EVA Tools and Crew Aids Panel Minutes of Meeting 5 Feb 2001
The EVA Tools and Crew Aids Panel met at JSC on February 5, 2001, in Building 1, Room 360, at 1:00 p.m. Representatives from the following organizations participated:
EVA Project Office
Hardware Development
Engineering Directorate
Crew and Thermal Systems Division
FCE EVA
Safety, Reliability and Quality Assurance Office
Hamilton Standard Management Services
Lockheed Martin
GSFC
Panel members from the following organizations participated:
XA/Panel Chair, XA/Panel Secretary, XA/Integration and Operations, CB/Astronaut Office, DX3/EVA, Robotics, and Crew Systems, EC5/Crew and Thermal Systems Division, NA/SR&QA, and USA FCE/EVA.
The following items were presented:
- PRACA Status NS43/T. Miller
Seventeen FIARs are open for EVA hardware. Six FIARs were reported as past due and statused as follows:
JSCEC0796 Active WIF Assy. Active WIF Control
nob appeared to have increased force to operate.
Final in XA signature loop.
BFCE029F105 PGT. Pistol Grip Tool chatter.
To hold open throughout flight. Interims written for 5A, 5A.1. New ECD 3/1/01.
JSCEC0841 PFR Gimbal Assy. Roll joint buttons binding.
To look at process and talk to EM.
JSCEC0814 TERA Out of configuration.
In XA signature loop.
JSCEC0846 APFR. Rotation of collar is difficult/sticking.
Closure in work. New ECD 2/16/01.
JSCER0033 USA SAFER. NSI trace on oscilloscope appeared abnormal.
Closure in signature loop. CR in review. Will present to 2/7/01 EHB.
No new FIARs were reported.
All STS-98 FIARs are closed.
The EVA hardware oldest FIAR, opened against the Adaptive Payload Carrier, is 519 days old.
FIARs open by flight:
STS-98 0
STS-102 1
STS-100 3
STS-104 11
- Cert Status NC52/G. Wright
All hardware certification is closed for STS-98. There are two open hardware certifications for STS-102 EVA Scissors, and QD Cap Removal Tool. An ESEL revision is in work to delete the QD Cap Removal Tool. There are five open hardware certifications for STS-100 11/16" Box End Wrench, USA SAFER, SAFER IVA Battery, EMU RF Camera Assy, and Equipment Tether Reel. A "first cut" at the STS-104 open certifications was also included.
- Actions Review XA/D. Roberts
- Pending CR Review XA/D. Roberts
- HITS Status Review XA/J. Manning
This item was deferred.
This item was deferred.
This item was not presented.
- Gage Status EC5/K. Hostetler
- H-0925 Baseline STS-109 (HST-03B) Tools ESEL XA/B. Counts
This item was not presented.
This CCBD is a "first cut" at baselining the STS-109 (HST-03B) Tools ESEL. Issues were raised concerning additional quantities of several hardware items, including the Standard PFR, PBAS, EMU Middeck Chargers, EHIP and EHIP Charger, and ratchets. The Chairman requested the ESEL be revised to take all items back to the Standard ESEL quantities.
The following actions were assigned:
Action 2/5/01-1: Schedule meeting with MOD, XA I&O, and GSFC to discuss and revise the ESEL to justify any adds and return to the Tools Panel with inventory story.
Actionee: XA/B. Counts
Due Date: 3/5/01
Action 2/5/01-2: Investigate whether ERCA is a requirement, and if so, if the Orbiter is outfitted to carry.
Actionee: DX3/J. Ray
Due Date: 2/19/01
Decision: Update CCBD and route for technical concurrence.
- H-0686R3 Update STS-104 (7A) Tools ESEL XA/B. Counts
This Revision 3 to the STS-104 (7A) Tools ESEL includes the addition of the QD Contingency Tool and the Essex Wrench, the move of the Crew Lock Bag from 6A to 7A, replacement of two SSP GP Caddies with ISS versions, and multiple part number, configuration and serial number updates. A comparison of standard SSP and ISS core tools vs. post 7A ISS Airlock quantities was also presented. A working group to include MOD, XA I&O, XA TRI, Engineering, and the Increment Crew will be established to review this comparison and finalize the ESEL.
Upon review of the ESEL, the following actions were assigned:
Action 2/5/01-3: Provide details of towel bar installation task to EC5 for review.
Actionee: DX3/O. Koehler
Due Date: 2/9/01
Action 2/5/01-4: Review planned task with Essex Wrench and advise of findings/results.
Actionee: EC5/R. Schwarz
Due Date: 2/19/01
Decision: Route for technical concurrence.
- H-0945 Certify Shuttle Tools for ISS On-Orbit Stowage and USE XA/L. Crocker
This CCBD requests certifying the following tools for stowage and use on ISS:
- EHIP/PGT Cable
- Hydrazine Detection System
- Hydrazine Detection Tube
- PGT/EHIP Y0Power Charger Cable
- Velcro Tape Caddy
Decision: Redline required certification/delivery dates and present to 2/7/01 EHB.
- H-0648R4 Revise STS-100 ESEL (ISS 6A) XA/R. Fair
This Revision 4 to the STS-100 (6A) Tools ESEL contains required updates, including the following:
- EMU: Move to middeck, 4 adjustable equipment tethers
- Middeck: Move from EMU, 4 adjustable equipment tethers
- Add HST PT Battery Bag
- Change SAFER configuration from 305 to 309
- Change SAFER Battery configuration from 303 to 305
- Change Wire Tie Caddy from 1 to 2
- Port TSA: Change numerous tool and tool set serial numbers
Decision: Route for technical concurrence.
- H-0668R6 Update STS-102 (5A.1) Tools ESEL XA/A. Mears
- Walk-on: STS-102 (5A.1) Tool-to-Tool Fitcheck Status HSMS/J. Case
- H-0948 Quarter Turn Fasteners for HST-03B XA/J. Dutton
This Revision 6 to the STS-102 (5A.1) Tools ESEL contains required updates, including serial number updates, correction of part numbers, and addition of 1 each SSP Torque Multiplier and GSE Latch Pin Caddy, one each LCA Lug, and deletion of the EVA Ohmmeter and _" QD Cap Tool.
Decision: Route for technical concurrence.
STS-102 open fitchecks include the REBA Charger to REBA and PGT/EHIP Y-Power Charger Cable, Torque Multiplier to MMWS Gimbals and Swingarms and the 3/8" Drive Ratchet. The Y-Power Charger Cable will be returned from USA via TPS to fitcheck to the REBA Charger.
This CCBD requests shipment to GSFC of 24 each of the Quarter Turn Assy, Latch Plate and Latch Nut Plate.
Decision: Route for technical concurrence.
No further items were submitted and the Tools Panel adjourned.
Submitted by: Approved by:
(Original signed by) (Original signed by)
________________________________ ________________________________
Harriett A. Attaway Dale R. Roberts
EVA Tools & Crew Aids Panel Secretary EVA Tools & Crew Aids Panel Chairman
Note: CARD changes are normally routed for concurrence after the Panel adjourns. Initiators are requested to be present or have representation for discussion of the change.