLIN1 Transfer
Thursday, 03/16: APEX, Sample transfers to Glacier/Polar, FCPA Inspection, EVA Loop Scrub, RR Habitat Stow
Friday, 03/17: At Home In Space, Dragon Depart OBT, Dragon Transfers, Rodent Research Stow, PMA3 Leak Check, WVE R&R Prep

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – Manual
[???] 1 – SM Air Conditioner System (“SKV1”) – Off
[???] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Operate
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Process
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

SpaceRef co-founder, entrepreneur, writer, podcaster, nature lover and deep thinker.